15-103508Project Name: GABRIELSON
Project Address: 30236 21ST AVE S
Building - Single Family
Permit #: 15 -103508 -00 -SF
Inspection Request Line: (253) 835-3050
Parcel Number: 798290 0100
Project Description: ALT - Permit to complete work originally started under 08-101901-00 SF and to include
middle bath remodel, gas furnace replacement and addition of steam unit to master bath
shower. "Construct a walk-in closet in the master bedroom, reconfigure master bathroom,
add walk-in shower to master bath, reconfigure hallway linen closet, frame in for a
fireplace: changes reflect the deletion of 1 bedroom on the 2nd floor. Plumbing and
mechanical is included on this permit. **Roof framing change 11-07-08** *** ding gas
water heater 12/07/09*****" 7
Owner
ARRlicant
City of Federal Way
Lender
Community & Econ. Dev. Services
FILE
33325 8th Ave S
GABRIELSON
Federal Way, WA 98003
30236 21ST AVE S
Ph: (253) 835-2607 Fax: (253) 835-2609
30236 21ST AVE S
Project Name: GABRIELSON
Project Address: 30236 21ST AVE S
Building - Single Family
Permit #: 15 -103508 -00 -SF
Inspection Request Line: (253) 835-3050
Parcel Number: 798290 0100
Project Description: ALT - Permit to complete work originally started under 08-101901-00 SF and to include
middle bath remodel, gas furnace replacement and addition of steam unit to master bath
shower. "Construct a walk-in closet in the master bedroom, reconfigure master bathroom,
add walk-in shower to master bath, reconfigure hallway linen closet, frame in for a
fireplace: changes reflect the deletion of 1 bedroom on the 2nd floor. Plumbing and
mechanical is included on this permit. **Roof framing change 11-07-08** *** ding gas
water heater 12/07/09*****" 7
Owner
ARRlicant
Contractor
Lender
MICHAEL T GABRIELSON
MICHAEL GABRIELSON
30236 21 ST AMICHAEL
GABRIELSON
KATRIN GABRIELSON
30236 21ST AVE S
FEDERAL WAV A
30236 21ST AVE S
30236 21ST AVE S
FEDERAL WAY WA
980 2
FEDERAL WAY WA
FEDERAL WAY, WA 98003
980034249
980034249
V
Census Category: 434 - Residential alt/add -
Includes: #1
'
Occupancy Class:
R-3
Construction Type:
Type V -
Occupancy Load
Floor Areas . ft.
0
�1
New / Additional Sq. Feet - 3rd Floor....................0
0
inunwof units
#4
0 1 0
it Pern�t ;� ation
New / Additional Sq. Feet - Basement...................0
Occupancy # 1 - Construction Type........................T V - B Mechanical to be Included?................................... Yes
Occupancy # 1 - Class ......... .............. ...... -3 r Plumbing to be Included? ....... %............................... Yes
Occu anc # 1 - Use ................. ... ........ Resideice 2 Zoning Designation................................................RS 7.2
Occupancy g
��// fa it
If U10
apical Fixtures
Ducting ......... ...... .......... .. 1 s................................................ 2 Fireplace Inserts............................. 1
Furnaces ........... ................. ..... 1 Hot Water Tanks............................ 1
Plumbing Fixtures
Showers......................... .............. 1 Sinks............................................... 2
PERMIT EXPIRES Wednesday, January 13, 2016
Permit Issued on Friday, July 17, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will a in accordance with the laws, rules and regulations of the State of Washington
Aid the 4 of Federal Way.4.12 Of z
Owner or agent: Date: 7-17-15-
THIS CARD IS TO REMAIN ON-SITE
CITY OF rConstruction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 15 -103508 -00 -SF Address: 30236 21 STAVE S
Project: MICHAEL T GABRIELSON FEDERAL WAY, WA 98003-4249
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑
SWM Precon Site Mtg ( 400)
❑
Initial Erosion Control (4365)
❑
Footings/Setback (4110)
By
Approved
Floor Sheathing (4105)
To be done prior to breaking ground
By
Approved to place concrete
By
Date
By
Date
By
Date
El
Rough Electrical
Approved
Plumbing Groundwork (4190)
Final Electrical
Approved
Underfloor Framing (4285)
Right of Way —^
By
Date
Floor Sheathing (4105)
Date
By
Approved to cover
Approved to sheath floor
Approved to install flooring
By
Date
By
Date
By
Date
13
Shear Walls (4245)
Roof Sheathing (4220)
Rough Plumbing (4230)
Approved to install siding
Approved to install roofing
Approved
By
Date
By
Date
By
Date _
Mechanical Rough -in (4165)
E]
Gas Piping (4125)
Fire/Draft Stops (4095)
Approved
Approved to release test
Approved
ByIA_�7 Date _
By
Date
By
Dated
—4 (f
Interim Erosion Control (4370)
pr:toheduling a Framing inspection;
Framing (4120)
Approved
Electrmbing &Mechanical Rough -in and
Approved to insulate
By
Date
Fire/Dinspections must be signed -off and
pproved. IBC 1093.4
BY
Date
❑
IJ Gypsum Wallboard Nailing (4130)
Insulation (4150)
Final Erosion Control (4375)
Approved to install wallboard
Approved to install mud & tape
Approved
ByLL�L
Date l
By
A j Date q 211 (t
By
Date
Final - Mechanical (4065)
Final - Plumbing (4075)
E]
Final - Building (4050)
Approved
Approved
Approved
By
Date
By
Date
By
Date
El
Rough Electrical
Approved
Final Electrical
Approved
1:1Approved
Right of Way —^
By
Date
By
Date
By
Date
1�CITY OF
Federal Way
Building Division
33325 Eighth Avenue South
Federal Way, WA 98003-6325
Phone 253-835-2607 Fax 253-835-2609
CORRECTIO NOTICE
ADDRESS: 3e1.3 s• Z�s—Ar S. PERMIT#: l5` I o3 raS'` oo - sF
1 1 P-� 1 o "1.3 - 6vo , d U, S w, Int a { G `vi,s �t, i
77o l �'
IF YOU HAVE QUESTIONS CALL V\ -&u+' (253) 835- --L,?-3
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
3 7,1 l(v
DATE
INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of
13
700 Anderson - Peyton Sheet 1 of
]OO Structural Engineering Consultants Date: 10/27/08
30❑ A Division of ACP Consultants, Inc. Design By: MAA
Project & Location:
Structural Calculations
for
Roof Framing revision
for
Client: Mike Gabrielson
30236 21" Ave South
Federal Way, WA 98003
253-941-2478 (home)
mikegabrielson@hotmail.com
Structural
Engineer: Anderson - Peyton
Structural Engineering Consultants
31620 23rd Ave South, Suite 321
Federal Way, WA 98003
Mark A Anderson, PE, SE
manderson@anderson-peyton.com
(253) 941-9929
Project Number: 08-200
Jurisdiction: Federal Way, WA
Code: 2006 113C
PERMIT #: 15 -103508 -00 -SF
ADDRESS: 30236 21 st Avenue S
PROJECT: Remodel
GABRIELSON
DATE: 7117115
FILE
08-101901
RESUBMITTED
NOV o 7 2m
CITY OF FEDERAL WAY
BUILDING DEPT.
I-
n-
■
CITY OF
Fed
ADDRESS:
I . c oo lAe_
eral Way
CORRE
a�N
C
I, , (tea r
Building Division
33325 Eighth Avenue South
Federal Way, WA 98003-6325
Phone 253-835-2607 Fax 253-835-2609
N NOTICE
PERMIT#: 15 — /03509
IF YOU HAVE QUESTIONS CALL AvAy (253) 835- 2(o3j
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
31 lqll� A, cj
DATE INSPECTOR
DO NOT REMOVE THIS NOTICE
Page
LJVIN- AH.E-",
582 sq t
BILE
;-;Uo mo
m m )
Ln
2
ND
j 9 3
01 Fn DL r\) Lr,
,r— (D N0
90
0 > 0
z < (P
(D C")
:3 -n
C
(D
C/)