Loading...
17-106069City of Federal Way Applicant Community Development Dept. YOUNGYUL NA 33325 8th Ave S FILE Federal Way, WA 98003 MTL/RFG CO INC Ph: (253) 8352607 Fax (253) 8352609 FEDERAL WAY WA 98001 Project Name: NA Project Address: 3104 S 337TH ST Project Description: Run thermostat wire for new single family residence C Electrical Permit #:17 -106069 -00 -EL Inspection Request Line: (253) 835-3050 Parcel Number: 442060 0025 Owner Applicant Contractor YOUNGYUL NA PATTY MATHUSZCHEHALIS SHEET CHEHALIS SHEET MTL/RFG CO INC 3906 S 322ND ST MTL/RFG CO INC (ELECTRICAL) FEDERAL WAY WA 98001 6135 CAPITOL BLVD SW CHEHASM008DA (5/19/18) TUMWATER WA 98512 350 SW RIVERSIDE AVE CHEHALIS WA 98532 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Thermostat 1 PERMIT EXPIRES Wednesday, 26 December, 2018 Permit Issued on Tuesday, December 26, 2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of W ngt andilhe City of Federal Way. Owner or agent: Date: y THIS CARD IS TO REMAIN ON-SITE • Fycw, Vlt� Construction Inspection Record Y INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 17106069 00 Address: 3104 S 337TH ST Project: YOUNGYUL NA FEDERAL WAY WA Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 711 UFER Ground (4295) Q Ditch cover (4030) El Slab/Concrete Floor (4255) Approved Approved Approved 1BY Approved to place concrete By Date By Date By Date ® Pool Bonding (4195) El Temporary Power (4275) ® Service (4235) Approved Approved Approved By Approved By Date By Date By IDate ® Final - Electrical (4055) Approved ByLJL,-%Date „t Feeders/Sub-panels (4045) ® Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved Approved By Date ' p ! ^ By CSN W � Date AO -4 By Date ® Final - Electrical (4055) Approved ByLJL,-%Date „t Rough Electrical 13 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date