Loading...
16-105979City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 IAW Electrical Permit #:16 -105979 -00 -EL FILE Inspection Request Line: (253) 835-3050 Project Name: 34001 PACIFIC HWY S Project Address: 34001 PACIFIC HWY S Parcel Number: 202104 9051 Project Description: New Service Cabinet at 340th and Pacific Hwy S Owner Applicant Contractor PROGRESSIVE CASUALTY INSURANCE DAVID SINDINGAMAYA ELECTRIC AMAYA ELECTRIC PO BOX 89429 2519 S 104TH ST CT S AVE AMAYAE"274B3 (1/31/18) CLEVELAND OH 44101 LAKEWOOD WA 98499 PO BOX 98686 LAKEWOOD WA 98496-8686 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes New Service: 0 - 100 amps (Ct PERMIT EXPIRES Friday, 19 July, 2019 Permit Issued on Monday, January 23, 2017 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date:, crrr of . FederalWay PERMIT #: 16105979 00 THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Address: 34001 PACIFIC HWY S Project: PROGRESSIVE CASUALTY INSURi FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground (4295)❑ ® Ditch cover (4030) 0 Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding (4195) ® Temporary Power (4275) © Service (4235) Approved Approved Approved By Date By Date By Date El Feeders/Sub-panels (4045) ® Rough Electrical (4225) ® Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date 10 Final - Electrical (4055) Approved By Date E Rough Electrical 1 Final Electrical Right of Way Approved Approved Approved By Date 11 By Date By Date 4ATHIS CARD IS TO REMAIN ON-SITE cert Feorderal Way Construction Inspection Record y INSPECTION REQUESTS:(253)835-3050 PERMIT#: 16 105979 00 Address: 34001 PACIFIC HWY S Project: PROGRESSIVE CASUALTY INSURE FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground(4295) El Ditch cover(4030) 3❑ Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date ' 14 l By Date ® Pool Bonding(4195) ® Temporary Power(4275) ® Service(4235) Approved Approved Approved By Date By Date ! By 1V4 Date (1 1, 7❑ Feeders/Sub-panels(4045) ® Rough Electrical(4225) ® Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date 0 Final-Electrical(4055) auk_ Approved By Date 7/it S/Ig . •1 0 Rough Electrical El Final ElectricalEl Right of Way Approved Approved Approved By Date By Date By Date