18-103983i a 1 r i
Mechanical
City of Federal Way Permit #:18 -103983 -00 -ME
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003 FILE Inspection Request Line: 253 835-3050
p q
Ph: (253) 835-2607 Fax (253) 835.2609
Project Name: CHUN
Project Address: 34614 11TH CT SW Parcel Number: 132173 0430
Project Description: Replace 80% gas furnace with 90% gas furnace. Add A/C
Owner
Applicant
Contractor
DAVID CHUN
AMANDA RAYTAHOMA HEATING &
TAHOMA HEATING & COOLING LLC
34614 11TH CT SW
COOLING LLC
TAHOMHC822BT (1/30/20)
FEDERAL WAY WA 98023-7046
10202 PACIFIC AVE S SUITE 101
10202 PACIFIC AVE S SUITE 101
TACOMA WA 98444
TACOMA WA 98444
Additional Permit Information
Mechanical Work Valuations ...... 8500 Is this an Online or O.T.C. application? .................. Yes
Compressors / Heat Pumps I Furnaces 1
PERMIT EXPIRES Monday, 25 February, 2019
Permit Issued on Wednesday, August 29, 2018
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 0 INIF; Date:
F'i�JALED
THIS CARD IS TO REMAIN ON-SITE
CFrVOFWa Construction Inspection Record
Fecleral Way INSPECTION REQUESTS: (253) 835-3050
PERNM #: 18103983 00 Address: 3461411TH CT SW
Project: DAVID CHUN FEDERAL WAY WA 98023-7046
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El
Mechanical Rough -in (4165)
0
Gas Piping (4125)
Final - Mechanical (4065)
Approved
1By
Approved to release test
Approved
By
Date
Approved •
Date
Date l d
Approved
By
Date
By
Rough Electrical
Final Electrical
Right of Way
Approved
Approved •
Approved
By
Date
By
Date
By
Date