12-102697Project Name: RICH
Project Address: 31801 25TH AVE SW
''o 0 MechAnical
Permit #: 12 -102697 -00 -ME
Inspection Request Line: (253) 835-3050
Project Description: Replace gas furnace; install gas fireplace with gas piping
Parcel Number: 193840 0310
Owner
Alolicant
Contractor
7EFFEREY R RICH
City of Federal Way
Community & Econ. Dev. Services
WASHINGTON ENERGY SERVICES CO
33325 8th Ave S
FILE
Federal Way, WA 98003
FEDERAL WAY WA 98023
Ph: (253) 835-2607 Fax: (253) 835-2609
WASIUES9710B (9/2/13)
Project Name: RICH
Project Address: 31801 25TH AVE SW
''o 0 MechAnical
Permit #: 12 -102697 -00 -ME
Inspection Request Line: (253) 835-3050
Project Description: Replace gas furnace; install gas fireplace with gas piping
Parcel Number: 193840 0310
Owner
Alolicant
Contractor
7EFFEREY R RICH
WESCO NORTHWEST PERMIT
WASHINGTON ENERGY SERVICES CO
31801 25TH AVE SW
NORTHWEST PERMIT/ WESCO
(GENERAL)
FEDERAL WAY WA 98023
1345 W GULF RD
WASIUES9710B (9/2/13)
POINT ROBERTS WA 98281
2800 THORNDYKE AVE W
SEATTLE WA 98199
Additional Permit Information
Mechanical Valuation............................................7562.11 Is this an Online or O.T.C. application? ................. Yes
Mechanical Fixtures
Fireplace Inserts ............................. 1 Furnaces......................................... 1 Gas Piping ...................................... 1
PERMIT EXPIRES Tuesday, December 11, 2012
Permit Issued on Thursday, June 14, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
an e i ederal Way.
Owner or agent: Date:
'--U� N I M"M E-
THIS CARD IS TO MAIN ON-SITE
CITY of Construction In ection Record
Federal Way INSPECTION REQUE TS: (253) 835-3050
PERMIT #: 12 -102697 -00 -ME Address: 31801 25TH AVE SW
Project: JEFFEREY R RICH FEDERAL WAY, WA 98023-2250
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)Gas
Piping (4125)
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Date
Date e�
/' ( 3—C C
Rough Electrical
Approved
1:1Approved
Final Electrical
1:1Approved
Right of Way
By
Date
By
Date
By
Date