Loading...
12-102697Project Name: RICH Project Address: 31801 25TH AVE SW ''o 0 MechAnical Permit #: 12 -102697 -00 -ME Inspection Request Line: (253) 835-3050 Project Description: Replace gas furnace; install gas fireplace with gas piping Parcel Number: 193840 0310 Owner Alolicant Contractor 7EFFEREY R RICH City of Federal Way Community & Econ. Dev. Services WASHINGTON ENERGY SERVICES CO 33325 8th Ave S FILE Federal Way, WA 98003 FEDERAL WAY WA 98023 Ph: (253) 835-2607 Fax: (253) 835-2609 WASIUES9710B (9/2/13) Project Name: RICH Project Address: 31801 25TH AVE SW ''o 0 MechAnical Permit #: 12 -102697 -00 -ME Inspection Request Line: (253) 835-3050 Project Description: Replace gas furnace; install gas fireplace with gas piping Parcel Number: 193840 0310 Owner Alolicant Contractor 7EFFEREY R RICH WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO 31801 25TH AVE SW NORTHWEST PERMIT/ WESCO (GENERAL) FEDERAL WAY WA 98023 1345 W GULF RD WASIUES9710B (9/2/13) POINT ROBERTS WA 98281 2800 THORNDYKE AVE W SEATTLE WA 98199 Additional Permit Information Mechanical Valuation............................................7562.11 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Fireplace Inserts ............................. 1 Furnaces......................................... 1 Gas Piping ...................................... 1 PERMIT EXPIRES Tuesday, December 11, 2012 Permit Issued on Thursday, June 14, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington an e i ederal Way. Owner or agent: Date: '--U� N I M"M E- THIS CARD IS TO MAIN ON-SITE CITY of Construction In ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 12 -102697 -00 -ME Address: 31801 25TH AVE SW Project: JEFFEREY R RICH FEDERAL WAY, WA 98023-2250 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date Date e� /' ( 3—C C Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date