16-103581WON
0 Electrical
it #: 16 -103581 -00 -EL
C1of Federal Way
Community &Econ. ev. Services FILE
Perm•33325 8th Avve S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609 Inspection Request Line: (253) 835-3050
Project Name: QUAIL RUN CONDOMINIUMS
Project Address: 31906 34TH PL SW Unit 33
Project Description: Run circuit for 2 1/2 ton a/c
Parcel Number: 698000 0330
Owner
A licant
Contractor
GEORGE SOLANDROS
JAME HOW
BRENNAN HEATING & A/C LLC
JANICE R SOLANDROS
BRENNAN HEATING & A/C
(ELECTRICAL 01)
31906 34TH PL SW
4601 S 134TH PL
BRENNHA962DU (3/31/18)
FEDERAL WAY WA 98023
SEATTLE WA 98168
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Electrical Work Valuation?....................................300 Is this an Online or O.T.C. application? ................. Yes
Is Use Educational or Institutional? ....................... No
Electrical Fixtures
Circuits - Residential ...................... 1 Thermostat..................................... 1
PERMIT EXPIRES Tuesday, July 25, 2017
Permit Issued on Monday, July 25, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: OKI 1. .1 N1 Date:
FINALEDJ
Cm CW
Federal Way
PERNUT #:
• �''THIS CARD IS TOVTS:
ON-SITE r
Construction Inon Record
INSPECTION REQ3) 835-3050
16 -103585 -00 -EL
Address: 34542 8TH AVE SW
Project: MICHAEL NIENDORFF FEDERAL WAY, WA 98023-8402
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Final - Electrical (4055)
Approved
By Vw3 Date
UFER Ground (
Ditch cover (4030)Slab/Concrete
11
r (4255)
0
Approved
By
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By Vw3 Date
Pool Bonding (4195)
0
Temporary Power (4275)
0
Service (4235)
By
Approved
By
Approved
By
Approved
By
Date
By
Date
By
Date
0
❑
Feeders/Sub-panels (4045)
Rough Electrical (4225)
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By Vw3 Date
Rough Electrical
Approved
0
Final Electrical
Approved
0
Right of Way
Approved
By
Date
By
Date
By
Date