14-101592Project Name: LEWIS
Project Address: 30019 4TH AVE SW
Project Description: Walk in tub
0 Piutfibing
Permit #: 14 -101592 -00 -PL
Inspection Request Line: (253) 835-3050
Parcel Number: 720500 0030
Owner
Al2RIlicant
City of Federal Way
ENOCH LEWIS
Community &Econ. Dev. Services
FILE
33325 8th Ave S
12601 NE WOODINVILLE DR #E4
Federal Way, WA 98003
FEDERAL WAY WA 98023-3515
Ph: (253) 835-2607 Fax: (253) 835-2609
12601 NE WOODINVILLE DR E4
Project Name: LEWIS
Project Address: 30019 4TH AVE SW
Project Description: Walk in tub
0 Piutfibing
Permit #: 14 -101592 -00 -PL
Inspection Request Line: (253) 835-3050
Parcel Number: 720500 0030
Owner
Al2RIlicant
Contractor
ENOCH LEWIS
WASHINGTON STATE KITCHEN & BATH
WASHINGTON STATE KITCHEN & BATH
30019 4TH AVE S
12601 NE WOODINVILLE DR #E4
WASIESK927BT (3/16/16)
FEDERAL WAY WA 98023-3515
WOODINVILLE WA 98023
12601 NE WOODINVILLE DR E4
WOODINVILLE WA 98072
Plumbing Fixtures
Bathtubs ......................................... 1
PERMIT EXPIRES Sunday, October 5, 2014
Permit Issued on Tuesday, April 8, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
'and -the City of Federal Way.
Owner or agent Am ft 0 1 MW M Date:
UNLINI=
4%
CITY OF
Federal Way
PERMIT #:
14 -101592 -00 -PL
UiA CARD IS TO MAIN ON-SITE
Construction In ection Record
INSPECTION REQ TS: (253) 835-3050
Address: 30019 4TH AVE SW
Project: ENOCH LEWIS FEDERAL WAY, WA 98023-3515
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Final - Plumbing (4075)
Approved
B � Dat94:_�Ll
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
Final Electrical
Approved
Gas Piping (4125)
Approved to cover
By
Approved
Approved to release test
By
Date
By
V%4 Date 4 4
By
Date
Final - Plumbing (4075)
Approved
B � Dat94:_�Ll
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date