Project Name: PARKER
Project Address: 33416 26TH AVE SW
Building - Single Fantily
Permit #: 11 -105052 -00 -SF
Inspection Request Line: (253) 835-3050
�Ll
G Parcel Number: 932090 0130
Project Description: Install mini -split system, floor insulationwater heater and (1) bath fan
Owner
Applicant
Contractor
Lender
MAXINE PARKER
KING COUNTY HOUSING AND
33416 26TH AVE S
33416 26TH AVE S
COMMUNITY DEVELOPMENT
FEDERAL WAY WA 98023-2818
FEDERAL WAY WA 98023-2818
401 5TH AVE S SUITE 510
SEATTLE WA 98104
Census Category: 434 - Residential alt/add - no change in number of units
Includes: # 1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.) 0 0 0 0
New / Additional Sq. Feet - 3rd Floor....................0
Mechanical to be Included?....................................Yes
New / Additional Sq. Feet - Basement....................0
Plumbing to be Included? .......................................Yes
y k 410
Fans................................................ 1
Water Heaters ................................. 1
PERMIT EXPIRES Tuesday, June 19, 2012
Permit Issued on Thursday, December 22, 2011
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the useAll be in accordance with the laws, rules and regulations of the State of Washington
/' and the City of Federal Way.
Owner or agent: "Af P7,
Alt
CITY or
Federal Way
PERMIT #:
Project:
11 -105052 -00 -SF
MAXINE PARKER
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUE TS: (253) 835-3050
r.s
Address: 33416 26TH AVE SW
FEDERAL WAY, WA 98023-2818
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Gas Piping (4125)
Approved to release test
By Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
SWM Precon Site Mtg (4400)
Final Erosion Control (4375)Final
Initial Erosion Control (4365)
E]
Plumbing Groundwork (4190)
Approved to install mud & tape
Approved
Approved
To be done prior to breaking ground
By
Approved to cover
By
Date
By
Date
By
Date
Gas Piping (4125)
Approved to release test
By Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
Underfloor Framing (4285)
Final Erosion Control (4375)Final
Approved
Floor Sheathing (4105)
Date
Approved to install mud & tape
Shear Walls (4245)
Approved
Approved to sheath floor
By
Approved to insulate
Approved to install flooring
Date
Date
Approved to install siding
By
Date
By
Date
By
Date
Roof Sheathing (4220)
Rough Plumbing (4230)
Mechanical Rough -in (4165)
Approved to install roofing
Approved
Approved
By
Date
By
Date
By
Date
Gas Piping (4125)
Approved to release test
By Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
El Interim Erosion Control (4370)
Approved
By Date
Insulation (4150)
Approved to install wallboard
By Date
Gypsum Wallboard Nailing (4130)
Fire/Draft Stops (4095)
Final Erosion Control (4375)Final
Approved
By
Date
Approved to install mud & tape
Right of Way
Approved
Approved
Framing (4120) _
By
Approved to insulate
By
Date
El Interim Erosion Control (4370)
Approved
By Date
Insulation (4150)
Approved to install wallboard
By Date
Gypsum Wallboard Nailing (4130)
E:]
Final Erosion Control (4375)Final
Final - Building (4050)
- Mechanical (4065)
Approved to install mud & tape
Right of Way
Approved
Approved
Approved
By
Approved
By Date
By
Date
Date
By
Date
EJ
Final - Plumbing (4075)
Final - Building (4050)
Approved
Right of Way
Approved
By
Approved
By
Date
Date
By
Date
EJ
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date