Loading...
15-101829City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 0 FILE 1.11 Me6anical Permit #: 15 -101829 -00 -ME Inspection Request Line: (253) 835-3050 Project Name: COLON-MALDONADO 3 (,C) Project Address: 33819 31ST AVE SW Parcel Number. 9542801490 Project Description: REMOVE AND REPLACE GAS WATER HEATER IN THE SAME LOCATION Owner AR I� Contractor LUIS A COLON-MALDONADO NICOLE TRAZO FAST WATER HEATER CO (GENERAL) 33819 31ST AVE SW FAST WATER HEATER COMPANY FASTWWH948BC (1/4/16) FEDERAL WAY WA 11715 NORTH CREEK PKWY 11715 NORTH CREEK PARKWAY S 98023-7797 BOTHELL WA 98011 BOTHELL WA 98011 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures' Hot Water Tanks ........................... 1 PERMIT EXPIRES Sunday, October 112015 Permit Issued on Tuesday, April 14, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: FINALES) THIS CARD IS TO MAIN ON-SITE "T"OF Construction In ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 15 -101829 -00 -ME Address: 33819 31ST AVE SW Project: LUIS A COLON-MALDONADO FEDERAL WAY, WA 98023-7797 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card 0 Mechanical Rough -in (4165) 0 Gas Piping (4125) 0 Final - Mechanical (4065) 1:1Approved Approved By Approved to release test Approved By Date By Date By Date 5- Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date