Loading...
14-103149 III • RECEIVED PERMIT APPLICATION Federal Way JUN 3 0 2014 �A, CITY OF FEDERAL W Y- TARGET DATE �/ PERMIT NUMBER / ( 3Df ER y 5 r 13 0 - SITE ADDRESS SUITE/UNIT! 13 q s. 36i +- PL. jderdi 'L✓gu], LA),4 Qfs&)3 PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL S TYPE OF PERMIT ti(BUILDING 0 PLUMBING 0 MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT 2 re p►e tervle vt 1- PROJECT DESCRIPTION '&vKov$1 a4- S' Ke row' , tu +{lam o 4 pi ` ot)`l Detailed description of work to f'1 ec ic,r�, , 5 h 1.11 C •(JYl,clerle meA 4-, Cer 4- W1`l" be included on this permit only I2v made-- 51 y,l IeS. NAME J' PRIMARY PHONE PROPERTY OWNER 080 cl geld U -► Tama re S a- (3,- 39(v -5352- MAILING ADDRESS E-MAIL t3G S. 36/s-/- Pi-- CITY STATE ZIP rectiff8 I way WA. R goo NAME PHONE 0o11+'hern Pacj/ EXteriofS -S-ea. 261 KilV MAILING ADDRESS ! E-MAIL y eic�enar�. CONTRACTOR I q�-o HarV;n f-J. 14.)6G Al he he taceGi wA fs5)6 is-s 10 - 630 CITY 9ff-0- WA STAT NTRACTOR'S LICENSE A EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE! Noia71-1 P6ir96,LP 6 rI- X205 NAME PRIMARY PHONE 1Jof+l'ern ?aufic. Eno-eriors fsg-Er-& i - ((lit APPLICANT MAILING ADDRESS a©ri - {Tn orS.COM, !(-12-0M arv:r g-4 NE car I p CITY'Laceil STATE ZIP Fair- a-10 -1-630 PRIMARY PHONE PROJECT CONTACT NAME Michelle 41 I f 9 cK Sirce5--161 - 1(-US MAILING ADDRESS E-MAIL (-12-0 M' rvi ri lzd. A/C .3 f ,,n;c he)tha n P he individual to receive and -fit zn ar'" respond to ail correspondence 1 concerning this application) CITY STATE ZIP FAX Lacey WA' eN-St 6, -2.1 O =1430 NAME 1 I /J OWNER-FINANCED PROJECT FINANCING N Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge,the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit.I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim),which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliapce of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a paof 7777131 on. (C72 7 27/J 4d0j '_~! $IGNATLR) �0 � / �`�J- DATE PRINT NAME: 16'l•l L/4y'. U I c t"i t r-'C Jrc�.k 6 Bulletin#100-January 1,2013 Page 1 of 3 k:\Handouts\Permit Application Ouilding Single Family City & Federal Way Permit #: 14-103'149-00-S F Community & Econ..Dev. Services 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: 253 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 p q s- Project Name: TAVARES rILE Project Address: 139 S 361ST PL Parcel Number: 113780 0340 Project Description: REP - Tear off shake roofing; install plywood sheathing, synthetic underlayment and Certainteed Landmark Pro shingle roofing system. Owner ApRlican Contractor Lender DAVID TAVARES NORTHERN PACIFIC EXTERIORS NORTHERN PACIFIC EXTERIORS VICKI TAVARES 1420 MARVIN RD NE UNIT C311 NORTBPE896LP (6/17/15) 139 S 361 ST PL LACEY WA 98516 1420 MARVIN RD NE UNIT C311 FEDERAL WAY WA 98003-8621 LACEY WA 98516 Census Category: 555 - Non-structural roofing permits Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load- Floor oadFloor Areas . ft. 0 1 0 1 0 0 New / Additional Sq. Feet - 3rd Floor....................0 Mechanical to be Included?...................................No New / Additional Sq. Feet - Basement...................0 Plumbing to be Included?......................................No PERMIT EXPIRES Wednesday, December 24, 2014 Permit Issued on Friday, June 27, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: e � �Date: 6 1:1NALED CITY OF Federal Way PERMIT #: 14 -103149 -00 -SF Project: DAVID TAVARES THIS CARD IS TO MAIN ON-SITE Construction In ection Record INSPECTION REQUE TS: (253) 835-3050 Address: 139 S 361ST PL FEDERAL WAY, WA 98003-8621 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ SWM Precon Site Mtg (4400) Initial Erosion Control (4365) Final Electrical Approved Underfloor Framing (4285) Approved By To be done prior to breaking ground Approved to sheath floor By Date By Date By Date 0 Floor Sheathing (4105) Shear Walls (4245) Approved to install flooring Approved to install siding By Date By Date By Fire/Draft Stops (4095) Approved By Date Framing (4120) Approved to insulate By Date 11 Interim Erosion Control (4370) Approved By Date Insulation (4150) Approved to install wallboard By Date 11 Final Erosion Control (4375) 0 Final - Building (4050) Approved Approved By Date By Vy� Date -1 1,; Approved to install roofing Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved IBC 109.3.4 0 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date