90-101547CITY OF
FEDERAL WAY
#437
BUILDING PERMIT
BUILDING INSPECTION
941-1555
qp-- (plsy�-
90-1755 CA MILGARD MANUFACTURING
33009 1ST WAY S BLDG "A"
PERMIT NO. OWNER'S NAME
JOB ADDRESS
CONTRACTORRICEUMS 'CONST & PAIK�Aq 34016 9TH AVE S
BLDG D9 CONT. PHONE 838-1844/927-14
CONT. REG. NO.RICHACP132JA OWNER'S PHONE 682-1100 OWNER'S ADDRESPACIFIC-1-101 WESTERN-JAW1
TYPE JOB: NEW RESIDENCE ADDITION NEW INDUSTRIAL NEW COMMERCIAL COMMERCIAL ADD. INDUSTRIAL ADD. NEW PUBLIC PUBL 1rTj.E"
NEW MULTI -FAMILY (UNITS—) MULTI. ADD. SIGN GRADING__ OTHER
TAX ACCOUNT NO. 095251-4988 LEGAL DESCRIPTION
(SFF,A'PTACHED)
/
ISSUED BY JOANNE JOHNSON DATE OF ISSUE °+
X DATE OF APPLICATION 11-6-90
BUILDING INFORMATION
ZONE OCCUPANCY_ TYPE OF CONSTRUCTION
BLDG.SQ.FT.
SET BACKS: FRONT SIDE _ REAR
STORIES HEIGHT LIMIT
PLUMBING NO. NO.
MECHANICAL APPLIANCES AMT. AMT.
BOND
WATER CLOSETS ELEC. HOT WATER HEATER
GAS PIPING FT.
BOILER
__
RECEIVED _
BATHTUBS LAUNDRY DRAINS
COMPRESSOR
TANK(S)
SHOWERS URINALS
FORCED AIR FURNACE
AIR HANDLING UNIT _
NUMBER _
LAVATORIES DRINKING FOUNTAINS _
GAS HOT WATER HTR.
_ MISC _
RETURNED
SINKS MISC.
CONVERSION BURNER
BASIC FEE
DISHWASHERS TOTAL FIXTURES
UNIT HEATER
TOTAL MECHANICAL
AMOUNT
VALUATION 4,776 FIRE/BUILDING DEPT APPROVAL:
RC 11-26-90
72.00
PERMIT FEE
47.00
PLAN CHECK FEE
A. D. 4 c R I P T I 0 N
PLUMBING FEE
FCHANICAL FEE
Lots 23 and 24, West Campus Office Park Division 1, according to the plat
- —
thereof recorded in Volume 97 of Plats, pages 55 through 58, inclusive, in
TOTAL BLDG. FEES
King County, Washington;
EXCEPT that portion of Lot 24 described as follows:
PART P/C FEE
SEPA REVIEW
Beginning at the most northerly corner of Lot 24 of West Campus Office
Park Division 1, to the
DATE:�']�L
WATER SERVICE L
according plat thereof recorded in Volume 97 of
Plats, pages 55 through 58, inclusive, in Ung County, Washington; thence
south 38 degrees 30 minutes 00 seconds east along the northeasterly line
WATER MAIN CHG.
of said lot 24 and the rlght-of-way line of 1st Avenue South, 90.00 feet
AMOUNT: ,..
to the true point of beginning; thence continuing south 38 degrees 30
S.B.C.C. FEEA
minutes 00 seconds east along said lot and right-of-way line 110.00 feet
.
to a point of curvature; thence along said curve to the right through a
OTHER FEES FD Z G n
central angle of 90 degrees 00 minutes 00 seconds, and arc length of
RECEIPT:47.12
I
feet; thence south 51 degrees 30 minutes 00 seconds west along the
AMOUNT DUE 7 77 7 0southeasterly
line of said Lot 24 and right-of-way line of South 334th
Street 109.00 feet; thence north 38 degrees 30 minutes 00 seconds west
parallel to said northeasterly lot line 85.00 feet; thence north 10
ALL PERMITS EXPIRE 180 DAYS AFTER ISSUANCE IF NO WORK IS STARTED. RESIDENTIAL AND GRAD
degrees 49 minutes 30 seconds east 84.39 feet; thence north 51 degrees 30
00
minutes seconds east parallel to said southeasterly lot line 75.00
feet to the point of beginning.
I CERTIFY THAT THE INFORMATION FURNISHED BY ME IS TRUE AND CORRECT TO THE BEST OF MY
RE01JIREMENTS WILL BE MET:
Situate in the County of King, State of Washington.
�
s f ) A, (-
OWNER OR AGENT L i` DATE tib
2
04
CITY OF
FEDERAL WAY
BUILDING PERMIT BUILDI41
NG IN 55ECTION
3
PERMIT NO.
OWNER'S NAME
__ JOB ADDRESS
CONTRACTOR
ADDRESS
CONT. PHONE
CONT. REG. NO.
OWNER'S PHONE
OWNER'S ADDRESS
TYPE JOB: NEWRESIDENCE
ADDITION NEW INDUSTRIAL NEW COMMERCIAL COMMERCIAL ADD. INDUSTRIAL ADD. NEW PUBLIC PUBLIC ADD. _
NEW MULTI -FAMILY (UNITS
) MULTI. ADD. SIGN__ GRADING OTHER
TAX ACCOUNT NO.
LEGAL DESCRIPTION
ISSUED BY
DATE OF ISSUE
DATE OF APPLICATION
BUILDING INFORMATION
ONE
OCCUPANCY TYPE OF CONSTRUCTION
BLDG. SQ. FT.
SET BACKS: FRONT
SIDE REAR_
STORIES_ HEIGHT LIMIT
PLUMBING NO.
NO.
MECHANICAL APPLIANCES
AMT. AMT. BOND
WATER CLOSETS
ELEC. HOT WATER HEATER
GAS PIPING _ FT
BOILER
RECEIVED
BATHTUBS
LAUNDRY DRAINS
COMPRESSOR
TANK(S)
SHOWERS
URINALS
FORCED AIR FURNACE
AIR HANDLING UNIT _ NUMBER
LAVATORIES
DRINKING FOUNTAINS
GAS HOT WATER HTR.
MISC
RETURNED
SINKS
MISC,
CONVERSION BURNER
BASIC FEE
DISHWASHERS
TOTAL FIXTURES
UNIT HEATER
TOTAL MECHANICAL AMOUNT
VALUATION
f� • 6fi ms/ouirmlf*3 nF.Per APPRO rt31s:
•❑0
PERMIT FEE
00
PLAN CHECK FEE
i.Ra AT DESCRIPTION
PLUMBING FEE
_
CHANICAL FEE _
Lots 23 and 24, West Campus Office Park Division 1, according to the plat
thereof recorded in Volume 97 of Plats, pages 55 through 58, inclusive, in
TAL BLDG. FEES -
King County, Washington;
EXCEPT that portion of Lot 24 described as follows:
PART P/C FEE
SEPA REVIEW
(,
Beginning at the most northerly corner of Lot 24 of West Campus Office
thereof in Volume 97 of
DATE: --
Park Division 1, according to the plat recorded
inclusive, in Ung County, Washington; thence
WATER SERVICE
WATER MAIN CHG.
---- -- --, -�•
�`
Plats, pages 55 through 58,
south 38 degrees 30 minutes 00 seconds east along the northeasterly line
of said lot 24 and the rfght-of-way line of 1st Avenue South, 90.00 feet
AK' "
to the true point of beginning; thence continuing south 38 degrees 30
S.B.C.C. FEE
minutes 00 seconds east along said Jot and right-of-way line 110.00 feet
f 1
to a point of curvature; thence along said curve to the right through a
OTHER FEES
g
central angle of 90 degrees 00 minutes 00 seconds, and arc length of
AMOUNT DUE
47.12 feet; thence south 51 degrees 30 minutes 00 seconds west along the
southeasterly line of said Lot 24 and right-of-way line of South 334th
Street 109.00 feet; thence north 38 degrees 30 minutes 00 seconds west
parallel to said northeasterly lot line 85.00 feet; thence north 10
ALL PERMITS EXPIRE 180 DAYS
AFTER ISSUANCE IF NO WORK IS STARTED. RESIDENTIAL AND GRA'
degrees 49 minutes 30 seconds east 84.39 feet; thence north 51 degrees 30
minutes 00 seconds east parallel to said southeasterly lot line 75.00
1 CERTIFY THAT THE INFORMATION
FURNISHED BY ME IS TRUE AND CORRECT TO THE BEST OF I
feet to the point of beginning.
REQUIREMENTS WILL BE MET:
Situate in the County of King, State of Washington.
OWNER OR AGENT
DATE
9 •
SEK AdQfl FOOTINGS
DATE S/l BY
O.K TO POUR FOUNDATION WALLS
DATE ._.._- ...._—....._BY
PLUMBING GROUNDWORK
DATE __.. BY
PLUMBINGROUGH IN
DATE _.. ..__ _BY _.._
WATER LINE O.K.
GAS PIPING O.K.
MECHANICAL INSPECTION
DATE —_ _BY _
O.K. TO ENCLOSE FRAMING�,G'
DATE_ f�jLBY ���f�"
INSULATION
DATE _ BY
WALL BOARD AND FIRE WALL
DATE __-- BY
FINAL O.K. T?,C UPY
re—.BY
DCD
PSD
FDDATE
p-croF
a a r Cd a�
A'&
:L A=
NO V 0 h 1-900
7,1"WAY
� = �"Lit A-
0
P*it # �� ? _-) _e -rt
CITY OF FEDERAL WAY
BUILDING PERMIT APPLICATION
— Please Print —
BOX 1 TENANT NAME: Milgard Manufacturing 7 '-/ 7 5f Ljo_�e S. 4
9
OWNER Commonwealth Pacific, Inc.
OWNER'S ADDRESS 1101 western Avenue
DESCRIBEJOB Tenant Improvement
THE PROPERTY IS OWNED BY: SINGLE/MARRIED
SITE + OCATION Westside Center, lst Way Bldg A S. 334th
Suite'910 CITY Seattle, 98104 PHONE 682-1100
PARTNERSHIP
CORPORATION x
BOX 2 CONTRACTOR'S NAME Richards Construction & Painting Inc. CONTRACTOR'S REG. # RICHACP132JA
Card MUST be presen
CONTRACTOR'S ADDRESS 34016 9th Ave. S., BLDG. D9 CITY Federal Way 9800NONE 838-1844/927-1442
EXPIRATION DATE 4-1-91
—
OR
—
I HAVE READ CHAPTER 18.27.010 RELATING TO DEFINITIONS OF GENERAL CONTRACTORS AND SPECIALTY CONTRACTORS AND
CHAPTER 18.27.110 WHICH PROHIBITS ISSUING PERMITS WITHOUT PROOF OF REGISTRATION.
BOX CONTACT PERSON Wayne James, Construction Manager PHONE�38-1844/927-1442
BOX 4 SEWER DISTRICT Federal Way Water & Sewer WATER DISTRICT Same
BOX 5 ESTIMATED PROJECT COST 10,000.00 EXISTING BUILDING VALUATION 4, 000, 000. 00 Bldgs A,B,C
BOX 6 PROPERTY TAX ACCOUNT NUMBER 95-251-493e
LEGAL DESCRIPTION See Attached
(If necessary, please submit a separate page with the legal description.)
K.C. Plat Recording #
BOX BUILDING SQUARE FOOTAGE: (Existing/Proposed)
1ST FLOOR 11,500/ -- 2ND
FLOOR 11,500 /3400
3RD FLOOR / BASEMENT / DECK /
GARAGE /
BOX 8 ( ) SINGLE FAMILY
( ) NEW CONSTRUCTION
( ) MULTIFAMILY (NO. OF UNITS = )
( X) EXISTING STRUCTURE
(X) COMMERCIAL9011Z;MAP�x
TOTAL AREA OF PROPERTY 203,000
SQ FT
BOX 9 PLUMBING FIXTURES (including rou -ins)
MECHANICAL APPLIANCES — BASIC FEE $
N0. WAZERCLOSETS
GAS PIPING, FgET
$
--BAT TUBS
N0. FUiNACE, ELEC. GfiS $
SHOW RS
GAS HOT WATER HEATE
$
LAVATO IES
CONVERSION BURNE
$
SINKS
BOILER, ZE BTU
$
DISHWAS
AIR HANDL G U TS
$
ELECTRIC T WATER HEATER
HEAT PUMP ZE
$
LAUNDRY A HER OUTLET
UNIT HEATE
$
URINALS
AIR COOLI G UN S, SIZE
$
DRINKIN FOUN INS
COMME IAL H00
$
SUMPS /SPRINKL VACUUM BREAKERS
OTHE
$
DRAIN
$
OTHE
$
TOT L FIXTURES
$
TOT MECHANICAL FEE
$
I CERTIFY UNDER PENALTY OF PERJURY THAT THE INFORMATION FURNISHED BY ME IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE
AND FURTHER THAT I AM AUTHORIZED BY THE OWNER OF THE ABOVE PREMISES TO PERFORM THE WORK FOR WHICH PERMIT APPLICATION IS
MADE. I FURTHER AGREE TO SAVE HARMLESS THE CITY OF FEDERAL WAY AS TO ANY CLAIM (INCLUDING COSTS, EXPENSES, AND ATTORNEYS'
FEES INCURRED IN INVESTIGATION AND DEFENSE OF SUCH CLAIM), WHICH MAY BE MADE BY ANY PERSON, INCLUDING THE UNDERSIGNED,
AND FILED AGAINST T14E CITY OF FEDERAL WAY, BUT ONLY WHERE SUCH CLAIM ARISES OUT OF THE RELIANCE OF THE CITY, INCLUDING ITS
OFFICERS AND EMPLOYEES„ UPON'"RE ACCURACY OF THE INFORMATION SUPPLIED TO THE CITY AS A PART OF THIS APPLICATION.
OWNER/AGENT ""� DATE:
ANP -008 3/90
OFFICE USE ONLY (PLEASE DO NOT WRITE BELOW THIS LINE)
ZONE SETBACKS: FRONT_
PLANNING DEPARTMENT APPROVAL
REMARKS: .1
SEPA: EXEMPT NOT EXEMPT
FIRE DEPARTMENT APPROVAL
REMARKS:
SIDE REAR HEIGHT LIMIT
DATE !1- 2,0' . TO
w
BUILDING DEPARTMENT REMARKS:
ECEIVED I
ASSIGNED ADDRESS: 5
N Q V 0 61990
� GP FEDERAL WAY
3UILDING DEPT.
Amount
PARTIAL PLAN CHECK FEE RECEIVED
Date
72,
PERMIT FEE
PUBLIC WORKS DEPARTMENT APPROVAL Z
DATE
REMARKS:
MECHANICAL FEE
TOTAL BLDG. FEES
OC -
GPART
PART P/C FEE
SEPA REVIEW
U
i/-Sv
S.B.C.C. FEE
TYPE OF JOB: NEW RESIDENCE RES. ADD/ALT
NEW INDUSTRIAL IND. ADD/ALT
NEW COMMERCIAL
COMM. ADD/ALT
NEW MULTIFAMILY
(UNITS )
MULTIFAMILY ADD/ALT
TENANT IMP.
OTHER
OCCUPANCY i
TYPE OF CONSTRUCTION
STORES
t7 r C
BUILDING SQ. FT.
y-77 @
G Q = 23 9�M
BUILDING SQ. FT.
@
_
BUILDING SQ. FT.
@
_
BUILDING SQ. FT.
BUILDING SQ. FT.
@
@
_
BUILDING SQ. FT.
TOTAL SQ. FT.
@
_
TOTAL VALUATION
BUILDING DEPARTMENT REMARKS:
ECEIVED I
ASSIGNED ADDRESS: 5
N Q V 0 61990
� GP FEDERAL WAY
3UILDING DEPT.
Amount
PARTIAL PLAN CHECK FEE RECEIVED
Date
Receipt #
BUILDING DEPARTMENT APPROVAL
RECEIVED I BY DAT
ACCEPTED FOR FILING
72,
PERMIT FEE
PLAN CHECK FEE
PLUMBING FEE
MECHANICAL FEE
TOTAL BLDG. FEES
OC -
GPART
PART P/C FEE
SEPA REVIEW
U
i/-Sv
S.B.C.C. FEE
OTHER FEES F D
16 0
AMOUNT DUE
Z7.
Receipt #
BUILDING DEPARTMENT APPROVAL
RECEIVED I BY DAT
ACCEPTED FOR FILING