Loading...
12-102761City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: GEORGE BILE Project Address: 33106 11TH AVE SW Project Description: Remove/replace gas water heater ` 0 Mechanical Permit #: 12 -102761 -00 -ME Inspection Request Line: (253) 835-3050 a o, 00 Parcel Number: 926495 0310 Owner A1glicant Contractor JEREMIAH GEORGE JULIE MILNE FAST WATER HEATER CO (GENERAL) BARBARA HERNANDEZ GEORGE FAST WATER HEATER COMPANY FASTWWH948BC (1/4/14) 33106 11TH AVE SW 12601 132ND AVE NE 12601 132ND AVE NE FEDERAL WAY WA 98023-5321 KIRKLAND WA 98034 KIRKLAND WA 98034 Additional Kermit Information Mechanical Valuation............................................1290.00 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Hot Water Tanks ............................ 1 PERMIT EXPIRES Saturday, December 15, 2012 Permit Issued on Monday, June 18, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: kiIT7Date: PIN"la) ;P//O//& THIS CARD IS To IN ON-SITE CITY OF Construction 1n ection Record Federal V1/ay INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 12 -102761 -00 -ME Address: 33106 11TH AVE SW Project: JEREMIAH GEORGE FEDERAL WAY, WA 98023-5321 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)Gas Piping (4125) Final Electrical Approved Final -Mechanical (4065) Approved By Approved to release test Approved By Date By Date By Date 7 /2, Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date