Loading...
11-104978rPlumbing City y & Perot #: 11-104978-00-P L Federal Way Community Econ. ev. Services FILE 33325 8th Ave S 40 '�-- Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BELLAH Project Address: 33020 10TH AVE SW UNIT H2O1 Parcel Number: 420500 0410 Project Description: change out 1 electric water heater Owner Applicant Contractor DONNA BELLAH TOM HAGAR WASHINGTON WATER HEATERS INC 33020 10TH AVE SW UNIT H2O1 WASHINGTON WATER HEATERS INC WASHII*9800P (9/17/12) FEDERAL WAY WA 98023 1800 RICHARDS RD SUITE A 1800 RICHARDS RD SUITE A BELLEVUE WA 98005 BELLEVUE WA 98005 hd yo 3'`y� ✓ Ay�,j ... 43y �:„a%, . �.. .�.. ti ..a .;� .�,, .6,` y; Water Heaters ................................. 1 PERMIT EXPIRES Saturday, June 16, 2012 Permit Issued on Monday, December 19, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. I I I 1k 119 Owner or agent:0. 0 EM Date: 97(r* 4110112o CITY OF Federal Way PERMIT #: Project: THIS CARD IS TO MAIN ON-SITE Construction In ection Record INSPECTION REQUE TS: (253) 835-3050 11 -104978 -00 -PL Address: 33020 10TH AVE SW UNIT H2O1 DONNA BELLAH ALL WAY, WA 98023-5053 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going Inspections are logged on the back of this card. rl Final - Plumbing (4075) Approved By Date FILE Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 1:1Approved Gas Piping (4125) Approved to cover Right of Way Approved Approved Date Approved to release test By Date By Date By Date rl Final - Plumbing (4075) Approved By Date FILE Rough Electrical Approved 1:1Approved Final Electrical Right of Way Approved By Date By Date By Date