Loading...
12-100971i' Vt City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: GRENGS 0 FILE Project Address: 30525 5TH AVE SW Project Description: Remove/replace gas water heater Mechanical Permit #: 12 -100971 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 178890 0210 Owner Applicant Contractor ARNOLD H GRENGS JULIE CASKEY FAST WATER HEATER CO (GENERAL) 30525 5TH AVE SW FAST WATER HEATER COMPANY FASTWWH948BC (1/4/14) FEDERAL WAY WA 98023-3914 12601 132ND AVE NE 12601 132ND AVE NE KIRKLAND WA 98034 KIRKLAND WA 98034 Additional Permit Information Mechanical Valuation............................................719.00 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Hot Water Tanks ............................ 1 PERMIT EXPIRES Wednesday, August 29, 2012 Permit Issued on Friday, March 2, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington th ral Way. Owner or agent: Date: Z �2 FIN!�l ED THIS CARD IS TO MAIN ON-SITE Crr. ofCaNtruction In ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: Project: 12 -100971 -00 -ME ARNOLD H GRENGS Address: 30525 5TH AVE SW FEDERAL WAY, WA 98023-3914 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date Mechanical Rough -in (4165)Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date y Date -�3 _ e— Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date