Loading...
18-101364City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax (253) 835-2609 1Vlechanical Permit #:18 -101364 -00 -ME FILEInspection Request Line: (253) 835-3050 Project Name: KELLEY Project Address: 34413 25TH AVE SW Project Description: Installing a tankless water.heater and gas piping. .. Parcel Number: 011470 0020 Owner Applicant Contractor BRIAN KELLEY VANESSA STEPHENSONWASHINGTON WASHINGTON ENERGY SERVICES CO, 34413 25TH AVE SW ENERGY SERVICES CO (GENERAL) FEDERAL WAY WA 98023-3014 3909 196TH ST SW WASHIES85INS (9/7/19) LYNNWOOD WA 98036 3909 196TH ST SW LYNNWOOD WA 98036 Additional Permit Information Mechanical Work Valuation? .................................. 4000 Is this an Online or O.T.C. application?.................. Yes ry��sri �3G9,:jME � .r �. E ...Gas Piping I Hot Water Tanks PERMIT EXPIRES Monday, 24 September, 2018 Permit Issued on Wednesday, March 28, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: K" Date: ■ ■ v L- + CrrVOF Federal Way a THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 18101364 00 Address: 34413 25TH AVE SW Project: NETTIE D KELLEY FEDERAL WAY WA 98023-3014 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165) Gas Piping (4125)3❑ Final Electrical Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date