Loading...
12-104821Mechanical City of Federal Way Community & Econ. Dev. Services Permit #. 12-104821 -00-ME 33325 8th Ave S FIL&M Federal Way, WA 98003 Inspection Request Line: Ph: (253) 835-2607 Fax: (253) 835-2609 P Q (253) 835-3050 Project Name: SHAW Project Address: 33747 31ST AVE SW Parcel Number: 9542801430 Project Description: REMOVE AND REPLACE GAS WATER HEATER IN EXISTING LOCATION Owner A n_ g; licant Contractor RICK SHAW JESSICA VARON FAST WATER HEATER CO (GENERAL) JILL SHAW FAST WATER HEATER COMPANY FASTWWH948BC (1/4/14) 13420 246TH AVE SE 12601 132ND AVE NE 12601 132ND AVE NE ISSAQUAH, WA 98027 KIRKLAND WA 98034 KIRKLAND WA 98034 Additional Permit Information Mechanical Valuation............................................959 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Hot Water Tanks ............................ 1 PERMIT EXPIRES Saturday, April 20, 2013 Permit Issued on Monday, October 22, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ^ IL I I I 1k I = Date: %ill LMI IN 17 A �•� At 'J 1i��12 CITY OF Federal Way PERMIT #: • THIS CARD IS TO IN ON-SITE Construction In 'fie Record INSPECTION REQ TS: (253) 835-3050 12 -104821 -00 -ME Address: 33747 31 STAVE SW Project: RICK SHAW FEDERAL WAY, WA 98023-7721 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165) ❑ Gas Piping (4125) Final - Mechanical (4065) Approved Right of Way Approved _ Approved to release test Approved By Date By Date B Dat Rough Electrical Approved Final Electrical Approved Right of Way Approved _ By Date By Date By Date