Loading...
15-101820- -` Electrical City& Federal Way Permit #: 15 -101820 -00 -EL Community Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Inspection Request Line: (2 53) 8353050 Project Name: TAKECHI Project Address: 32800 26TH PL SW Parcel Number: 894520 0270 Project Description: Replace gas furnace and hot water heater Owner A o� Contractor RICHARD S TAKECHI JAIMIE HOW BRENNAN HEATING & A/C LLC 32800 26TH PL SW BRENNAN HEATING & A/C (ELECTRICAL) FEDERAL WAY WA 4601 S 134TH PL BRENNHA962DU (3/31/16) 98023 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional? ....................... No Electrical Fixtures Circuits - Residential ...................... 2 PERMIT EXPIRES Sunday, October 11, 2015 Permit Issued on Tuesday, April 14, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: h I I I h I 1= Date: THIS CAIS TO MAIN ON-SITE "�� RD Construction In ection Record Federal Way INSPECTION REQ TS: (253) 835-3050 PERMIT #: 15 -101820 -00 -EL Address: 32800 26TH PL SW Project: RICHARD S TAKECHI FEDERAL WAY, WA 98023-2819 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El LIFER Ground (42 5) Ditch cover (4030) Temporary Power (4275)Service Slab/Concrete Floor (4255) 1:1Approved Approved (4235) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding (4195) 1:1Approved Temporary Power (4275)Service 1:1Approved Right of Way (4235) Date Approved By Date Approved By Date Approved By Date By Date By Date Feeders/Sub-panels (4045) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By Date. El Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date