Loading...
12-100946r "4 City of Federal Way Commun'dy & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax. (253) 835-2609 to Mechanical Permit #: 12 -100946 -00 -ME Inspection Request Line: (253) 835-3050 Project Name: YATES Project Address: 33118 13TH AVE SW Parcel Number: 9264951040 Project Description: REPLACE GAS FURNACE AND WATER HEATER Owner A121211can Contractor JANE YATES WESCO NORTHWEST PERMIT PACIFIC AIR SYSTEMS (GENERAL) 33118 13TH AVE SW NORTHWEST PERMIT/ WESCO PACIFAS093KA (9/8/13) FEDERAL WAY WA 98023-5324 1345 W GULF RD 12811 PACIFIC HWY SW POINT ROBERTS WA 98281 LAKEWOOD WA 98499 Additional Permit information Mechanical Valuation............................................6284.00 Is this an Online or O.T.C. application?................ Yes Mechanical Fixtures Furnaces ......................................... 1 Hot Water Tanks............................ 1 PERMIT EXPIRES Monday, August 27, 2012 Permit Issued on Wednesday, February 29, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and theCityof Federal Way. Owner or agent— Date: \-T ._ rT THIS CARD IS TOMAIN ON-SITE CITY OF - _ Construction In ection Record Federal Way V4SPECTION REQUE TS: (253) 835-3050 PERMIT #: 12 -100946 -00 -ME Address: 33118 13TH AVE SW Project: JANE YATES FEDERAL WAY, WA 98023-5324 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card Mechanical Rough -in (4165)Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date B Date ')i / Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date