15-105992City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: GEIGER
Project Address: 34505 30TH AVE SW
Project Description: Gas pipe to furnace
rYY". 1
Mechanical
Permit #: 1.5 -105992 -00 -ME
Inspection Request Line: (253) 835-3050
Parcel Number: 797200 0090
Owner
ARRlicant
Contractor
AARON T GEIGER
JAMES GOSNELL
BOB'S HEATING & A/C INC (GENERAL)
34505 30TH AVE S
BOB'S HEATING & A/C INC
BOBSHHA9790B (9/3/17)
FEDERAL WAY WA 98023-3020
13633 NE 126TH PL SUITE 350
13633 NE 126TH PL SUITE 350
KIRKLAND WA 98034
KIRKLAND WA 98034
Additional Permit Information
Mechanical Work Valuation?.................................600.00 Is this an Online or O.T.C. application? ................. Yes
Mechanical Fixtures
Gas Pipe Outlets ............................. 1
PERMIT EXPIRES Monday, May 23, 2016
Permit Issued on Wednesday, November 25, 2015
hereby certify that the above information is correct and that the construction on the ab escribed property and
the occupancy and the use will be in accordance with the laws, rules and regulations of g
p y eg of Washington
aQd tDq, City of Federal Way. d� m
Owner or agent: J 1 V 1 1 1 \I 1"' Date:
s ,
CITY OF
Federal Way
PERMIT #:
• THIS CARD IS TOAIN ON-SITE M
Construction In ection Record
INSPECTION REQUE TS: (253) 835-30.50
15 -105992 -00 -ME
Address: 34505 30TH AVE SW
Project: AARON T GEIGER FEDERAL WAY, WA 98023-3020
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)Gas
Piping (4125)
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By A t,� Date Z l 15
By 6 t Dater 1
Rough Electrical
ApprovedApproved
Final Electrical
Right of Way
Approved
By
Date
By
DateBy
Date