Loading...
15-102046wilding - Single Family Cityof'Way Permit #: 15 -102046 -00 -SF Community&Econ. Econ. Dev. Services 33325 8th Ave S Federal way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Project Name: NELSON Project Address: 34806 10TH PL SW Parcel Number: 542243 0050 Project Description: REP - Tear off shake roofing; install 1/2" CDX sheathing and composition shingle roofing system. Owner Awn Contractor Lender JENNIFER NELSON CHET S ROOFING & CHET'S ROOFING & 3480610TH PL SW CONSTRUCTION CONSTRUCTION FEDERAL WAY WA 98023 26301 79TH AVE S CHETSRC924BB (1/4/16) KENT WA 98032 26301 79TH AVE S KENT WA 98032 Census Category: 555 - Non-structural roofing permits Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load Floor Areas . ft. 0 0 1 0 0 Additional Permit Information New / Additional Sq. Feet - 3rd Floor....................0 New / Additional Sq. Feet - Basement ................... 0 Occupancy # I - Construction Type .......................Type V - B Mechanical to be Included? ................................... .No Occupancy # 1 - Class.............................................R-3 Plumbing to be Included? ....................................... No Occupancy # 1 -Use ............................................... Residence (1 or 2 family) No Fixtures Associated With This Permit 11 PERMIT EXPIRES Sunday, October 25, 2015 Permit Issued on Tuesday, April 28, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: !� CITY OF 441 g� Federal Way PERMIT #: 15 -102046 -00 -SF THIS CARD IS TOIN ON-SITE Construction In ection Record INSPECTION REQUE TS: (253) 835-3050 Address: 34806 10TH PL SW Project: JENNIFER NELSON FEDERAL WAY, WA 98023-8100 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ SWM Precon Site Mtg (4400) ❑ Initial Erosion Control (4365) ❑ Footings/Setback (4110) ❑ Underfloor Framing (4285) Approved By To be done prior to breaking ground Approved to place concrete By Date By Date By Date ❑ Rough Electrical Approved Floor Sheathing (4105) ❑ Final Electrical Approved Shear Walls (4245) install ❑ Underfloor Framing (4285) Approved to sheath floor By Approved to install flooring By Approved to siding By Date By Date By Date Interim Erosion Control (4370) Fire/Draft Stops (4095) Roof S thing (4220) A ed to install roofing Approved Approved B Date _ By Date By Date 4/ Insulation (4150) Framing (4120) Fraing inspection; Prior to scheduling to insulate Approved to install wallboazd Electrical, Plumbing & anical Rough in andApproved �echm ire/Draft Stop inspectis must be signed -off and By Date By Date approved IBC 1o9.3.4 Gypsum Wallboard Nailing (4130) ❑ Final - Building (4050) ❑ Final Erosion Control (4375) Approved to install mud & tape Approved Approved By Date By Date By Date ❑ Rough Electrical Approved ❑ Final Electrical Approved ❑ Right of Way Approved By Date By Date By Date MY OF V& Federal Way APB 2015 PERMITI*APPLICATIQN / CITY OF FEDERAL WAY old CDS n7b PzpmT NUMBER ` TARGET DATE SITE ADDRESS L5'w 1;;c&rr'/ 4j0 y �v>4 q U23 SUMMIT IF PROJECTVALUATION ZONING ASSESSOR'S TAR/PARCEL # TYPE OF PERMIT 0 BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT l je,&oo f .S-- 7_&D PROJECT DESCRIPTION Detailed description of u)ork toladaej. "C Anna" be included on this permit only PROPERTY OWNER N�/(;/1/J/ lt*'I'— /it`ft)/'l PRIMARY IONS 4100& Jf6� MAILING ADDRESS gvua f► l f� E-MAIL CITY STAT ZIP i' ctJa Gt/► 9d�Z3 NAME o et n `� �OZf 1nZ53 PHONE MADaxaADaR�s Ae, GAe'1,f 6 �& elol CONTRACTOR CITY $TAIL �i/i•/`A ZIP�� ? FAX i'lS:/ t!/ WA STATE CONTRACTOR'S LICENSE # C�[T EX ��7P7IRATION DATE 7` / c) FEDERAL WAY BUSINESS LICENSE # NAME PRIMARY PHONE APPLICANT MAILING ADDRESS E•MAM CITY STAT$ ZIP - FAX PROJECT CONTACT NAME 61qe< C h /r i e t f nJ1c PRIMARY PHONE 5 (The individual to receive and MAILING ADDRESS It -MAIL respond to all correspondence CITY STATE I ZIP FAX concerning this application) PROJECT FINANCING NAME 0 OWNER -FINANCED Required value of $5, 000 or more (RCW 19.27.095) MAUJNG ADDRESS, QTY, STATE, ZIP PHONE I certify under penalty of perjury that I am the property owner or authorised agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certVV that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City 4f Federal Way as to any claim (including costs, expenses, and attornegs' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and flied against the city, but only where such claim arises out of the reliance of the city, including its ga'lcers and employees, upon the accuracy of the injormation supplied to the city as apart of this application. SIGNATURE: DATE PRINT NAME: Bulletin #100 January 1, 2013 Page i of 3 k:\Handouts\Permit Application M