Loading...
13-100391b 4 City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Project Name: TUCKER Project Address: 34317 35TH AVE SW Project Description: Gas to gas 80k York furnace replacement. r d Mechanical Permit #: 13 -100391 -00 -ME Inspection Request Line: (253) 835-3050 v`+' 0 $'04170 i� Parcel Number: 308900 0085 Owner ARRlican Contractor DONNIE L TUCKER WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO SHARON M TUCKER NORTHWEST PERMIT/ WESCO (GENERAL) 34317 35TH AVE SW 1345 W GULF RD WASIRES97IOB (9/2/13) FEDERAL WAY WA 98023-2939 POINT ROBERTS WA 98281 2800 THORNDYKE AVE W SEATTLE WA 98199 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures' Furnaces ......................................... 1 PERMIT EXPIRES Tuesday, July 23, 2013 Permit Issued on Thursday, January 24, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: FrN/stl�D z�IS��3 7i HIS CARD IS TO REMAIN ON-SITE CITY OF - Construction In ection RecordFederal Way RE UE1TS: 253 835-3050 PERMIT #: 13 -100391 -00 -ME Address: 34317 35TH AVE SW Project: DONNIE L TUCKER FEDERAL WAY, WA 98023-2939 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough -in (4165)Gas Piping (4125) Final Electrical Final - Mechanical (4065) Approved By Approved to release test Approved By Date By Date By Date 2-,S" -%( Rough Electrical Approved 1:1Approved Final Electrical Right of Way Approved By Date By Date By Date