Loading...
15-10181784 a 11 % City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 're. FILE' h . % Mechanical Permit #: 15 -101317 -00 -ME Inspection Request Line: (253) 835-3050 Project Name: TAKECHI , (0 4-1 Project Address: 32800 26TH PL SW Parcel Number: 894520 0270 Project Description: Replace gas furnace and water heater Owner ARRlicant Contractor RICHARD S TAKECHI JAINHE HOW BRENNAN HEATING & A/C LLC 32800 26TH PL SW BRENNAN HEATING & A/C (GENERAL) FEDERAL WAY WA 4601 S 134TH PL BRENNHA971R9 (12/29/15) 98023 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures Furnaces ......................................... 1 Hot Water Tanks.......................:.... 1 PERMIT EXPIRES Sunday, October 11, 2015 Permit Issued on Tuesday, April 14, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: / i N" ' Date: crrY CW Federal Way PERMIT #: 15 -101817 -00 -ME Project: RICHARD S TAKECHI THIS CARD IS TO REMAIN ON-SITE Construction In ection Record Q INSPECTION RE UEE TS: 253 O 835-3050 Address: 32800 26TH PL SW FEDERAL WAY, WA 98023-2819 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)11 as Piping (4125) Final Electrical Final - Mechanical (4065) F1 Approved By Approved to release test Approved By Date By Date By Date � 0 --t Rough Electrical Approved 1:1Approved Final Electrical F1 Right of Way Approved By Date By Date By Date