Loading...
12-105319City of Federal Way 10 . Mecha>dical Permit #: 12 -105319 -00 -ME Community &Econ. Dev. Services FILE 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: 253 835-3050 Ph. (253) 835-2607 Fax: (253) 835-2609 p q Project Name: ViJKELICH Project Address: 34609 31ST PL SW Project Description: like for like gas furnace replacement Parcel Number: 279150 0090 Ownr Anolicant Contractor VICTORIA J VUKELICH CHRISTIANA FLAJOLE BOB'S HEATING & A/C INC (GENERAL) 34609 31 ST PL SW BOB'S HEATING & A/C INC BOBSHHA9790B (9/2/13) FEDERAL WAY WA 98023-3318 13633 NE 126TH PL SUITE 350 13615 126TH PL NE SUITE 400 FEDERAL WAY WA 98034 KIRKLAND WA 98034 Additional Permit Information Mechanical Valuation............................................2500 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Furnaces ......................................... 1 PERMIT EXPIRES Saturday, May 25, 2013 Permit Issued on Monday, November 26, 2012 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. If ILIp Owner or agent: 0 0 M Date: -� jr"� (r"//0/(Z**0 ® CITY of THIS CARD IS TO MAIN ON-SITE Federal Way Construction In ection Record INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 12 -105319 -00 -ME Address: 34609 31ST PL SW Project: VICTORIA J VUKELICH FEDERAL WAY, WA 98023-3318 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date Date 19, —oz, ! `2 Rough Electrical Approved 1:1Approved Final Electrical Right of Way Approved By Date By Date By Date