12-104971Ill.",
A
Mechanical
City of Federal Way
Community & Econ. Dev. Services' Permit #: 12-104971 -00-M E
33325 8th Ave S
LE'
Federal Way, WA 98003 Inspection Request Line: 253 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609 p q
Project Name: VAUGHAN
Project Address: 35813 3RD AVE SW Parcel Number: 302104 9121
Project Description: Replacing electric furnace with new electric furnace and adding new Heat Pump
Owner
Applican
Contractor
RUSSELL F VAUGHAN
DAVID BRADSHAW
ALL SEASONS INC (GENERAL)
35813 3RD AVE SW
ALL SEASONS INC
ALLSEI*03055 (12/17/13)
FEDERAL WAY WA 98023-7362
4851 S WASHINGTON ST
4851 S WASHINGTON ST
TACOMA WA 98409
TACOMA WA 98407
Mechanical Valuation............................................5600
Is this an Online or O.T.C. application?.................Yes
Air Handling Units ........................ 1 Compressors / Heat Pumps............ 1 Furnaces......................................... 1
PERMIT EXPIRES Monday, April 29, 2013
Permit Issued on Wednesday, October 31, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
nd i deral Way.
Owner or agent: (INDate:
J
CITY OF
Federal Way
THIS CARD IS TOMAIN ON-SITE
''oustruction InIMS:ction Record
INSPECTION REQU(253) 835-3050
PERMIT #: 12 -104971 -00 -ME Address: 35813 3RD AVE SW
Project: RUSSELL F VAUGHAN FEDERAL WAY, WA 98023-7362
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
FIDE
Mechanical Rough -in (4165)
Gas Piping (4125)El
Final Electrical
Approved
Final - Mechanical (4065)
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Date ,�•�
FIDE
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date