Loading...
16-103144Oailding - Multi ,, amiiy City & Federal Way Permit #: 16-103144-00-M F CommunityEcon. Dev. Services 33325 8th Ave S Federal Way, WA 98003 FILE Inspection Request Line. 2 Ph: (253) 835-2607 Fax: (253) 835-2609 p q (53) 835-3050 Project Name: THE RIDGE & SHORES APARTMENT (AKA THE SHORES) -9 101 Project Address: 31815 3RD PL SW Parcel Number: 556060 0100 Project Description: REP - Framing repair to existing crawl space due to fire damage Owner Applicant Contractor Lender SHORES AT FEDERAL WAY LLC NAVI PACIFIC CONSTRUCTION NAVI PACIFIC CONSTRUCTION OWNER IS LENDER 9757 JUANITA DR NE STE 300 1335 120TH AVE NE NAVIPI*991BP (1/10/17) KIRKLAND WA BELLEVUE WA 98005 1335 120TH AVE NE 98034 BELLEVUE WA 98005 Census Category: 434 - Residential alt/add - no change in number of units Includes: 41 42 93 44 Occupancy Class: Construction Type: Occupancy Load: Floor Areas . ft.) 0 0 0 0 Additional Permit Information Mechanical to be Included?....................................No Number of Stories.................................................2 Permit for Building Shell Only? .............................No Plumbing to be Included? ....................................... No Proposed Structure Valuation................................6000.00 No Fixtures Associated With This Permit!! PERMIT EXPIRES Monday, December 26, 2016 Permit Issued on Wednesday, June 29, 2016 I hereby certify that the above information is co';ect and that the construction on the above described property and the occupancy and the use will be_inaccor nce with-ttre laws, rules and regulations of the State of Washington arJ City of Federal Way. Owner or agent: Date:' -- / THIS CARDIS TO MAIN ON-SITE CITY vF Construction In ection Record y Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 16 -103144 -00 -MF Address: 31815 3RD PL SW Project: SHORES AT FEDERAL WAY L L C FEDERAL WAY, WA 98023-4805 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Initial Erosion Control (4365) Footings/Setback (4110) Final Electrical Foundation Wall (4115) Slab/Concrete Floor (4255) To be done prior to breaking ground Approved to backfill Approved to place concrete Approved to place concrete or grout Approved to place concrete By Date By Date By Date Drainage/Downspout (4040)Re-steel (4215) Final Electrical Slab/Concrete Floor (4255) Right of Way Approved Approved to backfill Date Approved to place concrete or grout By Date Approved to place concrete By Date By Date By Date Underfloor Framing (4285) E] Floor Sheathing (4105) Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date a -Ly— 4f By pf4-t Date J -2.q- I By Date Roof Sheathing (4220) E] Fire/Draft Stops (4095)Interim Erosion Control (4370) Approved to install roofing Approved Approved By Date By Date By Date Prior to scheduling a Framing inspection; Framing (4120) Insulation (4150) Electrical, Plumbing & Mechanical Rough -in and Approved to insulate Approved to install wallboard Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 By Date By e14_ Date E] Gypsum Wallboard Nailing (4130) E] Suspended Ceiling Grid (4265)El Final - S K F & R (4060) Approved to install mud & tape Approved to drop tiled Approved By Date By Date By Date E] Final Erosion Control (4375) E] Final - Building (4050) Approved Approved By Date By Date Rough Electrical Approved 1:1Approved Final Electrical ❑ Right of Way Approved By Date By Date By Date Mr. Masnyy: Per your request we visited the subject building on June 15, 2016 to review potential for structural damage to framing in a crawl space in Unit l0A due to a tenant fire. We were told the tenant had placed a bag of hot charcoals from a barbeque on the floor of the exterior storage closet adjacent to the unit patio. The hot charcoals burned thru the OSG floor sheathing and dropped into the crawl space below. The framing of the crawl space became inflamed locally near the point of fire entry prior to the fire department extinguishing the fire. Framing in the crawl space is summarized in our attached detail #1. We provided a design check for the 2x10 joists, 6x8 beams, and 4x6 posts. All the sizes of the existing framing members and the spacing's shown in the detail were provided by you. Our calculations are based on a 15psf dead load and a 40psf live load per code for living areas. We did not have information that indicated additional second floor bearing wall load was loading any of the fire damaged beams and therefore our design checks the beams for the one level of loading only. You should confirm during the repair of the unit if additional conditions of loading need to be considered. Our attached calculations confirm that the 2x10 joist and the 6x8 beams may be acceptable within the limits of fire charring indicated in the detail. In summary it appears that the fire charring damaged some joists to the point of replacement and some to the point of DHP-Engineering Memo#1 El Memo ILM Structural Building Consultants From ❑ Ph Log ❑ Confr. 32008 32"d Ave S, Suite B, Federal Way, WA 98001 Dean Peyton, PE ❑ info. Phone (253) 220-0848 Distribution: Date: 6-15-16 Time: Project: Crawl Space Fire Damage Review Project No. 16.047 Person: Andrey Masnyy Phone No. Company: NAVI Pacific Construction, Inc. Fax No. 1335 120'Ave NE CITY OF FEDERAL WAY Bellevue, WA 98005 CDS Subject: Unit 10A 31815 3rd Place Sent Via...... Fax ❑ E-Mail t] Billing File ❑ Mr. Masnyy: Per your request we visited the subject building on June 15, 2016 to review potential for structural damage to framing in a crawl space in Unit l0A due to a tenant fire. We were told the tenant had placed a bag of hot charcoals from a barbeque on the floor of the exterior storage closet adjacent to the unit patio. The hot charcoals burned thru the OSG floor sheathing and dropped into the crawl space below. The framing of the crawl space became inflamed locally near the point of fire entry prior to the fire department extinguishing the fire. Framing in the crawl space is summarized in our attached detail #1. We provided a design check for the 2x10 joists, 6x8 beams, and 4x6 posts. All the sizes of the existing framing members and the spacing's shown in the detail were provided by you. Our calculations are based on a 15psf dead load and a 40psf live load per code for living areas. We did not have information that indicated additional second floor bearing wall load was loading any of the fire damaged beams and therefore our design checks the beams for the one level of loading only. You should confirm during the repair of the unit if additional conditions of loading need to be considered. Our attached calculations confirm that the 2x10 joist and the 6x8 beams may be acceptable within the limits of fire charring indicated in the detail. In summary it appears that the fire charring damaged some joists to the point of replacement and some to the point of 0 DHP Engineering, PS Memo #I - continued use if an additional sistered joist is added per our repair details. The beams did appear to be in good order but may need an additional side member if the charring is found too excessive. A charring assessment of each joist, beam, and post will be the contractor's responsibility to confirm conformance with the limits of these details. If you have any questions on the above items, feel free to contact us at 253-220-0848. DHP-Engineering, PS Structural Building Consultants Dean Peyton, PE Principal Enclosure: Calculations and Detail Sketches page 2 of - { s' -TV, � LA2016U6.047 Ridges & Shores\Memo 1 DHP 6-15-16 Ridge & Shores Fire Damage Review.doc 6/16/2016 10 DHP - Engteering, P. S. Structural Buildhk4, ConsultalliN JOB SHEET OF jWI -LA AM .;4'I ! Phone (253) 220-0848 DESIGNED DATE PROJECT CHECKED DATE Alo 7-4O'lEAL6 4,'VO 11by 0 7725,e..4 %/ -vP2a)L -.5-?XcZ PAV-IA� A;eAlfe?e f,-% f -I Fzxv 4JAI/ 7- AD /4 DHP- Engfeering, P. S. Structural Building Consultants Phone (253) 220-0848 PROJECT JOB # SHEET DESIGNED DATE CHECKED DATF OF Ea n 2�(�v �o�sT ���r�a,J 4 �5 d. eq x ,56A/M5 Rko 011.�e (IV) '51.�rre_14eA5-"� - XS 4yz 4,6cowtO 151Z-6 ellYI44 41,�� 7-0 1,714 I DHP - EngReering, A S. Structural Building Consultants Phone (253) 220-0848 PROJECT 3 JOB # SHEET 7 OF DESIGNED DATE CHECKED DATE Ap 1`0 e2l, z54 '0' A DHP Engineering, PS Project Title: RiShore Structntal Building Conus Engineer: 0 Project ID: 16.047 32008 32nd Ave South, Suite B Project Descr: Fire Damaged Crawl Space Framing Federal Way, WA 98001 ■ WWAa w=! tS d -N 2Qt&, ' 45PR4 FM=I.-O 61151CRF-5fRA2QF0-N.EC6 Wood Beam ENERCALC, INC. 1983-2016, Build:6.16.6.7, ver6.16.6.7 ,.0t: DHP ENGINEERING Description ; Floor Joist 200 Assumed #2 HF CODE REFERENCES Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10 Load Combination Set: ASCE 7-10 Material Properties Analysis Method: Allowable Stress Design Fb - Tension 850 psi E: Modulus of Elastiafy Section used for this span Load Combination ASCE 7-10 Fb - Compr 850 psi Ebend- xx 1300 ksi Fv : Allowable Fc - Pdl 1300 psi Eminbend - xx 470ksi Wood Species : Hem Fir Fc - Perp Wood grade : No.2 Fv Ft Beam Bracing : Beam is Fully Braced against lateral -torsional buckling 405 psi 150 psi 525 psi Density 26.83 pcf Repetitive Member Stress Increase Span # 1 D(0 01995) L(0.0532) Maximum Deflection +D+0.750Lr+0.750L+H 0.312 r i r 1281 >=360 r 0.000 in Ratio = 34 Max Downward Total Deflection 0.133 in Ratio = 900>=240. K 2x10 Span = 10.0 ft Applied Loads Serviceloads entered. Load Factors will be applied for calculations Beam self weight calculated and added to loads uniform Load . D = 0,0150, L = 0 040 ksf, Tributary Width =1.330 ft, (Floor) DESIGN SUMMARY • Maximum Bending Stress Ratio = 0.4941 Maximum Shear Stress Ratio Section used for this span 2x10 Section used for this span fb : Actual = 531.09psi fv : Actual FS: Allowable = 1,075.25psi Fv : Allowable Load Combination +D+L+H Load Combination Location of maximum on span = 5.000ft Location of maximum on span Span # where maximum occurs = Span # 1 Span # where maximum occurs Maximum Deflection +D+0.750Lr+0.750L+H 0.312 Max Downward Transient Deflection 0.094 in Ratio = 1281 >=360 Max Upward Transient Deflection 0.000 in Ratio = 0 <360 Max Downward Total Deflection 0.133 in Ratio = 900>=240. Max Upward Total Deflection 0.000 in Ratio = 0 <240,0 Vertical Reactions Support notation : Far left is #1 Load Combination Support 1 Support 2 0verall MAXimum 0.379 0.379 Overall MINimum 0.068 0.068 +D+H 0.113 0.113 +D+L+H 0.379 0.379 +O+Lr+H 0.113 0.113 +D+S+H 0.113 0.113 +D+0.750Lr+0.750L+H 0.312 0.312 +D+0.750L+0.750S+H 0.312 0.312 +D+0.60W++i 0.113 0.113 +D+0.70E+H 0.113 0.113 +D+0.750Lr+0.750L+0.450W+H 0.312 0.312 +D+07501-+0.7505+0.450W+H 0.312 0.312 0.231 : 1 2x10 34.66 psi 1%00 psi +{3+L+H 0.000 ft = Span # 1 Values in KIPS a�� I DHP Engineering, PS WE a Structrual Building Consu4k �� pill! 32008 32nd Ave South, Suite B Federal Way, WA 98001 'A: pi Wood Beam KW-06004293 Description : Floor Joist 200 Assumed #2 HIP Vertical Reactions Load Combination 40.60D+0.60W40.60H +0 . 60D+0.70E+0.60H 0 Only Lr Only L Only S Only W Only E Only H Only Project Title: RiIShore Engineer: * Project ID: ,16.047 Project Descr Fire Damaged Crawl Space Framing File = h20161151CRF-51RA2QF0-N.EC6 ENERCALC, INC. 19n2016, Build:6. 16.6.7, Ver:6. 16.6.7 DHP Engineering, PS Aft �..�� Structrual Building ConsuW 32008 32nd Ave South, Suite B �i Federal Way, WA 98001 Wood Beam Project Title: RiShore Engineer: 0 Project ID: 46.047 Protect Descr. Fire Damaged Crawl Space Framing Description : Floor Joist 2x10 Assumed #2 HF Fire reduced 114" each side and 117 on bottom CODE REFERENCES Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10 Load Combination Set: ASCE 7-10 Material Properties PnIW 15 JUN 2016, _2.44 File=1:120161151CRf-5UiA2QF0-N.EC6 ENERCALC, INC. 1983-2016, Built:6.16.6.7, Ver.6.16.6.7 Analysis Method: Allowable Stress Design Fb - Tension 850.0 psi E: Modulus ofElasfidy Load Combination ASCE 7-10 Fb - Compr 850.0 psi Ebend- xx 1,300.Oksi FB: Allowable = Fc - PHI 1,300.0 psi Eminbend - xx 470.0ksi Wood Species : Hem Fir Fc - Perp Wood Grade : No.2 Fv Ft Beam Bracing : Beam is Fully Braced against lateral -torsional buckling 405.0 psi 150.0 psi 525.0 psi Density 26.830 pcf Repetitive Member Stress Increase 5.000ft D(0.01995) Q0.0532) Span # where maximum occurs = Span # 1 ♦ ♦ ♦ +D+0.750Lr+0.750L+H ♦ Max Downward Transient Deffection 0.166 in Ratio = 723>=360 Max Upward Transient Deflection f IM -A&M sp, = 10.0 n Applied Loads Beam self weight calculated and added to loads Uniform Load: D = 0.0150. L = 0.040 ksf, T€ibutary Width = 1.330 fl, (Floor) DESIGN SUMMARY Service loads entered Load Factors will be applied for calculations Maximum Bending Stress Ratio = 0.81a 1 Maximum Shear Stress Ratio Section used for this span 1.0 X 8.750 Section used for this span fb : Actual = 879.05psi N : Actual FB: Allowable = 1,075.25psi Fv : Allowable Load Combination +D+L+H Load Combination Location of maximum on span = 5.000ft Location of maximum on span Span # where maximum occurs = Span # 1 Span # where maximum occurs Maximum Deflection +D+0.750Lr+0.750L+H 0.307 Max Downward Transient Deffection 0.166 in Ratio = 723>=360 Max Upward Transient Deflection 0.000 in Ratio = 0 <360 Max Downward Total Deflection 0.233 in Ratio = 514 >=240. Max Upward Total Deflection 0.000 in Ratio = 0 <240.0 Vertical Reactions Support notation : Far left is #1 Load Combination Support 1 Support 2 Overall MAXimum - - - 0.374 0.374 Overall MINimum 0.065 0.065 +D+H 0.108 0.108 +D+L+H 0.374 0.374 +D+Lr+H 0.108 0.108 +D+S++i 0.108 0.108 +D+0.750Lr+0.750L+H 0.307 0.307 +D+0.7501-4750S+H 0.307 0.307 +0+0.60W+H 0.108 0.108 +D+0.70E+H 0.108 0.108 +D+0,750Lr+0.750L+0.450W+H 0307 0.307 +D+0.750L+0.750S+0.450W+H 0307 0.307 Design C 0.368: 1 1.0 X 8.750 55.21 psi 150.00 psi +D+L+H = 0.000 ft Span # 1 Values in KIPS DHP Engineering, PS Ah Mai I Structrual Building Consul ow 1101 32008 32nd Ave South, Suite B NlFederal Way, WA M1 t -0 o# oi Wood Beam Project Title: Rid Shore 4 Engineer: 0 Proiect ID: '16.047 Project Descr: Fire Damaged Crawl Space Framing Description : Floor Joist 200 Assumed #2 HF Fire reduced 114* each side and IT on bottom Vertical Reactions Support notation Far left is #1 Load Combination Support 1 Support 2 404.150L40,7505+0.525 +H 0.307 0,307 +0.60D40.60*460H 0,065 0,065 +0,60D+070E+0.60H 0.065 0.065 D Only 0,108 0.108 Lr Only L Only 0.266 0,266 S Only IN Only E Only H Only File= I-.1201S151CRF-MA24F0-N.EC6 ENERGALC, INC. 1%3-2016, &M:6.16.6.7, Ver.6.16.6.7 Values in KIPS 1; wl I DHP Engineering, PS Alk Project Title: Rid ift Shore Project ID: 1 1&047 4 Structrual Building Consulw Engineer: \W fill Project Descr: Fire Damaged Crawl Space Framing 32008 32nd Ave South, Suite B Federal Way, WA 98001 0am mwd1 1 pill JUN 2,016 "1 _­Pl� 10101111111 IMIN " File = I:016k151CRF-fFA20F0-N.EC6 Wood Beam ENERCALC, INC. 19812016, Build.t.16.6.7.Ver.6.16.6.7 Description : Floor Beam 6x8 Assumed #2 DF CODE REFERENCES Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10 Load Combination Set: ASCE 7-10 Material Properties Analysis Method: Allowable Stress Design Fb - Tension 900 psi E: Modulus of Elasticity Load Combination ASCE 7-10 Fb - Compr 900 psi Ebend-xx 1600 ksi 0.569 1 Fc - Pdl 1350 psi Eminbend - xx 580ksi Wood Species Douglas Fir - Larch Fc - Perp 625 psi Load Combination Wood Grade No.2 Fv 180 psi Span # where maximum occurs = Span # I Ft 575 psi Density 312 pcf Beam Bracing Beam is Fully Braced against lateral -torsional buckling 1.377 Repetitive Member Stress Increase DO 15) L04 fixe SW = 6,0 ft Applied Loads 0.038 in Ratio= Beam self weight calculated and added to loads Max Upward Transient Deflection Uniform Load . D = Hl% L = 0.040 kst, Tributary Width =10.0 ft, (Floor) DESIGN SUMMARY Max Downward Total Deflection Maximum Sending Stress Ratio = 0.569 1 Section used for this span 6x8 fb : Actual 585.36psi F13 -. Allowable = 1,035.00psi Load Combination +D+L+H Location of maximum on span = 1000ft Span # where maximum occurs = Span # I Maximum Deflection 1,377 Service loads entered. Load Factors will be applied for calculations. Maximum Shear Stress Ratio Section used for this span tv: Actual Fv: Allowable Load Combination Location of maximum on span Span # where maximum occurs Max Downward Transient Deflection 0.038 in Ratio= 1898>=360 Max Upward Transient Deflection 0,000 in Ratio= 0 <360 Max Downward Total Deflection 0.053 in Ratio= 1358>=240. Max Upward Total Deflection 0.000 in Ratio= 0 <240.0 Vertical Reactions Support notation : Far Loft is #1 Load Combination Support l Support 2 Over-all --- MAX -mum 1.677 1.677 Overall MINimum 0,286 0.286 +D+H 0.477 0.477 +D+L+H 1.677 1.677 +D+Lr+H 0.477 0.477 +D+S+H 0.477 0.477 -++ .750Lr+0750L+H 1,377 1.377 +D+0.750L+0,750S+H 1.377 1.3777 +D+0.60W+H 0.477 0.477 +D+0.70E+H 0,477 0.477 -0+4750Lr+0,750L+0A50vv+H 1.377 1.377 +D+0150L+0,750S+0.450W+H 1.377 1.377 Values in KIPS 0.270 :1 6X8 4&51 psi 180.00 psi +D+L+H 0.000 ft Span # I fps DHP Engineering, PS Project Title: Ri Shote Engineer: Proiect ID, 16.047 Stnxxrual Building Consul Project Descr: Fire Damaged Crawl Space Framing 3208 32nd Ave South, Suite B rrE�� M � Federal Way, WA 98001 rr�=i •�l armed ; urs2016 4 PIM VVOOCI BeahlElie=1:1201611510 - -- 51RA2QF6 N.EG6 ENERCALC, ING.1983-2016, Budd:6.1&6J, Ver:6.16.6.7 KW -06004293 Description: Floor Beam 6x8 Assumed #2 DF Vertical Reactions Support notation : Far left is #1 Values in KIPS Load Combination Support 1 Support 2 +0+0 750L+0.750St0.5250E+H - - - — - 1.377 —1.377 +0.60D+0.60W+0.60H 0.286 0.286 -460D+0.70E+0.60H 0.286 0.286 D Only 0.477 0.477 Lr Only L Only 1.200 1.200 S Only W 0" E Only H Only !� DHP Engineering, PS Project Title: Ri Shore t! It, Imo. ■ Structrual Building ConsulW Engineer. Project @: 6.047 a ; 1 32008 32nd Ave South, Suite B Project Descr: Fire Damaged Crawl Space Framing 100,201 Federal Way, WA 98001 Wood Species : Douglas Fir - Larch Fc - Perp 625.0 psi Wood Grade : No.2 Fv 180.0 Ft 575.0 pi psi Density 31.20 pcf Beam Bracing : Beam is Fully Braced against lateral -torsional buckling DO,15)L(0 41 T T ► T X PC 5.0X70 t Wood Beam Fid=i:as„5,cF-s,RaxaFa N.Ec6 Applied Loads ENERCALC, INC. 1983-2016, Build:6.16.6.7, Ver:6.16.6.7 Lic#; 0600 DHP ENGINEERING'! Description: Floor Beam 6x8 Assumed #2 OF Fire Reduced 114" each side and 1 P2" at bottom CODE REFERENCES Uniform Load, D = 0.0150, L = 0.040 ksf, Tributary Width =10.0 ft, (Floor) Calculations per NDS 2012, IBC 2012, CSC 2013, ASCE 7-10 Load Combination Set: ASCE 7-10 Material Properties - ` Analysis Method: Allowable Stress Design Fb - Tension 900.0 psi E: Modulus of Elasticity Load Combination ASCE 7-10 Fb - Compr 900.0 psi Ebend- xx 1,600.0 ksi Fc - PHI 1,350.0 psi Eminbend - xx 580.0 ksi Wood Species : Douglas Fir - Larch Fc - Perp 625.0 psi Wood Grade : No.2 Fv 180.0 Ft 575.0 pi psi Density 31.20 pcf Beam Bracing : Beam is Fully Braced against lateral -torsional buckling DO,15)L(0 41 T T ► T X PC 5.0X70 Vertical Reactions Load Combination Overall WAMUm Overall MINimum +D+H +D+L+H +D+Lr+H +D+S+H +D+0.750Lr+0.750L+H +D+0.750L+0.750S+H +D+0,60W+H +D+0.70E+H +D+0.750Lr+0.750L+0.450W+H +D+0.750L+0.750S+0.450W+H Support rotation: Far left is #1 Values in KIPS Support 1 Support 2 1.673 - 1.673 - ---- 0.284 0.284 0.473 0.473 1.673 1.673 0.473 0.473 0.473 0.473 1.373 1.373 1.373 1.373 0.473 0.473 0.473 0.473 1.373 1.373 1.373 1.373 BPert = 8-0 ft Applied Loads Service loads entered Load Factors will be applied for calculations Beam self weight calculated and added to loads Uniform Load, D = 0.0150, L = 0.040 ksf, Tributary Width =10.0 ft, (Floor) DESIGN SUMMARY ` Maximum Bending Stress Ratio = 0.8151 1 Maximum Shear Stress Ratio = 0.323 :1 Section used for this span 5.0 X 7.0 Section used for this span 5.0 X 7.0 tb : Actual _ 737-38psi tv : Actual 5&08 psi FB: Allowable = 900.00psi Fv Allowable 180.00 psi Load Combination +D+L+-H Load Combination +D+l_ Location of maximum on span = 3.000ft Location of maximum on span = 0.000 It Span # where maximum occurs = Span # 1 Span # where maximum occurs = Span # 1 Maximum Deflection Max Downward Transient Deflection 0.051 in Ratio= 1403>=360 Max Upward Transient Deflection 0.000 in Ratio= 0 <360 Max Downward Total Deflection 0.072 in Ratio= 1006>=240 Max Upward Total Deflection 0.000 in Ratio = 04240.0 Vertical Reactions Load Combination Overall WAMUm Overall MINimum +D+H +D+L+H +D+Lr+H +D+S+H +D+0.750Lr+0.750L+H +D+0.750L+0.750S+H +D+0,60W+H +D+0.70E+H +D+0.750Lr+0.750L+0.450W+H +D+0.750L+0.750S+0.450W+H Support rotation: Far left is #1 Values in KIPS Support 1 Support 2 1.673 - 1.673 - ---- 0.284 0.284 0.473 0.473 1.673 1.673 0.473 0.473 0.473 0.473 1.373 1.373 1.373 1.373 0.473 0.473 0.473 0.473 1.373 1.373 1.373 1.373 ! DHP Engineering, PS Structrual Building Consul a' - 32008 32nd Ave South, Suite B P �1 Federal Way, WA 98001 Wood Beam Project Title: Ri Shore Engineer. Project ID; ,16.047 Project Descr Fire amaged Crawl Space Framing ;.,fev 15 JUN 20,.,, 2 at,rp< File = 1:0115\1 51 CRF-51RW0-N.EC6 ENERCALC, INC. 1983-2016, Buiid:6.16.6.7, Ver..6.16.6.7 Values in KIPS Description ; Floor Beam 66 Assumed #2 OF Fire Reduced 1/4" each side and 112' at bottom Vertical Reactions Support notation : Far left is #1 -------._..._--- Load Combination Support 1 Support 2 +O+0.7501-+O7508+0.5250E+H _ ___ ---- --- 1.373 - 1.373 +0.60D+0.60W+0.60H 0.284 0.284 +0.60D+0.70E+0.60H 0.284 0.284 D Only 0.473 0.473 Lr Only L Only 1.200 1,200 S Only W Only E Only H Only ;.,fev 15 JUN 20,.,, 2 at,rp< File = 1:0115\1 51 CRF-51RW0-N.EC6 ENERCALC, INC. 1983-2016, Buiid:6.16.6.7, Ver..6.16.6.7 Values in KIPS �M. CITY OF >. Federal Way � PERMIT*APPLkq�� EpN PERMIT NUMBER 1(o _ /o 3;(44 _ MF JUN 29 2016 TARGET DATE CITY OF FEDFRAI . WAY LDS SITE ADDRESS SUITE/UNIT # g / i .. i S d Pl S Lu F de l u-.1 � �r 1 c�r c.e/ S Act d � f R um � C1 PROJECT VALUATION ZONING AS SOR'S TAX/PAR EL # -5 0 ® 6 (-;