Loading...
14-101620` ` 6Mechanical City of Federal Way r Community & Ecpn. Dev. Services ermit #: 14 -101620 -00 -ME FILE33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (2 53) (253) 835-2607 Fax: (253) 835-2809 pact eQ (53) 835050 Project Name: HAHN Project Address: 33810 35TH AVE SW Parcel Number: 109960 0020 Project Description: Fireplace insert with 5' piping Owner ARRlican Contractor CLIFFORD HAHN NORTHWEST PERMIT/ WESCO WASHINGTON ENERGY SERVICES CO 33810 35TH AVE SW 1345 W GULF RD (GENERAL) FEDERAL WAY WA 98023-2934 POINT ROBERTS WA 98281 WAST ES97IOB (9/2/15) 2800 THORNDYKE AVE W SEATTLE WA 98199 Additional Permit information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures Fireplace Inserts ............................. 1 Gas Pipe Outlets............................. 1 PERMIT EXPIRES Tuesday, October 7, 2014 Permit Issued on Thursday, April 10, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent I I I IL I irmn Date: --0NL=111Q GSIVNIJ� crrr of THIS CARD IS TO MAIN ON-SITE , 1/� • Federal Wa THIS In ectlon Record y INSPECTION REQ TS: (253) 835-3050 PERMIT #: 14 -101620 -00 -ME Address: 33810 35TH AVE SW Project: CLIFFORD HAHN FEDERAL WAY, WA 98023-2934 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date Dat_e FILE ❑ Rough ElectricalE]Final Approved Electrical Approved ❑ Right of Way Approved By Date By Date By Date