Loading...
10-104355wilding - Single Family City of Federal Way 4p ry ! community Development Services Permit #. 10 -104355 -00 -SF P.O. Box 9718 Federal Way, F3-9718 Inspection Request Line: 253 835-3050 Ph: (253) 835-2607 Fax:: (25 (25 q 3) 835-2609 p Project Name: COURIER Project Address: 32211 25TH AVE SW Parcel Number: 873180 0360 Project Description: Interior remodeling to entire home to remove popcorn ceiling replacing with sheetrock and replacing wood paneling. **10/18/10 Add gas piping for future fireplace modification*** Owner Applicant Contractor Lender JOHN & DAWN COURIER JOHN & DAWN COURIER 32211 25TH AVE SW 32211 25TH AVE SW 32211 25TH AVE SW FEDERAL WAY WA 98055 FEDERAL WAY WA 98055 FEDERAL WAY WA 98055 Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 92 #3 44 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) 0 0 0 0 Additional Permit Information Ncw / Additional Sq. Fect - 3rd I-luor.................. _0 New / Additional Sq. Feet -Its,>.cment._.-.-_...-..,....0 Mechanical to be Included? ............................... ... Plumbing to be Included?.._ ...........................No Mechanical Fixtures as Piping... Subject to field inspection without plans PERW EXPIRES Saturday, April 16, 2011 mit Issued on Thursday, October 14, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal�Way. Owner or agent: U/ o Date: FIRALED I �li�/° CITY OF Federal Way PERMIT #: Owner; THIS CARD IS TO REMAIN ON-SITE Construction Ins9ction Record INSPECTION REQUESTS: (253) 835-3050 10 -104355 -00 -SF Address: 32211 25TH AVE SW JOHN & DAWN COURIER FEDERAL WAY, WA 98023-2508 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. E] Gas Piping (4125) E] Fire/Draft Stops (41 Approved to release test Approved By Date By 1. Date z2zy, Prior to scheduling a Framing inspection, Framing (4120) Electrical, Plumbing & Mechanical Rough -in and Approved to insulate Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 By Date Gypsum Wallboard Nailing (4130) Final Erosion Control Approved to install mud & tape Approved By Date By Date )95) Interim Erosion Control (4370) Approved By Date SWM Precon Site Mtg (4400) Initial Erosion Control (4365) E] Plumbing Groundwork (4190) By Date Approved By To be done prior to breaking ground By Approved to cover By Date By Date By Date E] Gas Piping (4125) E] Fire/Draft Stops (41 Approved to release test Approved By Date By 1. Date z2zy, Prior to scheduling a Framing inspection, Framing (4120) Electrical, Plumbing & Mechanical Rough -in and Approved to insulate Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 By Date Gypsum Wallboard Nailing (4130) Final Erosion Control Approved to install mud & tape Approved By Date By Date )95) Interim Erosion Control (4370) Approved By Date Underfloor Framing (4285) Final - Mechanical (4065) Approved Floor Sheathing (4105) By Date Shear Walls (4245) By Approved to sheath floor By Date Approved to install flooring B Date 1-2,— 0— 70tc_) Approved to install siding By Date By Date By Date Roof Sheathing (4220) Rough Plumbing (4230) E] Mechanical Rough -in (4165) Approved to install roofing Approved Approved By Date By Date By Date E] Gas Piping (4125) E] Fire/Draft Stops (41 Approved to release test Approved By Date By 1. Date z2zy, Prior to scheduling a Framing inspection, Framing (4120) Electrical, Plumbing & Mechanical Rough -in and Approved to insulate Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 By Date Gypsum Wallboard Nailing (4130) Final Erosion Control Approved to install mud & tape Approved By Date By Date )95) Interim Erosion Control (4370) Approved By Date El Insulation (4150) Approv to install wallboard By Date / Final - Mechanical (4065) Approved (4375)El By Date El Final - Plumbing (4075) ❑ Final - Building (4050) Approved Right of Way \ppro% cd By Approved By Date Date B Date 1-2,— 0— 70tc_) Date El Rough Electrical Approved\phro%rd Final Electrical Right of Way \ppro% cd By Date By Date By Date DATE INSPECTOR AREA AND TYPE Ot iNSPECTION City of Federal Way Community Development Services P.O. Box 9718 Federal Way, WA 98063-9718 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Project Name: COURIER Project Address: 32211 25TH AVE SW *Building - Siugle Family Permit #: 10-104355-00-S F Inspection Request Line: (253) 835-3050 Parcel Number: 873180 0360 Project Description: Interior remodeling to entire home to remove popcorn ceiling replacing with sheetrock and replacing wood paneling Owner Atmlicant Contractor Lender JOHN & DAWN COURIER JOHN & DAWN COURIER 32211 25TH AVE SW 32211 25TH AVE SW 32211 25TH AVE SW FEDERAL WAY WA 98055 FEDERAL WAY WA 98055 FEDERAL WAY WA 98055 Census Category: 434 - Residential alt/add - no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Areas . ft.) 0 0 0 0 New / Additional Sq. Feet - 3rd Floor....................0 Mechanical to be Included? ............. ...................No New / Additional Sq. Feet - Basement............ Plumbing to be Included? .............................. CONDITIONS: Subject to field inspection without plans PERMIT EXPIRES Tuesday, April 12, 2011 Permit Issued on Thursday, October 14, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will b in ac rdance with the laws, rules and regulations of the State of Washington r and the City of Federal Way. Owner or agent. J Date: I Z) I I 4 CITY OF Federal Way PERMIT #: 10 -104355 -00 -SF THIS CARD IS TO REMAIN, ON-STTE Construction Insfkction Record INSPECTION REQUE TS: (253) 835-3050 Address: 32211 25TH AVE SW Owner: JOHN & DAWN COURIER FEDERAL WAY, WA 98023-2508 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. SWM Precon Site Mtg (4400) Initial Erosion Control (4365) E] Underfloor Framing (4285) Approved By To be done prior to breaking ground Approved to install siding Approved to sheath floor By Date By Date By Date Floor Sheathing (4105) Shear Walls (4245) E] Roof Sheathing (4220) Approved to install flooring By Date Approved to install siding Approved to install roofing By Date By By Date By Date prior to scheduling a Framing inspection; Fire/Draft Stops (4095) Interim Erosion Control (4370) Approved Approved Electrical, Plumbing & Mechanical Rough -in and By Date By Date Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Framing (4120) Insulation (4150) Gy sum Wallboard Nailing (4130) Approved to insulate Approved to install wallboardp roved to install mud & tape By Date By Date By Daty/. E] Final Erosion Control (4375) Final - Building (4050) Approved Approved By Date B Date, Z Rough Electrical \ �prwed Final Electrical Approved Right of Way Approved By Date By Date By Date H R HARSNG, JR. / CONSULTING EADINEER 212 WELLS AVE. S., SUITE F, RENTON, WA 98057 (425) 271-4242 21 October 2010 /b-/bY35S#ao RECEIVED BY COMMUNITY DEVELOPMENT DEPARTMENT City of Federal Way OCT 2 2 2010 Building Division 33325 Eighth Ave. 5 Federal Way, WA 98063 ATTN: Inspections SUBJECT: The Courier Residence, 32211 25th Ave. 5W, Federal Way, WA 98023 Job No. 010-45 At the request of the Courier's, we visited the site to observe the "unsupported" beam in the basement. The laminated (3) 2x_ beam is located in the basement (main floor framing) parallel to the stair and spans from the hall bearing wall approximately 10 feet longitudinally into the room. The beam in question is located directly below the main floor hall wall, posts and headers that support some roof and ceiling structure. 240 floor joists extend from the exterior bearing wall under the beam in question to the stair well bearing wall. Close inspection of the framing at the free end of the "unsupported" beam reveals a (4) 2x10 laminated beam framed flush in the floor space directly above the free end of the beam in question. (2) 5/8" diameter all thread bolts with square plate washers attach the beam free end to the flush beam in the floor. The beam in question is admittedly ugly and not very well done, however, the beam is supported at the free end and the structural concept is sound. Loading by the ceiling framing through the hall headers and posts above is light. It is our professional opinion that the beam in question is legitimately supported and the concept is structurally sound. R. 17456 �TAhLV XC: The Couriers Respectfully submitted, Hubert R. Harting, P Consulting Engineer /0 J F H R A TING,JR. CONSULTING ENGWER 212 WELLS AVE. S., SUITE F, RENTON, WA 98055 (425) 271-4242 21 October 2010 City of Federal Way Building Division 33325 Eighth Ave. 5 Federal Way, WA 98063 ATTN: Inspections SUBJECT: The Courier Residence, 32211 25th Ave. SW, Federal Way, WA 98023 Job No. 010-45 At the request of the Courier's, we visited the site to observe the "unsupported" beam in the basement. The laminated (3) 2x_ beam is located in the basement (main floor framing) parallel to the stair and spans from the hall bearing wall approximately 10 feet longitudinally into the room. The beam in question is located directly below the main floor hall wall, posts and headers that support some roof and ceiling structure. 2x10 floor joists extend from the exterior bearing wall under the beam in question to the stair well bearing wall. Close inspection of the framing at the free end of the "unsupported" beam reveals a (4) 2x10 laminated beam framed flush in the floor space directly above the free end of the beam in question. (2) 5/8" diameter all thread bolts with square plate washers attach the beam free end to the flush beam in the floor. The beam in question is admittedly ugly and not very well done, however, the beam is supported at the free end and the structural concept is sound. Loading by the ceiling framing through the hall headers and posts above is light. It is our professional opinion that the beam in question is legitimately supported and the concept is structurally sound. Respectfully submitted, Hubert R. Harting, PE Consulting Engineer XC: The Couriers Aav� Federal Way COMMUNITY DEVELOPMENT SERVICES 253-835-2607• FAX 253-835-2609 '�i _wg! _:ituc;;erJsratu_u�,rr•rr 10 PERMIT APPLICATION C) _ / o q- M F P RECEIVE9 OCT 14'20110 a7?�, PSTT%/ fli— rrMrn A i I A I A\/ SITE ADDRESS g I 3 Z.1 S RVII, IS -V-.k cas PROJECT VALUATION $ X000 ZONING ASSESSOR'S TAX/PARCEL 0 -7- a _ 0 3 d TYPE OF PERMIT ❑ BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT (Tenant Norne/Homeowner Last Nnme) �� U / l PROJECT DESCRIPTION Detailed description of work to 5 u F - x O V irk p o p LO i -k .J r, F L- f1 Nz5 1. a Atli m b L l e -N 1 S l ai r% Cq F -N be included on this permit only PROPERTY OWNER NAME _ ^ » ^ , fv; JIZ� 1;� PRIMARY PHONE J -35 t , MAILING ADDRESS - - E-MAIL CITY STATE ZIP Wq NAME PHONE MAILING ADDRESS E-MAIL ONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE M EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE M NAME () N /_\ L_3 ..� LA m) S [1 rli PHONE MAILING ADDRESS /7 E-MAIL APPLICANT CITYe!F ` J fAL A. Ir.\JVV STAT ZIP - FAX PROJECT CONTACT (The individual to receive and Tll1L NAME ` ' % �- � � �1 C l� P� C PHONE a t MAILING ADDRESS C - � E-MAIL respond to all correspondence concerning this application) CITY yam{ j�A - ST^ATA / ZIP _/l 1 FAX ALTERNATE CONTACT NAME: PHONE E-MAIL PROJECT FINANCING NAME OWNER -FINANCED Required value of .$S, 000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as apart of this application. SIGNATURE: DATE PRINT NAME: Bulletin #100 - April 14, 2010 Page 1 of", k:AIlandouts\Perinit Application