Loading...
15-105562 uildin - cn,inmercial City of Federal Way Community&Econ.Dev.Services Permit #: 1 5-105562-00-CO 33325 8th Ave S Federal Way,WA 98003 Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253) 835-3050 Project Name: DONALD B MURPHY CONTRACTORS Project Address: 1200 S 356TH ST Parcel Number: 292104 9002 Project Description: ADD-Construction of a new retaining wall and fence. Owner Applicant Contractor Lender DONALD B CONTRACTORS NAVEEN CHANDRA DONALD B MURPHY OWNER IS LENDER 1220 S 356TH CITY OF FEDERAL WAY CONTRACTORS INC FEDERAL WAY WA PO BOX 9718 DONALI*33IRQ(10/1/16) 98003 FEDERAL WAY WA 98063-9718 1220 S 356TH ST FEDERAL WAY WA 98003-7468 Census Category: 437 - Commercial alt/add/conversion Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area(sq. ft.) 0 0 0 0 Additional Permit Information Mechanical to be Included9 No Number of Stories 1 Permit for Building Shell Only9 No Plumbing to be Included? No New/Additional Sq.Feet-Total 0 No Fixtures Associated With This Permit !! CONDITIONS: 1.Wall height shall not exceed 6-feet. 2. Wall facing shall be timber rather than shotcrete. 1N111/4k°) PERMIT EXPIRES Satur ay, May 14, 2016 Permit Issued on Monday, November 16, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: — _... Date: 77//' 1//-1 Ti,I s f EGT©cj i &-&-r y f et fi d am d f!61-c d - h Pt (,c, 1(4Cuir.u.41— CQ, -I-vt wk(Jc del(' n . sty Ast?-fac4eci CAt;t4 6 At4.1aAd-1 • THIS CARD IS TO AIN ON-SITE edera W ay - Construction In ection Record INSPECTION REQUE TS: (253) 835-3050 PERMIT##: 15-105562-00-CO Address: 1200 S 356TH ST Project: DONALD B CONTRACTORS FEDERAL WAY, WA 98003-7478 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Initial Erosion Control(4365) 0 Footings/Setback(4110) Foundation Wall(4115) To be done prior to breaking ground Approved to place concrete Approved to place concrete By Date By Date By Date 0 Drainage/Downspout(4040) Re-steel (4215) �0 Slab/Concrete Floor(4255) Approved to backfill Approved to place concrete or grout Approved to place concrete By Date By Date By Date 0 Underfloor Framing(4285) `El Floor Sheathing(4105) ® Shear Walls(4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date L�rARoof Sheathing(4220) ❑ Fire/Draft Stops(4095) ❑ Interim Erosion Control(4370) Approved to install roofing pproved Approved By Dater ate By Date By Date LPrior to scheduling a Framing inspection; ® Framing(4120) ® Insulation (4150) Electrical,Plumbing&Mechanical Rough-in and Approved to insulate Approved to install wallboard Fire/Draft Stop inspections must be signed-off and approved. IBC 1093.4 By Date By Date .- E./Gypsum Wallboard Nailing(4130) 0 Suspended Ceiling Grid (4265) Final-s K F & R(4060) Approved to install mud&tape Approved to drop tile Approved By Date By Date By Date P......_ riFinal-Planning 0 Final-Public Works(4080) DFiErosion Control (4375) Approved Approved Approved By Date By Date By Date 7--7-711-757—Bu . Eitl,x6 - Building(4050) Approved By Date 1 � 1,a � 1L ® Rough Electrical _�_-_yM -FinalElectrical Right of Way �~ Approved ---irApproved 0Approved By Date I3� Dateia�� Date 1 �ECFA. r�rP ri • CITY OF NOV 02 2015 PERMIT APPLICATION Federal Way Cm,OF FEDE CDS RAI,WAY PERMIT NUMBER ) 5 _ 1. b 5 5 (L/ Z C 0 - TARGET DATE SITE ADDRESS SUITE/UNIT# I2 9--o CS = 6 I-tn CT ) /- r.j wt, lv — -10D_ PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL N' ` $ 3 2,, S 0 v C' 2.- t 0 - 9 u (;)TYPE OF PERMIT BUILDING 0 PLUMBING 0 MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT /mat(ka /Y/ tvp r S PROJECT DESCRIPTION (-,_,„"ir„Glh©J'1 of Q-e 1 (-) IA All H 1--C YVC& Detailed description of work to be included on this permit only NAME 1 PRIMARY PHONE PROPERTY OWNER Ct�vl�Qr }-C)v G f 7 - _ /1I I22 ,� c(� RI STt. E-MAILMAILING ADDRESS (>/ U " C.ote-c `A) STATE_ ZIPg�y j� /�^,��/1'�fJ-�' � �jy'��w'�I.1/C1T_ /lS i`��: N D E i Cb `(YaL4JY U' C - _ PHONE MAILNG ADDRESS /' /� Sr41J._/\/� E-MAIL CONTRACTOR l 2L,f�,A�I S .C(' � r I S 1 (�— �/ CSS .i T- (.4) -7O ©O ->TY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# 00N VLi.* y,l 0-& 10i of / i A NAME _ PRIMARY PHONE _.... GI TMAILING�DRESSO R.FofF2� Lit k ,)C-3 -x-3(-21 Z� APPLICANT 2�5— I f n��L/� SQ U,�/ E-MAIL STY"�J j�t 4') ANe_ -1 ZIP r I/1 FAX ne_Cilira 1? W C}-I int/ aft-00 NAME PRIMARY PHONE PROJECT CONTACT ,tk1c'_1?JYI0Y12a),(--,--- (The individual to receive and MAILING ADDRESS E-MAIL respond to all correspondence 32S Itil, 4/t'At concerning this application) n A �� STATE ZIPeroo? FAX NAME 1/` (? PROJECT FINANCING IR OWNER-FINANCED Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.1 certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses, and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied tothe cit of this application. 4111 SIGNATURE: DATE ///Z7/ PRINT NAME: i1 LA ci Cy Bulletin#100—January 1,2013 Page 1 of 3 k:AHandouts\Permit Application i • • t VALUE OF MEC NICAL WORK MECHANICAL PERMIT $ Indicate how many of each type offvcture to be installed or relocated as part of this project. Do not include exis .fixtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(Conrnerciaq BOILERS FURNACES HOT WATER TANKS)Gan) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES - VALUE OF PLUMBING WORK PLUMBING PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project. I. not include existing fixtures to remain. BATHTUBS(or Tub/Shower Combo) LAVS(Hand Sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM :'EAKERS DRINKING FOUNTAINS SINKS(Kitchen/Utility) WATER ,EATERS(Electric) HOSE BIBBS SUMPS WASH G MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS $ EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FI-• SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? 3'1 '95-- a Yes NoYes No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PR• ••SED TOTAL FOR OFFICE USE BASEMENT FIRST FLOOR(or Mobile Home) SECOND FLOOR \‘: COVERED ENTRY '\...,.., DECK GARAGE ❑ CARPORT ❑ OTHER(describe) / EXISTING PROPOS® TOTAL Area Totals **NEW MES ONLY** ESTIMATED SELLING PRICE$ It OF BEDROOMS COMMERCIAL—NEW/ DITION AREA DESCRIPTION Area Occupancy Group(s) Construction # of Additional Information In Square FeetType Stories NEW BUILDING ADDITION COMMERCIA REMODE I,/TENANT IMPROVEMENTS AREA DESC ION Area Occupancy Group(s) Construction # of Additional Information in Square Feet Type Stories TOTAL BUILDI TEIKANT AREA ONLY PROJECT AREA ONLY Bulletin#100-January 1,2013 Page 2 of 3 k:\Handouts\Permit Application , IKPG FE2502 Jefferson Avenue Tacoma, WA 98402 P: 253.627.0720 F: 253.627.4144 www.kpg.com January 15,2016 / S- /0.-'S'C; Z Scott Sproul RESUBMITTED Building Official City of Federal Way,Building Division 33325 8th Ave S JAN 14 2016 Federal Way,WA 98003-6325 CITY OF FEDERAL WAY CDS Scott, KPG was directed to inspect for pile location,augured hole diameter,and depth to tip from bottom of lagging as well as verification of lean cement concrete mixed design. KPG performed the above listed task as directed. The pile spacing and locations were constructed per design plan with the following exceptions: • Location of piles 51,52,and 53 were shifted(horizontally)approximately.05 feet adjusting the span to 6.5 feet to avoid an obstruction under the field direction of Paul Groneck,the Design Engineer,who prepared the approved wall design and design revision as noted below. ** Soldier Pile Schedule** Pile Elevations (ft) As Built Pile#'s # Pile Hole Dia. Top B.O. Tip B.O. Pile ea Size (Inch) Lagging Lagging to Spacing ch Tip 1-12 12 8 x 24 24 251 244 237 9.5 Per Plan 13-21 9 8 x 24 24 251.5 244.5 237.5 9.5 Per Plan 22-28 7 8 x 24 24 252.5 244.5 237.5 9/13 Per Plan 29-33 5 8 x 24 24 253.5 244.5 236.5 9/13 Per Plan 34-38 5 8 x 24 24 254.5 244.5 236.5 9/13 Per Plan 39-41 3 8 x 24 24 255.5 244.5 235.5 9/13 Per Plan 42-43 2 8 x 28 24 255.5 244.5 233.5 13.2/14.5 Per Plan 44-48 5 8 x 28 24 256.5 244.5 233.5 13.2/14.5 Per Plan 49 1 8 x 28 24 257.5 244.5 233.5 13.2/14.5 Per Plan 50-54 5 8 x 35 24 257.5 244.5 232.5 13.2/14.5 *6.5 *Pile spacing adjusted per design engineer. See attachment If you have any further questions please do not hesitate to contact me. rw A Thank you, i:7� Ken Gunther, P.E. , �ssi. Resident En: eer �' 41Jj :may`.' 11•10 ,r0A, ., 4 .;, , ,Y1 to ,31219 Street Address•Address 2•Phone:555.555.0125•E A \SN4 1 9 1c. (111) _i1)4 . _ W Za t [---1- ufl 7 Z � ' ! - CC {ham 1 Akio I n i � � �'h rte„ 'S,\ z ;-""4 m n 1" 1 c) rn . . . . • 1Y�, � 3 �.. 6 •. m m . (. . 11 f 4 1,---4 Nik It lit r G> m KPG Inspector's Daily Report SEATTLE•TACOMA IDR Sheet 1 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Tuesday December 29,2015 Prime Contractor Representative/Title A. DBM Contractors John Joslin/Foreman Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. C. D. E. A.M. P.M. Weather: Fog Part.Cloudy Site Conditions: Dry Temperature: Low: 36 t°F High: 45 ±°F Contractor's Work Activity Description and Location Setting piles for property owner isntalled wall between Sta.90+10 and 93+50 RT. Required Backup Samples Taken Item, Description,and Location of Work Matte Documentation Approved (NOTE:Any NO is to be explained In Diary) Mat'i Source Approved Pay Note Made Item No. Contract Item Description Location YM Y/N Y/N Y/N • Traffic Control Was Traffic Control Required Today? Yes X No Was WZTC according to approved TCP? Yes No Was TCS on Project Site Today? Yes X No Do all Flaggers have current flagging card? Yes No DIARY Photos taken Today? X Yes NO i (Signed) NAME:David Meisenheimer,Construction Inspector Reviewed By KPG SEATTLE•TACOMA Inspector's Daily Report (CONTRACTORS EQUIPMENT&WORKFORCE) IDR Sheet 2 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Tuesday December 29,2015 Prime Contractor Subcontractor DBM Contractors CONTRACTOR'S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No.of Equip No. Equipment Description Oper Stdby Down Idle REMARKS 6-24 Hitachi EX300 Excavator w/Lodril X Ford F250 Pickup Truck X 7-15 John Deere 544.1 Loader X 7-24 CAT 904B Loader X CAT 315L Excavator X CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborenl Pipe Layr Oper Drivers Flaggers Electrician Other Male Female Apprentice Trainee A 3 1 2 / / / 1 / 6 B / / / / / / / / C / / / / / / / / D / / / / / / / / E / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / ( igned) NAME: David Meisenheimer,Construction Inspector KPG SEATTLE•TACOMA Inspector's Daily Report (DIARY-continued) IDR Sheet 3 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Tuesday December 29,2015 Prime Contractor DBM Contractors DIARY -continued 7:30 AM: I arrived onsite,DBM drilling at pile#41. Crew prepping for placement of piles 46 through 43. 10:00 AM: Placed steel girder for bracing piles at locations 46 through 43. Drilling continued while crews set piles 46 through 43. 10:20 AM: Finished drilling at pile#33,crews prepared to set piles 41 through 33. 10:40 AM: DBMbegan placing piles 41 through 33,toes were placed in each hole prior to setting pile. 11:30 AM: Drilling continued for pile 23. 12::45 PM: Finished drilling up to pile#25,placed girder to set piles 31 through 25. 1:10 PM: Began placing toes for piles 31 through 25 and setting piles. 2:15 PM: All piles set,backfilled holes with lean concrete(Mix Design#S4200A). 2:25 PM: Bolt broke on swivel of Lodril,work halted to repair Lodril 2:50 PM: Lodril repaired continued drilling piles 22 and 23. Ground conditions changed at this location,existing dirt similar to dirt found at piles 54 through 24,soil contains round rock after these locations. Round rock in various sizes removed throughout drilling. 3:05 PM: Completed drilling piles 22 and 23,began placing toes to set piles. 4:00 PM: Piles 22 and 23 set,crew began site cleanup. I departed site Pile Depth Pile Size 42 13 22 41 13 20 40 13 20 39 12 19.5 38 12 19.5 37 10.6 18 36 10 18 35 11 17.5 34 10.5 17.5 33 10.5 17.5 32 10.5 17 31 10.5 17 30 10.5 17 29 10.3 16.5 28 10 15 27 9.5 15 26 9 15 25 9.5 15 24 10 15 23 9 14.5 22 9.5 14.5 • ( gned) NAME: �vid Meisenheimer,Construction Inspector Kph' Inspector's Daily Report SEATTLE •TACOMA (DIARY-continued) IDR Sheet 4 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Tuesday December 29,2015 Prime Contractor DBM Contractors DIARY-photos n �• r .rte ...� E `¢I*$'e. T, 4,t f• y '� oc- ISteel I-beams for wall piles Steel 1-beams held in place during Steel 1-beams held in place during concrete placement concrete placement • s,. Existing soil conditions change at pile 22 r amilMmo ( gned) NAME:David Meisenheimer,Construction Inspector KPG Inspector's Daily Report SEATTLE•TACOMA IDR Sheet 1 of 4 Sheets Project No. Project Name Dav Date RFB#15-015 South 352nd ST Extension Wednesday December 30,2015 Prime Contractor Representative/Title A. DBM Contractors John Joslin/Foreman Subcontractor or Agent App?d D/M/WBE Representative/Title B. C. D. E. A.M. P.M. Weather: Fog Part.Cloudy Site Conditions: Frozen Temperature: Low: 29 m°F High: 42 2°F Contractor's Work Activity Description and Location Setting piles for property owner isntalled wall between Sta.90+1O and 93+50 RT. Required Backup Samples Taken Item, Description,and Location of Work Mans Documentation Approved (NOTE:Any"NO'is to be explained in Diary) Mat'I Source Approved Pay Nota Made Item No. Contract Item Description Location Y/N Y/N YM Y/N • • • • • • • • • • Traffic Control Was Traffic Control Required Today? Yes X No Was WZTC according to approved TCP? Yes No Was TCS on Project Site Today? Yes X No Do all Flaggers have current flagging card? Yes No DIARY Photos taken Today? X Yes No (Si ed) NAME Davi Meisenheimer,Construction Inspector Reviewed By ,. . . KPG SEATTLE•TACOMA Inspector's Daily Report (CONTRACTORS EQUIPMENT&WORKFORCE) IDR Sheet 2 of 4 Sheets Project No. Project Name Day Date RFB4f15-015 South 352nd ST Extension Wednesday December 30,2015 Prime Contractor Subcontractor DBM Contractors CONTRACTOR' S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No.of Equip No. Equipment Description Oper Stdby Down Idle REMARKS 6-24 Hitachi EX300 Excavator w/Lodril X Ford F250 Pickup Truck X 7-15 John Deere 544J Loader X 7-24 CAT 904B Loader X CAT 315L Excavator X CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER!HOURS NUMBER Laborers Pipe Layr Oper Drivers Riggers Electrician Other Mel. Female Apprentice Trainee A 3 / 2 J / / 1 / 6 B / / / / / / / I C / / / / / / / / D / / / 1 / / / / _ E / / / / / / / / / / / / / / / / . / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / . / / / / / / / / / / / / / / / / . may. ( igne NAa ME: David Meisenheimer,Construction Inspector • "'CPG SEATTLE •TACOMA Inspector's Daily Report (DIARY-continued) IDR Sheet 3 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Wednesday December 30,2015 Prime Contractor DBM Contractors DIARY -continued 7:30 AM: I arrived onsite,DBM drilling pile#52,to continue drilling 53,51 and 54. 8:00 AM: Stopped drilling at pile#53,pea gravel from ditch line collapsing hole,DBM to case the hole to continue drilling. Obstruction cleared exposing existing 12 inch concrete pipe. Concrete pipe damaged from previous drilling. Top of pipe at 5 foot depth from existing grade. John (Foreman)intends to repair the pipe prior to backfilling. Repair will be done after piles have been set. 8:50 AM: Set casings for piles#53 to continue drilling. 9:45 AM: Completed drilling of pile#53,set casing and commenced with drilling for pile#52. 11:00 AM: DBM placed casing over existing storm pipe and backfilled around casings to begin placing piles 53 and 52. 12:00 PM: Set girder and prepared to place piles 52 and 53. 12:30 PM: Began placing lean concrete(Mix design#S4200A)toes for piles 52 and 53. Piles set,concrete placement to be completed tomorrow to allow the toes to set to remove the casings. 2:00 PM: Began drilling piles#1 through 3 and prepared to begin digging between piles in preperation for placement of lagging. 2:45 PM: Completed drilling Pile#3,crew began site cleanup. 3:00 PM: I departed site. Pile Depth Pile Size 54 15 25.5 53 14 25.5 52 14 25.5 51 15 25 1 10 14 Not placed 2 9.8 14 Not placed 3 10.2 14 Not placed ( gned) NAME: David Meisenheimer,Construction Inspector M.P.G. Inspector's Daily Report SEATTLE • TACOMA (DIARY-continued) IDR Sheet 4 of 4 Sheets Protect No. Protect Name Day Date RFB#15-015 South 352nd ST Extension Wednesday December 30,2015 Prime Contractor DBM Contractors DIARY -photos . 4114 ' ' .. . .•. :` •. ':'. . t I.. Existing drain pipe damaged during Casing around existing storm pipe for pile Existing soil conditions at pile 12 driliin. placement ,,,, ,,,,, 1.....2____„..... ...::_- _ (Signed) NAME: David Meisenheimer,Construction Inspector a KPG Inspector's Daily Report SEATTLE•TACOMA IDR Sheet 1 of 4 Sheets Project No. Prosect Name Day Date RFB#15-015 South 352nd ST Extension Thursday December 31,2015 Prime Contractor Representative/Title A. DBM Contractors John Joslin/Foreman Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. C. D. E. A.M. P.M. Weather: Clear Clear Site Conditions: Frozen Temperature: Low: 29 ±°F High: 42 ±°F Contractor's Work Activity Description and Location Setting piles for property owner isntalled wall between Sta.90+10 and 93+50 RT. Required Backup Samples Taken Item, Description,and Location of Work Maris Documentation Approved (NOTE:Any"NO"is to be explained in Diary) Nat'l Source Approved Pay Note Made 1 Item No. Contract Item Description Location Y/N Y/N Y/N Y/N • • • Traffic Control Was Traffic Control Required Today'? Yes X No Was WZTC according to approved TCP? Yes No Was TCS on Project Site Today? Yes X No Do all Flaggers have current flagging card? Yes No DIARY Photos taken Today? X Yes No ie. ( I d) NAME DaV1d ) senheiimeer,,Construction Inspector Reviewed By KPG SEATTLE'TACOMA Inspector's Daily Report (CONTRACTOR'S EQUIPMENT&WORKFORCE) IDR Sheet 2 of 4 Sheets Prolect No. Prosect Name Day Date RFB#15-015 South 352nd ST Extension Thursday December 31,2015 Prime Contractor Subcontractor DBM Contractors CONTRACTOR'S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No.of Equip No. Equipment Description Oper Stdby Down Idle REMARKS 6-24 Hitachi EX300 Excavator w/Lodril X Ford F250 Pickup Truck X 7-15 John Deere 544J Loader X 7-24 CAT 904B Loader X CAT 315L Excavator X CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborers) Pipe Layr Oper Drivers Flaggers Electrician Other Male Female Apprentice Trainee A 3 / 2 / / / 1 / 6 B / / / / / / / / C / / / / / / / / D / / / / / / / / . E / / / / / / / _ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / • / / / / / / / / / / / / / / / / / / / / / / / / ( NAME:David Meisenheimer,Construction Inspector • I FG SEATTLE•TACOMA Inspector's Daily Report (DIARY-continued) IDR Sheet 3 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Thursday December 31,2015 Prime Contractor DBM Contractors DIARY -continued 7:30 AM: I arrived onsite,DBM drilling pile#5. 8:00 AM: Began drilling pile#6. 9:00 AM: Finished drilling pile#6,began drilling pile#19. Crew setting girder for piles 1-6 to be placed. 9:30 AM: Mix arrived onsite(Mix design#S4200A),topped off piles 52 and 53,casings removed. 10:15 AM: Set toe for pile 19 and placed pile. 10:40 AM: DBM set toes for piles 1 through 6 and began setting piles 1 through 6. 12:30 PM: Piles I through 6 set,began site cleanup. 1:00 PM: I departed site. Pile Depth Pile Size 4 9.5 14 5 9.5 14 6 10 14 19 10.5 14.5 (Signed) NAME: David Meisenheimer,Construction Inspector K.pGr' Inspector's Daily Report SEATTLE •TACOMA (DIARY-continued) IDR Sheet 4 of 4 Sheets Prosect No. Protect Name Day Date RFB#15-015 South 352nd ST Extension Thursday December 31,2015 Prime Contractor DBM Contractors DIARY -photos � .-•' `rr .i 'ire }I', *`z+ " '. "�t� r•s ! 'fi *'' _L E 1 1 ii +, ITN cit;. 'f ;f7'.l ,1 f F ^y* 4, i f — I 1 Drilling pile#19 Placing pile#2 Placing lean concrete around pile#1 (Signed) NAME: David Meisenheimer,Construction Inspector • KPG Inspector's Daily Report SEATTLE•TACOMA IDR Sheet 1 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Monday January 4,2016 Prime Contractor Representative/Title A. DBM Contractors John Joslin/Foreman Subcontractor or Agent Appr'd D/MIWBE Representative/Title B. C. D. E. A.M. P.M. Weather: Showers Showers Site Conditions: Frozen Temperature: Low: 34 ±°F High: 38 t°F Contractor's Work Activity Description and Location Setting piles for property owner isntalled wall between Sta.90+10 and 93+50 RT. Required Backup Samples Taken Item, Description,and Location of Work Marie Documentation Approved (NOTE:Any"NO"is to be explained in Diary) Mat'I Source Approved Pay Note Made Item No. Contract Item Description Location Y/N Y/N Y/N Y/N • • Traffic Control Was Traffic Control Required Today? Yes X No Was WZTC according to approved TCP? Yes No Was TCS on Project Site Today? Yes X No Do all Flaggers have current flagging card? Yes No DIARY Photos taken Today? X Yes No.=.01 (Signed) NAME David Meisenheimer,Construction Inspector Reviewed By . . KPG SEATTLE•TACOMA Inspector's Daily Report (CONTRACTORS EQUIPMENT&WORKFORCE) IDR Sheet 2 of 4 Sheets Prosect No. Protect Name Day Date RFB#15-015 South 352nd ST Extension Monday January 4,2016 Prime Contractor Subcontractor DBM Contractors CONTRACTOR' S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No.of Equip No. Equipment Description Oper Stdby Down Idle REMARKS 6-24 Hitachi EX300 Excavator w/Lodril X Ford F250 Picker Truck X 7-15 John Deere 544J Loader X 7-24 CAT 904B Loader X CAT 315L Excavator X CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborers I Pipe Layr Oper Drivers Flaggers Electrician Other Male Female Apprentice Trainee A 3 / 2 / / / 1 / 6 s / / / / / / / / c / I / / / / / / D / / / / / / / / E / / / / / / / / / / / / / / / / • / / / _ / _ / / / / • / / / / / / / / / / / / / / / / / / / / _ / / / / / 1 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 1 41 ) • I (Signed) NAME: David eisenheimer,Construction Inspector • KPC SEATTLE•TACOMA Inspector's Daily Report (DIARY-continued) IDR Sheet 3 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Monday January 4,2016 Prime Contractor DBM Contractors DIARY -continued 7:30 AM: I arrived onsite,DBM continued drilling piles 20 through 21. 8:00 AM: Began laying out piles 7 through 11. 8:30 AM:DBM began drilling piles 7 through 11 starting with pile#7. 9:10 AM: DBM began loading dirt into truck and trailer and hauling offsite. This would continue throughout the day. 10:15 AM: Mix onsite(Mix design#S4200A) began setting piles 20 and 21. 11:00 AM: DBM cleaning out damaged storm pipe,prepping for repair. Pipe to be chipped around damage for concrete to bond to. Wire mesh placed over the damaged areas with red line concrete placed over the top for repair. Began drilling for piles 18 through 14. 1:00 PM: Repair of concrete pipe finished,removed casing and backfilled over the pipe with native material. 1:30 PM: Crew began placing lagging between piles 50 through 40. Drilling crew began setting piles 18 through 14. 3:00 PM: Finished placing piles 18 through 14 and lagging for the day. DBM began site cleanup. I departed site. Pile Depth Pile Size 20 9.5 14.5 21 9.5 14.5 7 9.5 14 8 9.5 14 9 9.5 14 10 9.5 14 11 9.5 14 14 9.5 14 15 9.5 14 16 9.5 14 17 9.5 14 18 9.5 14 e....,,,„4... .. _______ (Signed) (Signed) NAME:David Meisenheimer,Construction Inspector IK.PGm Inspector's Daily Report SEATTLE •TACOMA (DIARY-continued) IDR Sheet 4 of 4 Sheets Project No. Project Name Day ' Date RFB#15-015 South 352nd ST Extension Monday January 4,2016 Prime Contractor DBM Contractors DIARY -photos ♦ f r, i f r Placing lean cement concrete cleaned out existing concrete storm pipe Patched storm pipe with wire mesh and for patch red line concrete I �i i 1, A. I Placing steel piles (Signed) NAME: David Meisenheimer,Construction Inspector KPG Inspector's Daily Report SEATTLE•TACOMA IDR Sheet 1 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Monday December 28,2015 Prime Contractor Representative/Title A. DBM Contractors John Joslin/Foreman Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. C. D. E. A.M. P.M. Weather: Overcast Showers Site Conditions: Muddy Temperature: Low: 35 s°F High: 4l s°F Contractor's Work Activity Description and Location Setting piles for property owner isntalled wall between Sta.90+10 and 93+50 RT. Required Backup Samples Taken Item, Description,and Location of Work Mans Documentation Approved (NOTE.Any"NO"is to be explained in Diary) Man Source Approved Pay Note Made Item No. Contract Item Description Location YIN Y/N Y/N Y/N • Traffic Control Was Traffic Control Required Today? Yes X No Was WZTC according to approved TCP? Yes No Was TCS on Project Site Today? Yes X No Do all Flaggers have current flagging card? Yes No DIARY Photos taken Today? X Yes No (Signed) NAME David Nteisenheimer,Construction Inspector Reviewed By • KPG SEATTLE•TACOMA Inspector's Daily Report (CONTRACTORS EQUIPMENT&WORKFORCE) 1DR Sheet 2 of 4 Sheets Protect No. Project Name Day Date RFB#15-015 South 352nd ST Extension Monday December 28,2015 Prime Contractor Subcontractor DBM Contractors CONTRACTOR'S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No.of Equip No. Equipment Description Oper Stdby Down Idle REMARKS 6-24 Hitachi EX300 Excavator w/Lodril X X Ford F250 Pickup Truck X 7-15 John Deere 544J Loader X 7-24 CAT 904B Loader X CAT 315L Excavator X CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborers) Pipe Layr Open Drivers Flaggers Electrician Other Male Female Apprentice Trainee A 3 / 2 / / / 1 / 6 B / / / / / / / / C / / / / / / / / D / / / / / / / / E / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / (Signed) NAME: David Meisenheimer,Construction Inspector • KPG SEATTLE'TACOMA Inspector's Daily Report (DIARY-continued) IDR Sheet 3 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Monday December 28,2015 Prime Contractor DBM Contractors DIARY -continued 7:30 AM: I arrived onsite,DBM began drilling for piling#54. I discussed the work being conducted with John Josling(Foreman). John aware that staking is set to face of piling and not to center of piling,drilling continued. Existing soil is a silty sand material. 9:00 AM: Obstruction found while drilling pile#53,obstruction not visible. Location of pile is in line with existing concrete storm line from manhole to the north of wall location. DBM elected to stop drilling#53,continue drilling at pile#50. 10:25 AM: Mix arrived onsite. Mix Design#S4200A from Corliss. 10:56 AM: DBM filled holes for piles 53 and 54 with lean concrete(Mix Design#S4200A). Paul Groneck(DBM Structual Engineer)onsite determining issues with pile locations. A design change will be made to move piles around existing concrete storm line. 11:20 AM: Set pile#51. 11:40 AM: Pile set to wrong height and angled towards roadway. DBM to remove pile and auger out the cement to reset. 11:45 AM: Lodril down,plate holding the cylinder broke off. Crew took lunch at this time. 12:30 AM: Lodril operational,continued drilling at pile#49 through 47. 1:00 PM: DBM began setting piles 47-50. 2:00 PM: Continued drilling for piles 43-46. Throughout day observed no ground water in any of the holes drilled. 3:07 PM: Completed drilling for the day,began site cleanup. 3:30 PM: Crew and I departed site. Pile Depth Pile Size 54 14' 25.5 Not placed 53 N/A 25.5 Obstruction stopped drilling 52 14.5 25.5 Not placed 51 14.5 25 Pile to be reset 50 14 25 49 13.5 23.5 48 13.5 23.5 47 13.5 23 46 13.4 23 45 13.2 23 44 13.6 22.5 43 13.5 22.5 ( ned) NAME: David etre eimer,�onstructtvn trmpeeteF= • • KPG Inspector's Daily Report SEATTLE •TACOMA (DIARY-continued) IDR Sheet 4 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Monday December 28,2015 Prime Contractor DBM Contractors DIARY-photos • ten. • -h N. Drilling holes for pile placement Setting support beam to pin piles against Setting piles (Signed) NAME: David Meisenheimer, Construction Inspector KPG Inspector's Daily Report SEATTLE•TACOMA IDR Sheet 1 of 4 Sheets Project No. Protect Name Dav Date RFB#15-015 South 352nd ST Extension Tuesday January 5,2016 Prime Contractor Representative/Title A. DBM Contractors John Joslin/Foreman Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. C. D. E. A.M. P.M. Weather: Rain Rain Site Conditions: Muddy Temperature: Low: 36 i F High: 46 t°F Contractor's Work Activity Descnption and Location Setting piles for property owner isntalled wall between Sta.90+10 and 93+50 RT. Required Backup Samples Taken Item, Description,and Location of Work Mans Documentation Approved (NOTE:Any"NO"is to be explained in Diary) Mat'I Source Approved Pay Note Made Item No. Contract Item Description Location Y/N Y/N Y/N Y/N • Traffic Control Was Traffic Control Required Today? Yes X No Was WZTC according to approved TCP? Yes No Was TCS on Project Site Today? Yes X No Do all Flaggers have current flagging card? Yes No DIARY Photos taken Today? X Yes (Signed) NAMEDavid Meisenheimer,Construction Inspector Reviewed By KPG SEATTLE •TACOMA Inspector's Daily Report (CONTRACTOR'S EQUIPMENT&WORKFORCE) IDR Sheet 2 of 4 Sheets Project No. Project Name Day Date RF11415-015 South 352nd ST Extension Tuesday January 5,2016 Prime Contractor Subcontractor DBM Contractors CONTRACTOR' S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No.of Equip No. Equipment Description Oper Stdby Down Idle REMARKS 6-24 Hitachi EX300 Excavator w/Lodril X Ford F250 Pickup Truck X 7-15 John Deere 544J Loader X 7-24 CAT 904B Loader X CAT 315L Excavator X CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER/HOURS NUMBER Laborers I Pips l.ayr Oper Drivers Fleggers Electrician Other Male Female Apprentice Trainee A 3 / 2 / / / 1 / 6 B / / / / / / / / C / / / / / / / / D / / / / / / / / E / / / / / / / / / / / / / v / / / / v / / v / / / / / • / / / / / / / I / / / / / / / / / / / v / / / / v / / / v / / / / / / • / / / v / / / v / / / / v / / / v / / / / / / / / / / / ` ...-. (Signe— d) NAME: David Meisenheimer,Construction Inspector • MPG SEATTLE•TACOMA Inspector's Daily Report (DIARY-continued) IDR Sheet 3 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Tuesday January 5,2016 Prime Contractor DBM Contractors DIARY -continued 7:30 AM: I arried onsite,DBM drilling for piles 12 and 13. Crew continued lagging between piles 40 and 21. Lagging to continue throughout the day. 9:00 AM: Crew preparing for placement of piles 12 and 13. Setting girders for bracing. Lagging continued,crew placing lagging to finish grade height for new roadway,6 feet below top of pile. 10:00 AM: DBM began placing piles 12 and 13,concrete onsite(Mix design#S4200A) 11:30 AM: Finished placing piles 12 and 13. 3:00 PM: Crew finished lagging for the day up to pile#21. Began site cleanup,I departed site. Pile Depth Pile Size 12 9.5 14 13 9.5 14 (Signed) NAME: David Meisenheimer,Construction Inspector 1‹.1::°C4' Inspector's Daily Report SEATTLE •TACOMA (DIARY-continued) IDR Sheet 4 of 4 Sheets Project No. Project Name Day Date RFB4#15-015 South 352nd ST Extension Tuesday January 5,2016 Prime Contractor DBM Contractors DIARY-photos 16 • / { • , t , MOON 010 kit Placing piles Placing lagging (Signed) NAME: David Meisenheimer, Construction Inspector KPG Inspector's Daily Report SEATTLE•TACOMA IDR Sheet 1 of 4 Sheets Project No. Project Name Day Date RFB#15-015 South 352nd ST Extension Wednesday January 6,2016 Prime Contractor Representative/Title A. DBM Contractors John Joslin/Foreman Subcontractor or Agent Appr'd D/M/WBE Representative/Title B. C. D. E. A.M. P.M. Weather: Part.Cloudy Part.Cloudy Site Conditions: Muddy Temperature: Low: 37 ±°F High: 53 2°F Contractor's Work Activity Description and Location Placing lagging piles 21 through 1. Required Backup Samples Taken Item, Description,and Location of Work Marla Documentation Approved (NOTE:Any"NO"is to be explained in Diary) Mat'I Source Approved Pay Note Made Item No. Contract Item Description Location Y/N YIN Y/N Y/N • • • Traffic Control Was Traffic Control Required Today? Yea X No Was WZTC according to approved TCP? Yes No Was TCS on Project Site Today? Yes X No Do all Flaggers have current flagging card? Yes No DIARY Photos taken Today? X Yes No� (Signed) NAME:David Meisenheimer,Construction Inspector Reviewed By • IPG SEATTLE •TACOMA Inspector's Daily Report (CONTRACTOR'S EQUIPMENT&WORKFORCE) IDR Sheet 2 of 4 Sheets Prosect No. Project Name Day Date RFB015-015 South 352nd ST Extension Wednesday January 6,2016 Prime Contractor Subcontractor DBM Contractors CONTRACTOR'S EQUIPMENT Operating Contractor's ID(A-E,see page 1) No.of Equip No. Equipment Description Oper Stdby Down Idle REMARKS 6-24 Hitachi EX300 Excavator w/Lodril X Ford F250 Pickup Truck X 7-15 John Deere 544J Loader X 7-24 CAT 904B Loader X CAT 315L Excavator X CONTRACTOR'S WORKFORCE Operating Contractor's ID(A-E,see page 1) NUMBER!HOURS NUMBER Laborers I Pipe Layr Oper Drivers Flogger*Electrician Other Male Female Apprentice Trainee A 3 / 2 / / / 1 / 6 B / / / / / / / / C / / / / / / / / D / / / / / / / / E I / / / / / / / / / _ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 1 / / / / / / / / / / / / / / - / / / / / / / / _ / / / / / / / / (Signed) NAME: avi Meisenheimer,Construction Inspector 'CPG SEATTLE •TACOMA Inspector's Daily Report (DIARY-continued) IDR Sheet 3 of 4 Sheets Protect No. Project Name Day Date RFB#15-015 South 352nd ST Extension Wednesday January 6,2016 Prime Contractor DBM Contractors DIARY-continued 7:30 AM: I arrived onsite,crew continued placing lagging from pile#21 through 1. Work on this to continue throughout the day. 10:00 AM: Completed lagging at pile 13,began placing lagging from pile 12 to 1. 3:30: Completed work for the day,lagging completed from pile 53 to 1 at 6 feet below top of wall. I departed site. ( ned) NAME: Davi�isenheimer,Construction Inspector • Kpc. Inspector's Daily Report SEATTLE •TACOMA (DIARY-continued) IDR Sheet 4 of 4 Sheets Prosect No. Prosect Name Day Date RFB#15-015 South 352nd ST Extension Wednesday January 6,2016 Prime Contractor DBM Contractors DIARY-photos Placing lagging between piles 50 and 18 Placing lagging between piles 50 and 18 (Signed) NAME: David Meisenheimer,Construction Inspector