Loading...
16-103171' Mechanical City of Federal Way Permit #: 16 103171 -00 -ME Community &Econ. Dev. Services 33325 8th Ave S FILE Federal Way, WA 98003 Inspection Request Line: 253 8 Ph: (253) 835-2607 Fax: (253) 835-2609 Pe G � ) 35-3050 Project Name: JAGMIN Project Address: 2016 S 370TH ST Parcel Number: 721265 1820 Project Description: Install AC Addon Daikin14 series 3T Owner A1212lican Contractor JEFFREY JAGMIN WAYNE KENNISON DR COOL INC (GENERAL) AMY JAGMIN DR COOL INC DRCOOI.024QE (3/15/18) 2016 S 370TH ST 1723 PEASE AVE E PO BOX 2322 FEDERAL WAY WA 98003 SUMNER WA 98390 SUMNER WA 98390 Additional Permit Information Mechanical Work Valuation?.................................4100.00 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures' Air Conditioners - Stand Alone Un 1 PERMIT EXPIRES Wednesday, December 28, 2016 Permit Issued on Friday, July 1, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: F,NALED CRT CW 4A!� Federal Way TIIIIS CARD IS TO IN ON-SITE Construction In ction Record INSPECTION REQ TS: (253) 835-3050 PERMIT #: 16 -103171 -00 -ME Address: 2016 S 370TH ST Project: JEFFREY JAGMIN FEDERAL WAY, WA 98003-7740 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical oug -in (4165)Gas El iping (41 25) Final Electrical Approved Final - Mechanical ( ) Right of Way Approved Approved Date Approved to release test By Approved By Date By Date By 4 Date 1r V it, Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date