Loading...
16-100948City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Mectankal • Permit #: 16 -100948 -00 -ME CInspection Request Line: (253) 835-3050 Project Name: LEISY Project Address: 30234 25TH AVE SW Project Description: Replace 3 ton gas furnace and install 3 ton air conditioner Parcel Number: 893760 0030 Owne ARRIOcant Contractor RICHARD A LEISY NORTHWEST PERMIT/ WESCO PACIFIC AIR SYSTEMS (GENERAL) JACKLYN R LEISY 1345 W GULF RD PACIFAS093KA (9/8/17) 30234 25TH AVE SW POINT ROBERTS WA 98281 • 12811 PACIFIC HWY SW FEDERAL WAY WA LAKEWOOD WA 98499 98023 Additional Permit Information Mechanical Work Valuation?.................................13974 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Air Conditioners - Stand Alone Un 1 Furnaces ......................................... 1 PERMIT EXPIRES Saturday, August 20, 2016 Permit Issued on Monday, February 22, 2016 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal WayI 1=. Owner or agent: Date: ■ V r- CITY of O;M&— Federal Way PERMIT #: Project: THIS CARD IS TOMAIN ON-SITE 40 Construction In ection Record . INSPECTION REQUE TS: (253) 835-3050 16 -100948 -00 -ME Address: 30234 25TH AVE SW RICHARD A LEISY FEDERAL WAY, WA 98023-2316 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date B-- Date EJ Rough Electrical Approved Final Electrical Approved E] Right of Way Approved By Date By Date By Date