Loading...
15-105254Mech>icl City of Federal Way Permit #: 15-105254-00-M E Community &Econ. Dev. Services 33325 8th Ave S Federal WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: O'NEIL Project Address: 36921 5TH AVE SW Parcel Number: 218820 2175 Project Description: Install new gas furnace with gas piping to 5 outlets and install 3 -ton heat pump Owner Applican Contractor CHARLEEN ONEIL JAIMIE HOW BRENNAN HEATING & A/C LLC (GENERAL LLOYD ONEIL BRENNAN HEATING & A/C 01) 36921 5TH AVE SW 4601 S 134TH PL BRENNHA971R9 (12/29/15) FEDERAL WAY WA 98023 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures Compressors / Heat Pumps............ 1 Furnaces ......................................... 1 Gas Pipe Outlets............................. 5 PERMIT EXPIRES Tuesday, April 12, 2016 Permit Issued on Thursday, October 15, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: C1WQF, Federal Way PERMIT #: 15 -105254 -00 -ME THIS CARD IS TO RKMAIN ON-SITE Construction Incoon RecordINSPECTION REQUE TS: (253) 835-3050 Address: 36921 5TH AVE SW Project: CHARLEEN O'NEIL FEDERAL WAY, WA 98023-7346 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read lett to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165) 0 Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date B Date 1 jC> _V3 _� M By IAS% Date 10 9-t' Rough Electrical Approved EFinal Electrical Approved EJRight of Way -~ Approved By Date By Date By Date