10-100492.10, ~
Mechanical
City oTFederal Way � .{.�
Community Development Services q Pel mit #: 10-1 00492 -00 -ME
P.O. Box 9718
Federal Way, WA 98063-9718 �' Inspection Request Line: 253 83
Ph: (253) 835-2607 Fax: (253) 835-2609 p Q ( 5-3050
Project Name: RODRIGUEZ
Project Address: 36102 14TH AVE SW
Project Description: change out 1 gas water heater
Parcel Number: 218000 0770
Owner
Applicant
Contractor
MICHAEL RODRIGUEZ
CARLYNN WEBSTER
WASHINGTON WATER HEATERS INC
36102 14TH AVE S
WASHINGTON WATER HEATERS INC
WASHII'980OP (9/17/10)
FEDERAL WAY WA 98023-7283
1800 RICHARDS RD SUITE A
1800 RICHARDS RD SUITE A
BELLEVUE WA 98005
BELLEVUE WA 98005
Mechanical Valuation............................................1431.55 Is this an Online or O.T.C. application? ................. Yes
Hot Water Tanks ............................ 1
PERMIT EXPIRES Monday, August 2, 2010
Permit Issued on Wednesday, February ,3, 2010
1 hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date: ' .3
rwhu4b zrro/ro
CITY OF
Federal Way
PERMIT #:
Owner:
..
• THIS CARD IS TO AIN ON-SITE
Construction Ins tion Record
INSPECTION REQUE TS: (253) 835-3050
10 -100492 -00 -ME Address: 36102 14TH AVE SW
MICHAEL RODRIGUEZ FEDERAL WAY, WA 98023-7283
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)Gas
Piping (4125)
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Date
By - Date ?i
/ •v
s
❑
Rough Electrical
Approved
❑Final
Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date