Loading...
14-102625r i electrical City of Federal Way FILE Community &Econ. Dev. Services Permit #: 14 -102625 -00 -EL 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line: (2 53) 835-3050 Project Name: BRIGHTON PARK LOT 9 Project Address: 36418 10TH CT SW Parcel Number: 111263 0090 Project Description: NEW 200AMP SERVICE 2853 SQ FT Owner A1212lican Contractor CURTIS LANG CUSTOM HOMES AUDREY GIRON MERIDIAN CENTER ELECTRIC INC 27203 216TH AVE SE SUITE 5 MERIDIAN CENTER ELECTRIC MERIDCE318SG (2/28/15) MAPLE VALLEY WA 98038 11109 66TH AVE E 11109 66TH AVE E PUYALLUP WA 98373 PUYALLUP WA 98373 Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional?....................... No Electrical Fixtures New Service: Residential ............... 1 PERMIT EXPIRES Tuesday, December 2, 2014 Permit Issued on Thursday, June 5, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent:f%L1111J=Date: FINALED.- CITY OF ' Federal a Way PERMIT #: Project: TI IS CARD IS TOMAIN ON-SITE Construction In ection Reco d INSPECTION REQU TS: (253) 835-3050 14 -102625 -00 -EL Address: 36418 10TH CT SW CURTIS LANG CUSTOM HOMES FEDERAL WAY, WA Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to seq iential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved, Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of I iis card. TUFER Ground (4295) Ditch cover (4030) Sla /Concret Floor (4255) Approved Approved Approved to pl concrete Date L._ t UBy Date By Da e -l4 Pool Bonding (4195) 0 Temporary Power (4275) Final Electrical Approved Approved Right of Way Approved Approved Date By Date Date By Date By Feeders/Sub-panels (4045) ® E]Rough Electrical (4225) E] Approved Approved By Date B ��Date _ t� By_zzj—<< Final - Electrical (4055) Approved Date 1 z 1 -l4 Rough Electrical Approved1:1 Final Electrical Approved Right of Way Approved By Date By Date By Date