Loading...
12-105070Project Name: SITWKIN Project Address: 36804 3RD AVE SW Project Description: like for like gas furnace replacement 0 Mechahical Permit #: 12 -105070 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 2188201005 Owner Applicant City of Federal Way Community &Econ. ev. Services ROBERT A SIMPKIN 33325 8th Ave S FILE Federal Way, WA 98003 BOB'S HEATING & A/C INC Ph: (253) 835-2607 Fax: (253) 835-2609 FEDERAL WAY WA 98023-7333 Project Name: SITWKIN Project Address: 36804 3RD AVE SW Project Description: like for like gas furnace replacement 0 Mechahical Permit #: 12 -105070 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 2188201005 Owner Applicant Contractor ROBERT A SIMPKIN CHRISTIANA FLAJOLE BOB'S HEATING & A/C INC (GENERAL) 36804 3RD AVE SW BOB'S HEATING & A/C INC BOBSHRA9790B (9/2/13) FEDERAL WAY WA 98023-7333 13633 NE 126TH PL SUITE 350 13615 126TH PL NE SUITE 400 FEDERAL WAY WA 98034 KIRKLAND WA 98034 Additional Permit Information Mechanical Valuation............................................3200 Is this an Online or O.T.C. application?.................Yes -Mechanical Fixtures' Furnaces......................................... 1 PERMIT EXPIRES Monday, May 6, 2013 Permit Issued on Wednesday, November 7, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: r1mi , u c Date: ■ ■ V51111111111 THIS CARD IS TOMAIN ON—SITE a CITY °F Construction In ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 12 -105070 -00 -ME Address: 36804 3RD AVE SW Project: ROBERT A SIMPKIN FEDERAL WAY, WA 98023-7333 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By 0 Date '? ^ 3 Rough Electrical Approved 1:1Approved Final Electrical 11 Right of Way Approved By Date By Date By Date