Loading...
13-104868t City of Federal way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Ouilding - Multi Family Permit #: 13 -104868 -00 -MF Inspection Request Line: (253) 835-3050 Project Name: FOREST COVE APARTMENTS BUILDING 13 Project Address: 30909 16TH PL SW Project Description: ADD - Install (4) stall carport over existing paved parking stalls Parcel Number. 122103 9006 Owner A ole icant Contractor Lender FOREST COVE -388 LLC CARPORTS OF WASHINGTON CARPORTS OF WASHINGTON 1703 SW 309TH ST PO BOX 2389 CARPOW1945BR (1/19/14) FEDERAL WAY WA BUCKLEY WA 98321 PO BOX 2389 98023-4389 BUCKLEY WA 98321 Census Category: 437 - Commercial alt / add / conversion Includes: #1 #2 #3 #4 Occupancy Class: U Construction T Type V - B Occupancy Load Floor Areas . R. 0 0 0 0 Additional Permit Information Mechanical to be Included?...................................No Number of Stories ................................................. 1 Permit for Building Shell Onl No Plumbing to be Included?.......................................No New / Additional Sq. Feet - Total .......................... 0 Occupancy # 1- Use............................................... Carport NQ.1=ixtures;Associated VVkh This Permit 11 ,.. PERMIT EXPIRES Monday, June 16, 2014 Permit Issued on Wednesday, December 18, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the u will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. L Owner or agent Date: FINALED CITY CW A& Federal Way THIS CARD IS TOMAIN ON-SITE Construction Inlection Record INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 13 -104868 -00 -MF Address: 30909 16TH PL SW Project: FOREST COVE -388 LLC FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. SWM Precon Site Mtg (4400)Initial Erosion Control (4365) Final Electrical Approved Footings/Setback (4110) 0 Approved Drainage/Downspout (4040)Re-steel To be done prior to breaking ground (4215) Approved to place concrete By Date By Date By Date Rough Electrical Approved 0 Final Electrical Approved 0 Foundation Wall (4115) Drainage/Downspout (4040)Re-steel Date (4215) By Approved to place concrete Approved to backfill Date Approved to place concrete or grout By Date By Date By Date Slab/Concrete Floor (4255) Underfloor Framing (4285) 0 Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date 0 0 Shear Walls (4245) Roof Sheathing (4220) Fire/Draft Stops (4095) Approved to install siding Approved to install roofing Approved By Date By Date By Date Interim Erosion Control (4370) ❑ Framing (4120) Prior to scheduling a Framing inspecti]and Approved Electrical, Plumbing & Mechanical Rough - Approved to insulate ByFire/DraB Date Stop inspectioes must be signed - By Date approved. IBC 109.3.4 Insulation (4150) Gypsum Wallboard Nailing (4130) [] Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop file By Date By Date By Date Final - Fire Department (4060)Final - Planning Final - Public Works (4080) Approved Approved Approved By Date By Date By Date Final Erosion Control (4375) Final - Building (4050) Approved Approved By Date By Date ?I (I Rough Electrical Approved 0 Final Electrical Approved 0 Right of Way Approved By Date By Date By Date FFedefai11 Way PERMIT PPLIq ;qN �j OCT 3 0 2013 3�3 P==TNUMM I ✓ - I " l l/ CQ - I 1 CITY OF FEDERAL WAY — — — — — — — — — — TAROT DATE SM AUDEMS 3D 9 09 11etil ,P) 5vJ 1 `� 13 PROJECT VALIDATION $ ZONMO ASSROSOR's TAR/PARCEL i 1 3 2-45,71 t 2 -2 TYPE OF PERMIT BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT tcvi by r-� Twi, STs PROJECT DESCRIPTION Detailed description of w ork to . --- ENErmt..L_i N%t' . iN `s5+aIUL V ed be included on this permit only PROPERTY OWNER R QC, 1L WPW I' DUST (,NF- UP,, t so t)PRarARY PaGNE - }top MAIMING, ADDRB866 - Lo M MERLE 'Z 1 b a £2 t prn. PA Rk&9A\j UT OH 10-7 NAM ,bc a2NS KAUM 3 AD1188188 Z� a -Um o - pl LB cAl2Qp gFalfi$h►nu61G�1� CONTRACTOR WA STATE CONTRACTOR'S LlC88SZ • ESPDtATION DATE FSEMAL WAY 8000388 LICZMM i C14 PDvj 5 YAMS PIUMART PSONE APPLICANT MAnJAQADDRESS Po 3e 23"�9 EMAIL OfW/Gt= nl,rau. crr>! STATE W PC g a PAz 253 tea- o t*A)b Fv ?!M Sto2 ss�o PROJECT CONTACT MAI1,II10ADDR888 Z$ 0-0 -MAD. D�W4 w �•� (The individual to reemve and respond to all correspondence My STATE ZIP FA8 concem ng this application) PROJECT FINANCING N ® oW>� FWANCED Required vatrte of $5,000 or more MAnM A=Fa=, C. STATE, ZIP PHONB RM 1927.095) I certVM under penalty of perjury that I am the property owner or authorised agent of the properly owner. I cert y that to the best of my knowtvdgde the information submitted in support of this permit application is true and correct. t cert)/)) that I will compAp with all applicable City of Federal Way regulations pertaining to the work authorised by the issuance qr a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compHanm with local, state or federal lams regulating construction or environmental lame. r farther agree to hold harmless the City of Federal Way as to any claim (including costo expenses, and attorneys' fees incurred in the investigation and defense of such clalml which noel be made by any person, including am undersigned, and Jited against the ctea but only where such claim ant of the reliance of the city, including its o l ears and employees, upon the accuracy of the information supplied to a part of this application. CSIGNAT. DATEI LJ l 1 J /3 PRINT NAME: Bulletin #1 OD -January 1, 2013 Page 1 of 3 k-UiandoutMermit Application MECHANICAL PERMIT N P Indicate how many of each type off lure to be installed or relocated as part of this project. Do not it AIR HANDLING UNITS FANS GAS PIPE OUTLETS AIR CONDITIONER FIREPLACE INSERTS HOODS (c-iaq BOILERS FURNACES HOT WATER TANKS ta.4 COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES PLUMBING PERMIT N j i Indicate how many of each type oF-Tiicture to be installed or relocated as part of this project. Do not in BATHTUBS (Q 7hb/Sh. Comb.) LAVS (Hand SWaO TOILETS DISHWASHERS RAINWATER SYSTEMS URINALS DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS (xitcbm/utaity) WATER HEATERS (®acaki HOSE BIBBS SUMPS WASHING MACHINES VALUE OF MECHANICAL WORK d• OTHER (Deacnbe) VALUE OF PLUMRJNG WORK dude existing -fixtures to ren WATER PIPING OTHER (Describe) TOTAL FI8TUR88 GENERAL INFORMATION N I Pr CRMCAL AREAS ON PROPERTY? WATER PURVEYOR sEWER PUR9EYOR VALUE OF Z3MW G IE[PR04&![81fT8 FOR OFFICE USE BASEMENT Additional Information BuimmO 81UBTnfo/PREVIOUS Uss LOT am RN sgmre Peat) EEISTII 8 nw SPIUMM R syermP PROPOSED FIRS sUPPRBSSION sYSTEIt? ADDITION ❑ Yes ❑ No ❑ Yes ❑ No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION (in square feet) WASTING PROPOSED TOTAL FOR OFFICE USE BASEMENT Additional Information BuimmO FIRST FLOOR (or Mobile Home) ADDITION SECOND FLOOR COMMERCIAL — REMODEL/TENANT IMPROVEMENTS COVERED ENTRY Area care Feet in SqTOTAL Occupancy Group(a) Construction TypeStories DECK BVUMMO GARAGE ❑ CARPORT �Q TENANT AREA ONLY OTHER (desaiU* PROJ*CT AREA ONLY Area Totals p 2 *"low Afl m— OAMV** ESTIMATED SELLING PRICE $ 1 # OF BEDROOMS COMMERCIAL — NEW/ADDITION /v I - AREA DESCRIPTION Area Feet in SquareNEW Occupancy Group(s) Construction TypeS # oifes Additional Information BuimmO ADDITION COMMERCIAL — REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area care Feet in SqTOTAL Occupancy Group(a) Construction TypeStories Additional Information BVUMMO TENANT AREA ONLY PROJ*CT AREA ONLY Bulletin #100 - January 1, 2013 Page 2 of 3 k:\Handouts\Permit Application