18-101364City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax (253) 835-2609
1Vlechanical
Permit #:18 -101364 -00 -ME
FILEInspection Request Line: (253) 835-3050
Project Name: KELLEY
Project Address: 34413 25TH AVE SW
Project Description: Installing a tankless water.heater and gas piping.
.. Parcel Number: 011470 0020
Owner
Applicant
Contractor
BRIAN KELLEY
VANESSA STEPHENSONWASHINGTON
WASHINGTON ENERGY SERVICES CO,
34413 25TH AVE SW
ENERGY SERVICES CO
(GENERAL)
FEDERAL WAY WA 98023-3014
3909 196TH ST SW
WASHIES85INS (9/7/19)
LYNNWOOD WA 98036
3909 196TH ST SW
LYNNWOOD WA 98036
Additional Permit Information
Mechanical Work Valuation? .................................. 4000 Is this an Online or O.T.C. application?.................. Yes
ry��sri �3G9,:jME
�
.r �. E ...Gas Piping I Hot Water Tanks
PERMIT EXPIRES Monday, 24 September, 2018
Permit Issued on Wednesday, March 28, 2018
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: K" Date:
■ ■ v L-
+ CrrVOF
Federal Way
a
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 18101364 00 Address: 34413 25TH AVE SW
Project: NETTIE D KELLEY FEDERAL WAY WA 98023-3014
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)
Gas Piping (4125)3❑
Final Electrical
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date