Loading...
16-101697City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PAYNE Project Address: 34919 26TH CT SW Project Description: Install new gas furnace and heat pump 0 Mechanical Permit #: 16 -101697 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 502945 0630 Owner ApRilican Contractor EZEKIEL D PAYNE STEVE CALHOUN NARROWS HEATING & AIR JILL M PAYNE NARROWS HEATING & AIR CONDITIONING CONDITIONING (GENERAL) 34919 26TH CT SW 5121 S BURLINGTON WAY NARROI" 216J3 (4/5/18) FEDERAL WAY WA 98023-3047 TACOMA WA 98409 5121 S BURLINGTON WAY TACOMA WA 98409 Additional Permit Information Mechanical Work Valuation?.................................4472.00 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Compressors / Heat Pumps............ 1 Furnaces ......................................... 1 PERMIT EXPIRES Tuesday, October 4, 2016 Permit Issued on Thursday, April 7, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: CITY OF Federal Way -THIS CARD IS TOIN ON-SITE Construction In ection Record INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 16 -101697 -00 -ME Address: 34919 26TH CT SW Project: EZEKIEL D PAYNE FEDERAL WAY, WA 98023-3047 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165) Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) Approved By Approved to release test Approved By Date By Date By Date Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date