Loading...
14-105203Project Name: STANTON Project Address: 31815 34TH PL SW Unit 78 Project Description: wire furnace and heat pump -Electrical Permit #: 14 -105203 -00 -EL Inspection Request Line: (253) 835-3050 Parcel Number: 6980010130 Owner A nlicant City of Federal Way BARCLAY STANTON JEFF FISCHER Community &Econ. Dev. Services BARBARA STANTON FILE 33325 8th Ave S 31815 34TH PL SW 17347 SE 265TH ST Federal Way, WA 98003 FEDERAL WAY WA 98023-2235 COVINGTON WA 98042 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: STANTON Project Address: 31815 34TH PL SW Unit 78 Project Description: wire furnace and heat pump -Electrical Permit #: 14 -105203 -00 -EL Inspection Request Line: (253) 835-3050 Parcel Number: 6980010130 Owner A nlicant Contractor BARCLAY STANTON JEFF FISCHER EAGLE ELECTRIC OF AUBURN LLC BARBARA STANTON EAGLE ELECTRIC LLC EAGLEEA911LC (6/6/15) 31815 34TH PL SW 17347 SE 265TH ST PO BOX 1422 FEDERAL WAY WA 98023-2235 COVINGTON WA 98042 AUBURN WA 98071 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional? ....................... No Electrical Fixtures Circuits - Residential ...................... 2 Thermostat..................................... 1 PERMIT EXPIRES Monday, April 6, 2015 Permit Issued on Wednesday, October 8, 2014 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: aft IL 2 a 2 IL a In Date: U N L.1 IN IF= — G AA v �c.a-oaf q� f3 oX MKT:t la n 3f, / (4*0-0 L&SAA E V — c.t ►ZGLt t r D I�t�r�-�,�,� I LFINN -� TILS CARD IS TO bN-SIT I CITY OF Construction In ection Record Federal Way INSPECTION REQ TS: (253) 835-3050 PERMIT #: Project: 14 -105203 -00 -EL BARCLAY STANTON Address: 31815 34TH PL SW Unit 78 FEDERAL WAY, WA 98023-2238 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Pool Bonding (4195) LIFER Ground (4295)Ditch Temporary Power (4275) cover (4030) Final Electrical Approved Slab/Concrete Floor (4255) Approved Approved Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) Rough Electrical Approved Temporary Power (4275) Final Electrical Approved Service (4235) Approved Right of Way Approved Date Approved By Date By Date Date By Date ❑ E] Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved Date t\. �v Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date