Loading...
13-100430c City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 � FILE Project Name: ADAMSON Project Address: 36836 4TH AVE SW Project Description: Change out 1 electric water heater dumbing Permit #: 13 -100430 -00 -PL Inspection Request Line: (253) 835-3050 Parcel Number: 218820 0785 Owner A,ualicant Contractor KENNETH ADAMSON TOM HAGAR WASHINGTON WATER HEATERS INC 36836 4TH AVE SW WASHINGTON WATER HEATERS INC WASHII*980OP (9/17/14) FEDERAL WAY WA 98023-7343 1800 RICHARDS RD SUITE A 1800 RICHARDS RD SUITE A BELLEVUE WA 98005 BELLEVUE WA 98005 Water Heaters ................................. 1 PERMIT EXPIRES Sunday, July 28, 2013 Permit Issued on Tuesday, January 29, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington IN and the City of Federal Way. 11 Owner or agent: K1 1 1 k i C Date: ■ ■ � wr CITY OF Federal Way PERMIT #: THM9 CARD IS TOIN ON-SITE10 { Construction In rection Record INSPECTION REQUE(253) 835-3050 13 -100430 -00 -PL Address: 36836 4TH AVE SW Project: KENNETH ADAMSON FEDERAL WAY, WA 98023-7343 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Final - Plumbing (4075) Approved By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date Plumbing Groundwork (4190) Rough Plumbing (4230) Gas Piping (4125) Approved to cover Approved Approved to release test By Date By Date By Date Final - Plumbing (4075) Approved By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date