Loading...
11-105052I A City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 L. Project Name: PARKER Project Address: 33416 26TH AVE SW Building - Single Fantily Permit #: 11 -105052 -00 -SF Inspection Request Line: (253) 835-3050 �Ll G Parcel Number: 932090 0130 Project Description: Install mini -split system, floor insulationwater heater and (1) bath fan Owner Applicant Contractor Lender MAXINE PARKER KING COUNTY HOUSING AND 33416 26TH AVE S 33416 26TH AVE S COMMUNITY DEVELOPMENT FEDERAL WAY WA 98023-2818 FEDERAL WAY WA 98023-2818 401 5TH AVE S SUITE 510 SEATTLE WA 98104 Census Category: 434 - Residential alt/add - no change in number of units Includes: # 1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) 0 0 0 0 New / Additional Sq. Feet - 3rd Floor....................0 Mechanical to be Included?....................................Yes New / Additional Sq. Feet - Basement....................0 Plumbing to be Included? .......................................Yes y k 410 Fans................................................ 1 Water Heaters ................................. 1 PERMIT EXPIRES Tuesday, June 19, 2012 Permit Issued on Thursday, December 22, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the useAll be in accordance with the laws, rules and regulations of the State of Washington /' and the City of Federal Way. Owner or agent: "Af P7, Alt CITY or Federal Way PERMIT #: Project: 11 -105052 -00 -SF MAXINE PARKER THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUE TS: (253) 835-3050 r.s Address: 33416 26TH AVE SW FEDERAL WAY, WA 98023-2818 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Gas Piping (4125) Approved to release test By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 SWM Precon Site Mtg (4400) Final Erosion Control (4375)Final Initial Erosion Control (4365) E] Plumbing Groundwork (4190) Approved to install mud & tape Approved Approved To be done prior to breaking ground By Approved to cover By Date By Date By Date Gas Piping (4125) Approved to release test By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Underfloor Framing (4285) Final Erosion Control (4375)Final Approved Floor Sheathing (4105) Date Approved to install mud & tape Shear Walls (4245) Approved Approved to sheath floor By Approved to insulate Approved to install flooring Date Date Approved to install siding By Date By Date By Date Roof Sheathing (4220) Rough Plumbing (4230) Mechanical Rough -in (4165) Approved to install roofing Approved Approved By Date By Date By Date Gas Piping (4125) Approved to release test By Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 El Interim Erosion Control (4370) Approved By Date Insulation (4150) Approved to install wallboard By Date Gypsum Wallboard Nailing (4130) Fire/Draft Stops (4095) Final Erosion Control (4375)Final Approved By Date Approved to install mud & tape Right of Way Approved Approved Framing (4120) _ By Approved to insulate By Date El Interim Erosion Control (4370) Approved By Date Insulation (4150) Approved to install wallboard By Date Gypsum Wallboard Nailing (4130) E:] Final Erosion Control (4375)Final Final - Building (4050) - Mechanical (4065) Approved to install mud & tape Right of Way Approved Approved Approved By Approved By Date By Date Date By Date EJ Final - Plumbing (4075) Final - Building (4050) Approved Right of Way Approved By Approved By Date Date By Date EJ Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date