Loading...
16-104775City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 F t , r 1 7 Building - Single Family Permit #:16 -104775 -00 -SF Inspection Request Line: (253) 835-3050 Project Name: LONG Project Address: 804 S 296TH PL Parcel Number: 515160 0565 Project Description: ADD - Construction of a 450 square foot addition to existing single family residence. No plumbing or mechanical. Owner Applicant Contractor Lender ERIC LONG ERIC LONG OWNER IS CONTRACTOR OWNER IS LENDER 804 S 296TH PL 804 S 296TH PL New / Additional Sq. Feet - Deck............... .. 00e..... 0 FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Mechanical to be Included? ..................................... No Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: 0 Floor Area (sq. ft.) 0.00 0.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 450 New / Additional Sq. Feet - 2nd Floor.................... 0 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement.................... 0 Occupancy #1 - Construction Type ......................... Type V - B New / Additional Sq. Feet - Deck............... .. 00e..... 0 New / Additional Sq. Feet - Garage ........................ 0 Mechanical to be Included? ..................................... No Number of Stories ................................................... I New / Additional Sq. Feet - Other........................... 0 Is this an Online or O.T.C. application? .................. No Plumbing to be Included?........................................ No New / Additional Sq. Feet - Total ........................... 450 Occupancy #1 - Use ................................................ Residence (I or 2 family) Comprehensive Plan Designation ........................... SF - High -Density Residential Total Valuation: 50,692.50 \ �v PERMIT EXPIRES Monday, 28 August, 2017 Permit Issued on Wednesday, March 1, 2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. / Owner or agent:�� i C1 -Y OF Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 16 104775 00 Address: 804 S 296TH PL ERIC LONG FEDERAL WAY WA 98003-3728 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® SWM Precon Site Mtg (4400) ® Initial Erosion Control (4365) ® Footings/Setback (4110) off and approved. IBC 109.3.4 Approved To be done PRIOR to breaking ground Gypsum Wallboard Nailing (4130) Approved to place concrete By Date By Date By Date, - 4 Foundation Wall (4115) ® Drainage/Downspout (4040) ® Slab/Concrete Floor (4255) off and approved. IBC 109.3.4 Approved to place concrete Approved to backfill Gypsum Wallboard Nailing (4130) Approved to place concrete By Date By Date By Date 0 Underfloor Framing (4285) 0 Floor Sheathing (4105) ® Shear Walls (4245) off and approved. IBC 109.3.4 Approved to sheath floor Approved to install flooring Gypsum Wallboard Nailing (4130) Approved to install siding By Date B a l -r By Date ByAIJDate t i h Prior to scheduling a Framing inspection; Roof Sheathing (4220) .l .t Fire/Draft Stops (4095) lz Interim Erosion Control (4370) off and approved. IBC 109.3.4 Approved to install roofing Approved Gypsum Wallboard Nailing (4130) Approved By i,,j Date 9111 By Date 7 1 I By Date Prior to scheduling a Framing inspection; 13 Electrical, Plumbing & Mechanical Rough -in E] and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 By Approved Gypsum Wallboard Nailing (4130) Approved to install mud & tape rBy By h8J Date ((G I lU Approved Framing (4120) Approved to insulate Date V Final Erosion Control (4375) Approved Date 14 Insulation (4150) Approved to install wallboard By 4,�J Date II1I El Final - Building (4050) C Date ''1 I yl�l l D Rough Electrical E] Final Electrical Right of Way Approved Approved Approved By Date By Date By Date f � r CHUDGAR ENGINEERING COMPANY Civil & Structural Engineers 1510 140' Ave NE Suite 203 Bellevue WA 98005 Phone: (425) 590-9650 Building Inspector City of Federal Way August 31, 2017 Project: Long; 804 South 296"' Place Federal Way This is in response regarding Building Inspector comment of 2x6 rafters spaced at 12 inches on center used on roof. 2x6 Rafters at 12 inches spacing may be used in lieu of 2x8 rafters spaced at 16 inches as shown on Roof Framing Plan. See attached calculation for 2x6 rafters at 12 inches spacing. Let us know if you have questions or comments. Sincerely, Samir Chudgar, P.E., S.E. Chudgar Engineering Company Page 1 Wood Beam File=C:\Samuel\Chudgar\Jobs\XFEDER-1\CALCUL-1\Enercalc\FEDERA-1.EC6 ENERCALC, INC. 1983-2017, Build:10.17.8.29, Ver:10.17.8.29 Description : 2x6 Rafter @12" Spa. CODE REFERENCES Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10 Load Combination Set: IBC 2015 Material Properties Analysis Method: Allowable Stress Design Fb + 1,200.0 psi E: Modulus of Elasticity C L Load Combination iBC2015 Fb- 1,200.0 psi Ebend-xx 1,600.Oksi +D+H Fc - Prll 1,000.0 psi Eminbend - xx 580.0 ksi Wood Species : Douglas Fir - Larch Wood Grade : No.1 Fc - Perp 625.0 psi Fv 170.0 psi Ft 825.0 psi Density 31.20pcf Beam Bracing : Completely Unbraced D(0.015) S(0.025) 0.00 0.00 0.00 Length =11.250 ft 1 0.415 0.103 0.90 1.300 1.00 1.00 2x6 1.00 0.72 0.27 Span = 11.250 ft 1014.27 0.09 Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loads Uniform Load: D = 0.0150, S = 0.0250 ksf, Tributary Width =1.0 ft, (Roof Load) 1.300 1.00 DESIGN SUMMARY 1.00 ' ' • Maximum Bending Stress Ratio = 0.9821 Maximum Shear Stress Ratio = 0.201 :1 Section used for this span 2x6 Section used for this span Length = 11.250 ft 2x6 fb : Actual = 1,049.00psi fv : Actual = 39.31 psi FB : Allowable = 1,067.75psi Fv: Allowable = 195.50 psi Load Combination +D+S+H Load Combination 421.42 +D+S+H Location of maximum on span = 5.625ft Location of maximum on span = 10.798ft Span # where maximum occurs = Span # 1 Span # where maximum occurs = Span # 1 Maximum Deflection 1.00 1.00 1.00 Max Downward Transient Deflection 0.272 in Ratio= 495>=360 Max Upward Transient Deflection 0.000 in Ratio= 0 <360 0.00 0.00 Max Downward Total Deflection 0.455 in Ratio= 296>=180 0.390 0.074 Max Upward Total Deflection 0.000 in Ratio= 0 <180 1.00 1.00 Maximum Forces & Stresses for Load Combinations Load Combination Max Stress Ratios Segment Length Span # M V C d C FN C i Cr C m C t C L Moment Values M fb F'b V Shear Values fv F'v +D+H 0.00 0.00 0.00 0.00 Length =11.250 ft 1 0.415 0.103 0.90 1.300 1.00 1.00 1.00 1.00 0.72 0.27 421.42 1014.27 0.09 15.79 153.00 +D+L+H 1.300 1.00 1.00 1.00 1.00 0.72 0.00 0.00 0.00 0.00 Length = 11.250 ft 1 0.405 0.093 1.00 1.300 1.00 1.00 1.00 1.00 0.67 0.27 421.42 1041.60 0.09 15.79 170.00 +D+Lr+H 1.300 1.00 1.00 1.00 1.00 0.67 0.00 0.00 0.00 0.00 Length = 11.250 ft 1 0.390 0.074 1.25 1.300 1.00 1.00 1.00 1.00 0.55 0.27 421.42 1079.34 0.09 15.79 212.50 +D+S+H 1.300 1.00 1.00 1.00 1.00 0.55 0.00 0.00 0.00 0.00 Length = 11.250 It 1 0.982 0.201 1.15 1.300 1.00 1.00 1.00 1.00 0.60 0.66 1,049.00 1067.75 0.22 39.31 195.50 +D+0.750Lr+0.750L+H 1.300 1.00 1.00 1.00 1.00 0.60 0.00 0.00 0.00 0.00 Length =11.250 ft 1 0.390 0.074 1.25 1.300 1.00 1.00 1.00 1.00 0.55 0.27 421.42 1079.34 0.09 15.79 212.50 +D+0.750L+0.750S+H 1.300 1.00 1.00 1.00 1.00 0.55 0.00 0.00 0.00 0.00 Wood Beam File=C:\Samuel\ChudgahJobs\XFEDER-1\CALCUL-1\Enercalc\FEDERA-1.EC6 ENERCALC, INC. 19832017, Build: 10.17.8.29, Ver:10.17.8.29 KW -06009203 Description : 2x6 Rafter @12" Spa. Load Combination Max Stress Ratios Segment Length Span # M V Moment Values Cd CFN CI Cr Cm C t CL M fb F'b Shear Values V fv F'v • I i Length = 11.250 ft 1 0.836 0.171 1.15 1.300 1.00 1.00 1.00 1.00 0.60 0.56 892.11 1067.75 0.18 33.43 195.50 +D+0.60W+H 0.094 +D+S+H 0.235 1.300 1.00 1.00 1.00 1.00 0.60 0.200 +D+0.60W+H 0.00 0.00 0.00 0.00 Length = 11.250 ft 1 0.382 0.058 1.60 1.300 1.00 1.00 1.00 1.00 0.44 0.27 421.42 1102.62 0.09 15.79 272.00 +D+0.70E+H 0.094 0.094 Lr Only 1.300 1.00 1.00 1.00 1.00 0.44 0.141 0.141 0.00 0.00 0.00 0.00 Length = 11.250 ft 1 0.382 0.058 1.60 1.300 1.00 1.00 1.00 1.00 0.44 0.27 421.42 1102.62 0.09 15.79 272.00 +D+0.750Lr+0.750L+0.450W+H 1.300 1.00 1.00 1.00 1.00 0.44 0.00 0.00 0.00 0.00 Length = 11.250 ft 1 0.382 0.058 1.60 1.300 1.00 1.00 1.00 1.00 0.44 0.27 421.42 1102.62 0.09 15.79 272.00 +D+0.750L+0.750S+0.450W+H 1.300 1.00 1.00 1.00 1.00 0.44 0.00 0.00 0.00 0.00 Length = 11.250 ft 1 0.809 0.123 1.60 1.300 1.00 1.00 1.00 1.00 0.44 0.56 892.11 1102.62 0.18 33.43 272.00 +0+0.750L+0.750S+0.5250E+H 1.300 1.00 1.00 1.00 1.00 0.44 0.00 0.00 0.00 0.00 Length = 11.250 ft 1 0.809 0.123 1.60 1.300 1.00 1.00 1.00 1.00 0.44 0.56 892.11 1102.62 0.18 33.43 272.00 +0.60D+0.60W+0.60H 1.300 1.00 1.00 1.00 1.00 0.44 0.00 0.00 0.00 0.00 Length = 11.250 ft 1 0.229 0.035 1.60 1.300 1.00 1.00 1.00 1.00 0.44 0.16 252.85 1102.62 0.05 9.47 272.00 +0.60D+0.70E+0.60H 1.300 1.00 1.00 1.00 1.00 0.44 0.00 0.00 0.00 0.00 Length = 11.250 ft 1 0.229 0.035 1.60 1.300 1.00 1.00 1.00 1.00 0.44 0.16 252.85 1102.62 0.05 9.47 272.00 Overall Maximum Deflections Load Combination Span Max. "" Defl Location in Span Load Combination Max. "+" Defl Location in Span +D+S+H 1 0.4552 5.666 0.0000 0.000 Vertical Reactions Support notation : Far left is #1 Values in KIPS Load Combination Support 1 Support 2 Overall MAXimum 0.235 0.235 Overall MINimum 0.141 0.141 +D+H 0.094 0.094 +D+L+H 0.094 0.094 +D+Lr+H 0.094 0.094 +D+S+H 0.235 0.235 -D+0.750Lr+0.750L+H 0.094 0.094 +D+0.750L+0.750S+H 0.200 0.200 +D+0.60W+H 0.094 0.094 +D+0.70E+H 0.094 0.094 +D+0.750Lr+0.750L+0.450W+H 0.094 0.094 +D+0.750L+0.750S+0.450W+H 0.200 0.200 +D+0.750L+0.750S+0.5250E+H 0.200 0.200 +0.60D+0.60W+0.60H 0.057 0.057 +0.60D+0.70E+0.60H 0.057 0.057 D Only 0.094 0.094 Lr Only L Only S Only 0.141 0.141 W Only E Only H Only 1% CITY OF Federal Way PERMIT NUMBER 1(to 0"' PERMI*APPLICATION SEP 2 S 2016 PERMIT CENTER + 33325 811, Avenue South + Federal Way, WA 98003-6325 253-835-2607 + FAX 253-835-2609 + pen-nitcenter@cityoffederalway.com CITY OF FEDERAL WAY TARGET DATE 2 " 14 SITE ADDRESS g04 S z y 6 tL , Qj W �JA 9 J&3 SUITE/UNIT # PROJECT VALUATION $ ZONING ASSESSOR'S /PARCEL # 1 b_ S � 5 TYPE OF PERMIT AUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT PROJECT DESCRIPTION Detailed description of work to be included on this permit only NAME =PRI PHONE 6G PROPERTY OWNER MAILING RESS E- L CITY e FSZT1 ZIP W& 7 V �� '- NAME ��J Ll V� PHONE MAILING ADDRESS E-MAIL CONTRACTOR CITY "c STATE ZIP FAX -.— WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # NAME �p PRIMARY PHONE MAILING ADDRESS E-MAIL APPLICANT- CITY 1!� STATE ZIP FAX PROJECT CONTACT NAME IV6 PRIMARY HONE - >Gt 0 MAILING ADDRESS E-MAIL ^ J (The individual to receive and respond to all correspondence CITY STATE ZIP FAX (� concerning this application) PROJECT FINANCING NAME C— NC OWNER -FINANCED MAILING @pDRESS, CITY, STATE, ZIP ' '"" PHONE When value is $5,000 or more (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the citu as a part of this application. o� % SIGNATURE: DATE PRINT NAME: EA l ' ^ / " Bulletin #100 — January 29, 2016 Page 1 of 2 k:\Handouts\Permit Application . 61)lt `sf MECHANICAL PERMIT Indicate how many of ea. _ AIR HANDLING UNITS _ AIR CONDITIONER _ BOILERS _ COMPRESSORS DUCTING A/,//4 ,//4 Ffixture to be installed or rel FANS FIREPLACE INSERTS FURNACES GAS LOG SETS GAS PIPING VALUE OF MECHANICAL WORT' El f this project. Do not include GAS PIPE OUTLETS _ HOODS (commercial) HOT WATER TANKS (Gas) REFRIGERATION SYST WOODSTOVES g factures to remain. OTHER (Describe) PLUMBING PERMIT /U /,A EXISTING VA LUE OF PLUMBING WORK Indicate how many o each type o re to be installed or relocated as part o this project. Do not include existing res to remain. BATHTUBS (or Tub/Shower Combo) LAVS (Hand Sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS SHOWERS VACUUM BREAKERS SECOND FLOOR DRINKING FOUNTAINS SINKS (Kitchen/utility) WATER HEATERS (Electric) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES # of Stories ................ ---... -....................... _......._......_...__...__..._....._......._._._............_..........._._ DECK GENERAL INFORMATION ...... _... _....... ...... _........ ...... ........... _..__.._................ _...... _............ --..._....---................... _._........ .... _.. GARAGE ❑ CARPORT ❑ CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS /U iA PROJECT AREA ONLY K� $ 0 EXISTING/PREVIOUS USE LOT SIZE )In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? SF ► ( ESTIMATED SELLING PRICE $ ❑ Yes No ❑ Yes / No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION (in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT NEW BUILDING ........._.. ... _..... ..... _...... --..................... ..........................._..................... .............................. ____ .......... ............... FIRST FLOOR (or Mobile Home) ADDITION .................................... _.......... _....... _._..... __.............. _.._........ _....... __...-.__................. _............ _._.......... .... SECOND FLOOR COMMERCIAL — REMODEL/TENANT IMPROVEMENTS ......................_........ ............ _...__...__.__._...... _............... _.................. I .... __...................... COVERED ENTRY' Occupancy Group(s) Construction a # of Stories ................ ---... -....................... _......._......_...__...__..._....._......._._._............_..........._._ DECK ...... _... _....... ...... _........ ...... ........... _..__.._................ _...... _............ --..._....---................... _._........ .... _.. GARAGE ❑ CARPORT ❑ TENANT AREA ONLY ................ _.._..... _......... _............. __...----........ __.......... _................... --... ............ ._.._._........... _ OTHER (describe) PROJECT AREA ONLY Area Totals EXISTING PROPOSED ,1,0 .............. _.............. .................................. _...... _.._.--......... _..............................__.......I.................._. **NEW HOMES ONLY** ESTIMATED SELLING PRICE $ # OF BEDROOMS COMMERCIAL — NEW/ADDITION AREA DESCRIPTION Area in Square Feet Occupancy Group(s) Construction a # of Stories Additional Information NEW BUILDING ADDITION COMMERCIAL — REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area in Sq are Feet Occupancy Group(s) Construction a # of Stories Additional Information TOTAL BUILDING TENANT AREA ONLY PROJECT AREA ONLY Bulletin #100 —January 29, 2016 Page 2 of 2 k:\Handouts\Permit Application