12-104154A ^�
City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: DAO
0 Y
F I L
Project Address: 33404 29TH PL SW
Project Description: Replace gas furnace
• Mechanical
Permit #: 12 -104154 -00 -ME
Inspection Request Line: (253) 835-3050
Parcel Number: 010060 0980
Owner
ARRIlican
Contractor
ALEX T LEUNG
JAIMIE HOW
BRENNAN HEATING & A/C LLC
QUYNH GIAO DAO
BRENNAN HEATING & A/C
(GENERAL)
33404 29TH PL SW
4601 S 134TH PL
BRENNHA97IR9 (12/29/13)
FEDERAL WAY WA
SEATTLE WA 98168
4601 S 134TH PL
98023
TUKWILA WA 98168
Additional Permit Information
Mechanical Valuation............................................1599 Is this an Online or O.T.C. application? ................. Yes
Mechanical Fixtures
Furnaces ......................................... 1
PERMIT EXPIRES Saturday, March 9, 2013
Permit Issued on Monday, September 10, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
C
C' deral WayhIF.
Owner or agent: H Date:
Air D
CITY OF VAO
Federal Way
PERMIT #:
12 -104154 -00 -ME
THIS CARD IS TOMAIN ON-SITE I
Construction In ection Record
INSPECTION REQ TS: (253) 835-3050
Address: 33404 29TH PL SW
Project: ALEX T LEUNG FEDERAL WAY, WA 98023-2716
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0
Mechanical Rough -in (4165)Gas
Piping (4125)
Final - Mechanical (4065)
Approved
Right of Way
Approved
Approved to release test
Approved
By
Date
By
Date
ty Date—�
El
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date