15-100190City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: LEE
FILE --'
Project Address: 35412 4TH AVE SW
Project Description: Installation of low voltage home security system
0
Electrical
Permit #: 15 -100190=00 -EL
Inspection Request Line: (253) 835-3050
.5-//
Parcel Number: 872450 0190
Owne
ARRIlican
Contractor
KYU-HYUN LEE
ALYSSA ALBACETE
PROTECT YOUR HOME
MIAE LEE
PROTECT YOUR HOME
PROTEYH934RS (12/10/15)
35412 4TH AVE SW
3750 PRIORITY WAY DR S SUITE 200
3750 PRIORITY WAY DR S SUITE 200
FEDERAL WAY WA 98023
INDIANAPOLIS IN 46240
INDIANAPOLIS IN 46240
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Electrical Fixtures
Low Voltage - Other (Residential). 1
Is Use Educational or Institutional?.......................No
PERMIT EXPIRES Tuesday, July 14, 2015
Permit Issued on Thursday, January 15, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
th ral Way.
Owner oragent: 015Date:
FINALED
THIS CARD IS TO MAIN ON-SITE
CITY OF Construction In ection Record
Federa.I Way INSPECTION REQUE TS: (253) 835-3050
PERMIT #: 15 -100190 -00 -EL Address: 35412 4TH AVE SW
Project: KYU-HYUN LEE FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
LIFER Ground (4295)Ditch
cover (4030)
Temporary Power (4275)
Slab/Concrete Floor (4255)
Approved
By
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Pool Bonding (4195)
E]
Temporary Power (4275)
Service (4235)
By
Approved
By
Approved
By
Approved
By
Date
By
Date
By
Date
❑
❑
Feeders/Sub-panels (4045)
Rough Electrical (4225)
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
B
Date
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date