Loading...
18-104557City of Federal Way Applicant Community Development Dept. FILE 33325 8th Ave S PACIFIC AIR SYSTEMS (GENERAL) Federal Way, WA 98003 COOLING Ph: (253) 835-2607 Fax. (253) 835.2609 FEDERAL WAY WA 98003 Project Name: RODRIGUEZ Project Address: 30626 8TH AVE S Project Description: GAS FURNACE REPLACEMENT Mechanical Permit #:18 -104557 -00 -ME Inspection Request Line: (253) 835-3050 Parcel Number: 091800 0060 Owner Applicant Contractor CARLOS RODRIGUEZ RACHAEL AILSHIEPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 30626 8TH AVE S COOLING PACIFAS093KA (9/8/19) FEDERAL WAY WA 98003 8607 DURANGO ST SW 12811 PACIFIC HWY SW USA LAKEWOOD WA 98499 LAKEWOOD WA 98499 Additional Permit Information Mechanical Work Valuation? .................................. 7217 Is this an Online or O.T.C. application?.................. Yes k„ i�€€EZ. Cj Ef ?J li sAI E 1; J!•_ PERMIT EXPIRES Tuesday, 26 March, 2019 Permit Issued on Thursday, September 27, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of %wash!�r���of Federal Way. Owner or agent: Date: FINALED THIS CARD IS TO REMAIN ON-SITE cffv or Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERNM #: 18104557 00 Address: 30626 8TH AVE S Project: MARICRUZ RODRIGUEZ FEDERAL WAY WA 98003-4115 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough -in (4165) El Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved f By Date 1By Date 1]3y<Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date I By Date By Date