Loading...
12-104154A ^� City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: DAO 0 Y F I L Project Address: 33404 29TH PL SW Project Description: Replace gas furnace • Mechanical Permit #: 12 -104154 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 010060 0980 Owner ARRIlican Contractor ALEX T LEUNG JAIMIE HOW BRENNAN HEATING & A/C LLC QUYNH GIAO DAO BRENNAN HEATING & A/C (GENERAL) 33404 29TH PL SW 4601 S 134TH PL BRENNHA97IR9 (12/29/13) FEDERAL WAY WA SEATTLE WA 98168 4601 S 134TH PL 98023 TUKWILA WA 98168 Additional Permit Information Mechanical Valuation............................................1599 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Furnaces ......................................... 1 PERMIT EXPIRES Saturday, March 9, 2013 Permit Issued on Monday, September 10, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington C C' deral WayhIF. Owner or agent: H Date: Air D CITY OF VAO Federal Way PERMIT #: 12 -104154 -00 -ME THIS CARD IS TOMAIN ON-SITE I Construction In ection Record INSPECTION REQ TS: (253) 835-3050 Address: 33404 29TH PL SW Project: ALEX T LEUNG FEDERAL WAY, WA 98023-2716 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough -in (4165)Gas Piping (4125) Final - Mechanical (4065) Approved Right of Way Approved Approved to release test Approved By Date By Date ty Date—� El Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date