14-101099\ a
n Electrical
City of Federal Way
Community & Econ. Dev. Services FILE Permit #. 14 -101099 -00 -EL
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line: (253) 835-3050
Project Name: WARREN CONSTRUCTION
Project Address: 29834 4TH AVE SW Parcel Number: 720500 0190
Project Description: 90 Amp Sub Panel Addition For Future Shop And Hot Tub Feeder
Owner
ARplicant
Contractor
WARREN CONSTRUCTION
ERIN ORMAN
RICHARD C REED ELECTRIC INC
28116 10TH AVE S
RICHARD C REED ELECTRIC INC
RICHACRO22KQ (5/18/14)
DES MOINES WA 98198
11012 CANYON RD E SUITE 8-958
11012 CANYON RD E SUITE 8958
PUYALLUP WA 98375
PUYALLUP WA 98373
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional? ....................... No
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 amps (F 1 Circuits - Residential ...................... 3 Hot Tub .......................................... 1
PERMIT EXPIRES Monday, September 8, 2014
Permit Issued on Wednesday, March 12, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
t r
crrr of ,
Federal Way
PERMIT 9:
14 -101099 -00 -EL
THIS CARD IS TO IIAIN ON-SITE
Construction In ection Record
INSPECTION REQUESTS: (253) 835-3050
Address: 29834 4TH AVE SW
Project: WARREN CONSTRUCTION FEDERAL WAY, WA 98023-3513
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El Final - Electrm
/ Approved
By,
9-1
Rough Electrical Final Electrical ERight of Way
Approved Approved Approved
By Date By Date By Date
UFER Ground (4295)Ditch
cover (4030)
Temporary Power (4275)
Slab/Concrete Floor (4255)
E]
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
El Final - Electrm
/ Approved
By,
9-1
Rough Electrical Final Electrical ERight of Way
Approved Approved Approved
By Date By Date By Date
Pool Bonding (4195)
E]
Temporary Power (4275)
E]
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (4045)
Rough Electrical (4225)
E]
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
El Final - Electrm
/ Approved
By,
9-1
Rough Electrical Final Electrical ERight of Way
Approved Approved Approved
By Date By Date By Date