13-100965a 0 ° M6chanical
City of Federal Way
Community & Econ. Dev. Services Permit #: 1 3-100965-00-M E
FILE'''
33325 8th Ave S
Federal Way, WA 98003 253 Inspection Request Line:
Ph: (253) 835-2607 Fax: (253) 835-2609 p q ( ) 835-3050
Project Name: WARREN CONSTRUCTION
Project Address: 29834 4TH AVE SW Parcel Number: 720500 0190
Project Description: Replace existing gas furnace
wn
Al2RIlcant
Contractor
WARREN CONSTRUCTION
DWAYNE CURTISS
ALL WAYS AIR CONTROL INC
28116 10TH AVE S
ALL WAYS AIR CONTROL INC
ALLWAAC074C3 (5/6/14)
DES MOINES WA 98198
1515 S CENTER ST
1515 S CENTER ST
TACOMA WA 98409
TACOMA WA 98409
Is this an Online or O.T.C. application?.................Yes
Ducting........................................... 1 Furnaces......................................... 1
PERMIT EXPIRES Wednesday, August 28, 2013
Permit Issued on Friday, March 1, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
CINI and the -C& of Federal Way.
Owner or agent: Date:
� .:� 5/140/13
THIS CARD IS TO MAIN ON-SITE ,.
CITY Construction I ection Record
Federal Way INSPECTION REQU TS: (253) 835-3050
PERMIT #: 13 -100965 -00 -ME Address: 29834 4TH AVE SW
Project: WARREN CONSTRUCTION FEDERAL WAY, WA 98023-3513
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
E]
Mechanical Rough -in (4165)Gas
Piping (4125)
Final Electrical
Approved
Final - Mechanical (4065)
Approved
By
Approved to release test
Approved
By
Date _
By
Date
By (2—
,W Date 15_1 10– 1
FILE
El
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date