Loading...
10-104797' *In City of Federal Way 0 0 Mechanicalt #. 104797-00-M E 10 Community Development Services FILE Permi•P.O. Box 9718 Federal Way, WA 98063-9718 Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line. (253) 835-3050 Project Name: RALPH a 8'-.1? '1 - Project Address: 32206 25TH AVE SW Parcel Number: 873180 0270 Project Description: REPLACE EXISTING FURNACE & HOT WATER TANK Owne Applicant Contractor EDWARD & CHIEN-HUA RALPH MARIA HAZEN BEL -RED HEATING & AIR 32206 25TH AVE SW BEL RED HEATING BELREHAOOOCZ (3/28/12) FEDERAL WAY WA 98023 10733 47TH AVE W 12805 NE 126TH PL MUKILTEO WA 98275 KIRKLAND WA 98034-7721 ...:. Addliti.66ill,Permit informatt n Mechanical Valuation............................................6600 Is this an Online or O.T.C. application?.................Yes MCIlatl�Ca FIXtIr . Furnaces ......................................... 1 Hot Water Tanks............................ 1 PERMIT EXPIRES Wednesday, May 11, 2011 Permit Issued on Friday, November 12, 2010 I hereby certify that the above information is correct and that the construction on, the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington �� and /�t/h��ty of Federal Way. I//?Ol //0 Owner or agent: l r:� Date: FINS 1 /(0�11 , 41 1 TRIS CARD IS T MAIN ON-SITE Crn°FConstruction I ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 10 -104797 -00 -ME Address: 32206 25TH AVE SW Project: EDWARD & CHIEN-HUA RALPH FEDERAL WAY, WA 98023-2508 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough -in (4165)13 Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) 1:1Approved Approved By Approved to release test Approved By Date By Date By Date / ok FILE Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date