Loading...
13-100595City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BRIGHTON PARK LOT 18 Project Address: 36437 10TH CT SW Project Description: New construction low volt T-Stat 0 Xlellatrical Permit #: 13 -100595.00 -EL Inspection Request Line: (253) 835-3050 Parcel Number: 111263 0180 Owner Aunlicant Contractor NORRIS HOMES INC JENNIFER REDLEVSKE SOUND HEATING & A/C (ELECTRICAL) 2053 FABEN DR SOUND HEATING & A/C INC SOUNDHAO06DA (5/17/14) MERCER ISLAND WA 98040 5526 184TH ST E 5526 184TH ST E SUITE A PUYALLUP WA 98375 PUYALLUP WA 98375 Is this an Online or O.T.C. application?.................Yes Electrical Fixtures' Thermostat ..................................... 2 Is Use Educational or Institutional? ....................... No PERMIT EXPIRES Saturday, February 7, 2015 Permit Issued on Thursday, February 7, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: A% is CITY OF Federal Way PERMIT #: 13 -100595 -00 -EL Project: NORRIS HOMES INC THIS CARD IS TO 7S:1253) ON-SITE Construction In on Record INSPECTION REQUE 835-3050 Address: 36437 10TH CT SW FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Pool Bonding (4195) Approved By Date ❑ Temporary Power (4275) Approved By Date UFER Ground (4295)Ditch cover (4030) By Slab/Concrete Floor (4255) Ceiling Cover (4020) Approved Approved Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) Approved By Date ❑ Temporary Power (4275) Approved By Date 0 Service (4235) Approved By Date 0 Feeders/Sub-panels (4045) 0 Rou b Electrical (4225) Final Electrical Approved Ceiling Cover (4020) Right of Way Approved Approved Date Approved By Date Approved By Date By Date _ By Date 13 Final - Electrical (4055) Approved By Date v? — SITE Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date