Loading...
18-102986Mechanical etiityDei ede�rw,y Permit #:18 -102986 -00 -ME eommunisy Dcvelopmeat D. 33325 8th Ave s Federal Way, WA 98003' Inspection -Request Line: (253) 835-3050 Ph: (253) 8352607 Fax (253) 835-2609 LE Project Name: BECHTEL Project Address: 32216 40TH PL SW Parcel Number: 873196 0370 Project Description: Replace Existing Gas Furnace. Owner Applicant Contractor SHEILA HUFNAGEL BECHTEL JAIMIE HOWBRENNAN HEATING & A/C BRENNAN HEATING & A/C LLC 688 VALLEY LN 4601 S 134TH PL (GENERAL 01) BOULDERCO SEATTLE WA 98168 BRENNHA971R9 (12/29/19) 80302 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Mechanical Work Valuation? .................................. 3699 Is this an Online or O.T.C. application?.................. Yes Furnaces PERMIT EXPIRES Saturday, 5 January, 2019 Permit Issued on Monday, July 9, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of as i toItEf Federal Way. Owner or agent: �� Date: FINALED crry THIS CARD'IS TO REMAIN ON-SITE Federal Way Construction Inspection Record INSPECTION REQUESTS: (253) 8353050 PERNM #: 18102986 00 Address: 32216 40TH PL SW Project: TAD BECHTEL FEDERAL WAY WA 98023-2451 Scheduled inspections 71Y be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough -in (4165) 0 Gas Piping (4125) 0 Final - Mechanical (4065) Approved 1By Approved to release test Approved By Date Date Date ( p ob Approved By ❑ 0 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date