Project Name: ROEGNER
Project Address: 29203 3RD AVE SW Parcel Number: 119600 0662
Project Description: REP Replace collapsed retaining wall at driveway.
wn
ARRIlicant
Contractor
Lende
ROBERT A ROEGNER
MARK SCHAEFER
MCBRIDE CONSTRUCTION
OWNER IS LENDER
29203 3RD AVE SW
PACIFIC ENGINEERING
RESOURCES
FEDERAL WAY WA 98023
TECHNOLOGIES
MCBRICRO99JZ (3/25/15)
1700 WESTLAKE AVE N SUITE 100
224 NICKERSON ST
SEATTLE WA 98109
SEATTLE WA 98109
Census Category: 565 - Fence/retaining wall
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load
Floor Areas . ft. 0 0 1 0 0
Additional Permit Information
New/ Additional Sq. Feet -1 st Floor....................0
New / Additional Sq. Feet - 3rd Floor....................0
New / Additional Sq. Feet - Deck ......................... 0
Mechanical to be Included?...................................No
Plumbing to be Included?......................................No
New / Additional Sq. Feet - 2nd Floor...................0
New / Additional Sq. Feet - Basement...................0
New / Additional Sq. Feet - Garage.......................0
New/ Additional Sq. Feet - Other ..........................0
New / Additional Sq. Feet - Total .......................... 0
No Fixtures Associated With This Permit It
CONDITIONS:
1. Geotechnical engineer shall be on-site, as -needed to monitor construction activities.
2. Applicant shall prepare a re -vegetation plan for the cleared area of the slope, as recommened in the June
13, 2013 memo from Terracon Consultants. The plan shall be approved by the city. City will not give final
approval until the re -vegetation plan has been implemented and inspected by the city.
3. Provide Special Inspection of concrete,high strength bolting, steel, welding and soldier piles as needed to
meet the scope of the design and the IBC.
PERMIT EXPIRES Saturday, January 25, 2014
Permit Issued on Monday, July 29, 2013
hereby certify that the above information is correct and
the occupancy and these will be in accord nce with
9 %' Ad the C' 1
Owner or agent:
j -i
at the construction on the above described property and
laws, rules and regulations of the State of Washington
Federal Way. y
Date:
CIT/ OF
Federal Way
PERMIT #:
Project:
THIS CARD IS TO REMAIN ON-SITE
Construction Inction Record
INSPECTION REQUE TS: (253) 835:3050
13 -101901 -00 -SF Address: 29203 3RD AVE SW
ROBERT A ROEGNER FEDERAL WAY, WA 98023-3529
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0
SWM Precon Site Mtg (4400)
0
Initial Erosion Control (4365)
0
Footings/Setback (4110)
Slab/Concrete Floor (4255)
Approved
By
To be done prior to breaking ground
Approved to place concrete
By
Date
By
Date
By
Date
0
Foundation Wall (4115)
0
Drainage/Downspout (4040)
Final ElectricalRight
Approved
❑
Slab/Concrete Floor (4255)
of Way
Approved
By
Approved to place concrete
Approved to backfill
Date
Approved to place concrete
Date
By
Date
By
Date
By
Date
Underfloor Framing (4285)
Floor Sheathing (4105)El
Shear Walls (4245)
Approved to sheath floor
Approved to install flooring
Approved to install siding
By
Date
By
Date
By
Date
Roof Sheathing (4220)
Fire/Draft Stops (4095)Interim
Erosion Control (4370)
Approved to install roofing
Approved
Approved
By
Date
By
Date
By
Date
Prior to scheduling a Framing inspection;
Framing (4120)
Insulation (4150)
Electrical, Plumbing & Mechanical Rough -in and
Approved to insulate
Approved to install wallboard
Fire/Draft Stop inspections must be signed -off and
By
Date
By
Date
approved. IBC 109.3.4
Gypsum Wallboard Nailing (4130)
Final Erosion Control (4375)
Final - Building (4050)
Approved to install mud & tape
Approved
Approved
By
Date
By
Date
By
VkQ Date
Rough Electrical
Approved
Final ElectricalRight
Approved
�
of Way
Approved
By
Date
By
Date
By
Date
October 3, 2013
Mr. Robert Roegner
29203 3rd Avenue SW
Federal Way, WA. 98001
Attn: Mr. Robert Roegner
Re: Final Summary of Special Inspections
Roegner Driveway/Slope Restoration
29203 Vd Avenue SW
Federal Way, WA. 98001
Building Permit No. 13-101901
Terracon Project. 82125019
Dear Mr. Roegner:
lrerracon
Terracon Consultants, Inc. (Terracon) respectfully submits this letter to acknowledge that the
requested special inspections have been completed for the above -referenced project..
Terracon conducted inspections for this project from August 21 2013 through September 19,
2013 as described by our Daily Field Report Nos. 1 through 15. These reports, copies of which
were previously submitted, form, the basis for this final summary of our inspections.
In accordance with Chapter 17 of the International Building Code, Terracon conducted
inspections for the following:
1. Cast in Place Concrete Piles;
2. Reinforced Concrete;*
3. Post Installed Anchors.
*There are pending 28 day compressive strength breaks for the driveway slab and stairs. The
design strength designated for these two areas was achieved at the 7 day milestone.
To the best of our knowledge, it is our understanding that the work which was inspected as
referenced in our Daily Field Reports was constructed in general conformance with the
approved plans, building codes, and changes authorized by the structural engineer. If you have
questions or desire additional inf�t�ase call at your convenience.
Sincerely,
Terracon Consu
Paul D. Davis, P.E.
IoN
fJ
Terracon Consultants, Inc, 2115 S. 56V, St., Ste. 405
P [253] 5739939 F 12531573 9959
Tacoma, Washington 98409
terracon,com
A03 0 2013
cmO CITY OF FEDERAL WAY
Federal Way CDs
0
PERMIT APPLICATION
PERMIT NUMBER I�— t 0 l 9 0 1 — 00
— TARGET DATE
SITE ADDRESS
SUITE/UNIT #
2t72 -o � — gg� SIJ
PROJECT VALUATION
ZONING
ASSESSOR'S TAR/PARCEL #
O
J
d 0
TYPE OF PERMIT
❑ BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION XENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
PROJECT DE8CRIPTION
Detailed description of work to
:— 44=
be included on this permit only
PROPERTY OWNER
NAM
PRIMARY PHONE
2,T3- — _.Cc113
MAILING ADDRESS
203 jeO A.�e W
E•MAD.
CITY f . f„i
WA
j �12-3
NAME IPHONE
"
ADDR
MAILINO��ttESS
22-4- lc 6P_S.V J ST.
E"MAD.
CONTRACTOR
CITY
STATE
W
ZIP
17('310
FAX
SGS c
WA STATE CONTRACTOR'S LICENSE #
EXPIRATION DATE
FEDERAL WAY EUSINIM LICENSE #
IY? C. iZdq��
z i2 - i (s -
NAME
do _ w So�a6&. (,
PRDNARY PHONE
ZX J • 7 � 0 ca
NAHJNO ADDRESS
E-MAIL
APPLICANT
CITY
2&="
STATE
GIJ,�
ZIP
'7
FAX
NAME
PRIMARY PHONE
PROJECT CONTACT
I rZ_k
S C>o
NAILING ADDRESS
DQ _ O 40
S -NAIL
A '(
(Me individual to receive and
respond to all correspondence
CITY
5
STATE
W
ZIP
fm wff
FAX
2-0& ,
concerning this application)
PROJECT FINANCING
NAME
El OWNER -FINANCED
Required value of $5,000 or more
MAILING ADDRESS, QTY, STATE, ZIP
PHONE
(RCW 19.27.095)
I certVy under penalty of perjury that I am the property owner or authorised agent of the property owner. I cert(f y that to the best
of my knowledge, the irtformation submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its o leers and employees, upon the accuracy of the
information supplied to the city as apart of this application.
SIGNATURE: DATE
PRINT NAME:,
Bulletin #100 —January 1, 2013 Page 1 of 3 k:Wandouts\Permit Application
.jx.ca.„
A"
VALUE OF MECHANICAL WORK
MECHANICAL PERMIT $
Indicate how many of each type offixture to be installed or relocated as part o this project. Do not include existingftctures to remain.
AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER (Describe)
AIR CONDITIONER FIREPLACE INSERTS HOODS (commercial)
BOILERS FURNACES HOT WATER TANKS (Gas)
COMPRESSORS GAS LOG SETS REFRIGERATION SYST
DUCTING GAS PIPING WOODSTOVES
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY?
WATER PURVEYOR
VALUE OF PLUMBING WORK
PLUMBING PERMIT
C WJ
$
Indicate how many of each type offixture
to be installed or relocated as
part of this project. Do not include indstingfvctures
to remain.
BATHTUBS (w Tub/shower combo)
LAVS (Hmdsinka)
TOILETS
WATER PIPING
DISHWASHERS
RAINWATER SYSTEMS
URINALS
OTHER (Describe)
DRAINS
SHOWERS
VACUUM BREAKERS
DRINKING FOUNTAINS
SINKS pitch_/utility)
WATER HEATERS (Electric)
HOSE BIBBS
SUMPS
WASHING MACHINES
TOTAL FIXTURES
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY?
WATER PURVEYOR
BEWER PURVEYOR
VALUE OF Z=8=43 IMPROVEMENTS
C WJ
EXISMG/PREVIOUS USE
LOT SIZE (In Sq—e Feet)
E=8TIAO FNIE 8PR1=ZA SYSTEM?
PROPOSED FIRE SUPPRESSION SYSTEM?
❑ Yes'y� No
El Yes W.,No
S_ Sj.,l F I
1 0 S-00
COMMERCIAL - NEWADDITION
AREA DESCRIPTION Ana Occupancy Qroup,$) Construction # of Additional Information
is Sauare Feet TvDe Stories
ADDITION
COMMERCIAL - REMODEL/TENANT IMPROVEMENTS
AREA DESCRIPTION Area Occupancy (iroupls) Construction # of Additional Information
in Square Feet Type Stories
TENANT AREA ONLY
Bulletin #100 —January 1, 2013 Page 2 of 3 UliandoutsTermit Application
June 13, 2013 erracan
Robert A. Roegner
29203 V Avenue SW
Federal Way, Washington
Re: Erasion/Sediment Control Recommendations
Proposed Driveway/Slope Restoration
SW 292nd Street Water Main Break
Federal Way, Washington
Terracon Project. B2125019
Dear Mr. Roegner:
The purpose of this letter is to provide general recommendations for erosion and sediment
control. Terracon Consultants, Inc. (Terracon), has previously prepared a Preliminary
Geotechnical Engineering Report for the project (Terracon Project Number B2115043, dated
April 6, 2012) and a Geotechnical Design letter (Terracon Project Number B2125019, dated
December 4, 2012).
Temporary Erosion Control and Sediment Control Measures: Because stripped surfaces and
soil stockpiles are typically a source of runoff sediments, they should be given particular
attention. We recommend that silt fences, berms, and/or swales be installed around the
downslope side of stripped areas and stockpiles in order to capture runoff water and sediment.
If foundation excavation occurs during wet weather, all stripped surfaces should be covered with
straw to reduce runoff erosion, whereas soil stockpiles should be protected with plastic
sheeting. Permanent slopes should be revegetated as soon as possible to minimize erosion. A
site specific plan based on the above recommendations should be prepared to minimize the
construction impact to the slope and surrounding areas.
We appreciate the opportunity to be of service to you on this project. If you have any questions,
please contact me.
T
Paul D. Davis, P.E.
Office Manager
RECEIVED
JUN 2 12013
CM OF FEDERAL WAY
CDs
cc: Robert D. Stone, McLarens Young International (1, via e-mail)
Mark Schaefer, P.E., S.E., Pacific Engineering Technologies, Inc. (1, via e-mail)
Terracon Consultants, Inc, 2115 S. 56th Street, Suite 405 Tacoma, Washington 98409
P 1253] 573 9939 F 12531573 9959 terracon.com