12-102761City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: GEORGE
BILE
Project Address: 33106 11TH AVE SW
Project Description: Remove/replace gas water heater
` 0 Mechanical
Permit #: 12 -102761 -00 -ME
Inspection Request Line: (253) 835-3050
a o, 00
Parcel Number: 926495 0310
Owner
A1glicant
Contractor
JEREMIAH GEORGE
JULIE MILNE
FAST WATER HEATER CO (GENERAL)
BARBARA HERNANDEZ GEORGE
FAST WATER HEATER COMPANY
FASTWWH948BC (1/4/14)
33106 11TH AVE SW
12601 132ND AVE NE
12601 132ND AVE NE
FEDERAL WAY WA 98023-5321
KIRKLAND WA 98034
KIRKLAND WA 98034
Additional Kermit Information
Mechanical Valuation............................................1290.00 Is this an Online or O.T.C. application? ................. Yes
Mechanical Fixtures
Hot Water Tanks ............................ 1
PERMIT EXPIRES Saturday, December 15, 2012
Permit Issued on Monday, June 18, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: kiIT7Date:
PIN"la) ;P//O//&
THIS CARD IS To IN ON-SITE
CITY OF Construction 1n ection Record
Federal V1/ay INSPECTION REQUE TS: (253) 835-3050
PERMIT #: 12 -102761 -00 -ME Address: 33106 11TH AVE SW
Project: JEREMIAH GEORGE FEDERAL WAY, WA 98023-5321
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)Gas
Piping (4125)
Final Electrical
Approved
Final -Mechanical (4065)
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Date 7 /2,
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date