Loading...
18-104154City of Federal Way Applicant Commmuty Development Dept 1 L 33325 8th Ave S FAST WATER HEATER CO (GENERAL) Federal Way, WA 98003 COMPANY Ph: (253) 835.2607 Fax (253) 835-2609 FEDERAL WAY WA Project Name: CORPUZ Project Address: 32725 20TH AVE SW Project Description: Removelreplace gas water heater Mechanical Permit #:18 -104154 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 010456 0500 Owner Applicant Contractor JOSEPHINE D HANSEN SALINA THAPAFAST WATER HEATER FAST WATER HEATER CO (GENERAL) 32725 20TH AVE SW COMPANY FASTWWH948BC (1/4/20) FEDERAL WAY WA 11715 NORTH CREEK PKWY S SUITE C-106 1715 NORTH CREEK PKWY S SUITE C -la 98023-6437 BOTHELL WA 98011 BOTHELL WA 98011 Additional Permit Information Mechanical Work Valuation? .................................. 1604 Is this an Online or O.T.C. application?.................. Yes Hot Water Tanks 1 PERMIT EXPIRES Tuesday, 5 March, 2019 Permit Issued on Thursday, September 6, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: l 1 117 Date: iagr �I� Y 'Y Y® ■ Y 4 spa THIS CARD IS TO REMAIN ON-SITE CRY OR Federal Way Construction Inspection Record y INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 18104154 00 Address: 32725 20TH AVE SW Project: JOSEPHINE D HANSEN FEDERAL WAY WA 98023-6437 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® Mechanical Rough -in (4165) ® Gas Piping (4125) ® Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date Bye Date .{ . Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date