Loading...
13-100965a 0 ° M6chanical City of Federal Way Community & Econ. Dev. Services Permit #: 1 3-100965-00-M E FILE''' 33325 8th Ave S Federal Way, WA 98003 253 Inspection Request Line: Ph: (253) 835-2607 Fax: (253) 835-2609 p q ( ) 835-3050 Project Name: WARREN CONSTRUCTION Project Address: 29834 4TH AVE SW Parcel Number: 720500 0190 Project Description: Replace existing gas furnace wn Al2RIlcant Contractor WARREN CONSTRUCTION DWAYNE CURTISS ALL WAYS AIR CONTROL INC 28116 10TH AVE S ALL WAYS AIR CONTROL INC ALLWAAC074C3 (5/6/14) DES MOINES WA 98198 1515 S CENTER ST 1515 S CENTER ST TACOMA WA 98409 TACOMA WA 98409 Is this an Online or O.T.C. application?.................Yes Ducting........................................... 1 Furnaces......................................... 1 PERMIT EXPIRES Wednesday, August 28, 2013 Permit Issued on Friday, March 1, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington CINI and the -C& of Federal Way. Owner or agent: Date: � .:� 5/140/13 THIS CARD IS TO MAIN ON-SITE ,. CITY Construction I ection Record Federal Way INSPECTION REQU TS: (253) 835-3050 PERMIT #: 13 -100965 -00 -ME Address: 29834 4TH AVE SW Project: WARREN CONSTRUCTION FEDERAL WAY, WA 98023-3513 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. E] Mechanical Rough -in (4165)Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) Approved By Approved to release test Approved By Date _ By Date By (2— ,W Date 15_1 10– 1 FILE El Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date