11-104978rPlumbing
City y & Perot #: 11-104978-00-P L
Federal Way
Community Econ. ev. Services FILE
33325 8th Ave S 40 '�--
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: BELLAH
Project Address: 33020 10TH AVE SW UNIT H2O1 Parcel Number: 420500 0410
Project Description: change out 1 electric water heater
Owner
Applicant
Contractor
DONNA BELLAH
TOM HAGAR
WASHINGTON WATER HEATERS INC
33020 10TH AVE SW UNIT H2O1
WASHINGTON WATER HEATERS INC
WASHII*9800P (9/17/12)
FEDERAL WAY WA 98023
1800 RICHARDS RD SUITE A
1800 RICHARDS RD SUITE A
BELLEVUE WA 98005
BELLEVUE WA 98005
hd yo 3'`y� ✓
Ay�,j ... 43y �:„a%, . �.. .�.. ti ..a .;� .�,, .6,`
y;
Water Heaters ................................. 1
PERMIT EXPIRES Saturday, June 16, 2012
Permit Issued on Monday, December 19, 2011
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
I I I 1k 119
Owner or agent:0. 0 EM Date:
97(r* 4110112o
CITY OF
Federal Way
PERMIT #:
Project:
THIS CARD IS TO MAIN ON-SITE
Construction In ection Record
INSPECTION REQUE TS: (253) 835-3050
11 -104978 -00 -PL Address: 33020 10TH AVE SW UNIT H2O1
DONNA BELLAH ALL WAY, WA 98023-5053
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going Inspections are logged on the back of this card.
rl Final - Plumbing (4075)
Approved
By Date
FILE
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
1:1Approved
Gas Piping (4125)
Approved to cover
Right of Way
Approved
Approved
Date
Approved to release test
By
Date
By
Date
By
Date
rl Final - Plumbing (4075)
Approved
By Date
FILE
Rough Electrical
Approved
1:1Approved
Final Electrical
Right of Way
Approved
By
Date
By
Date
By
Date